023 9396 0313 Get a written quote
A 1930s semi-detached house with a re-covered tiled roof

Roof Replacement in Havant

A full strip and re-cover, followed from ridge to gutter: survey, scaffold, underlay, battens, covering and the building regulations route.

10-year workmanship guarantee, in writing

A new roof, followed from ridge to gutter

A full strip and re-cover, in the order rain travels: six places it gets in, and what a re-roof does about each one.

A high view looking down on a clay tile roof, its ridge, hips and brick chimney
Ridge tiles capping the top of a roof.

The stain says where the water stopped. The survey finds where it started.

RidgesThe survey starts on the top line

A roof replacement in Havant begins with a survey, and ours begins at the ridge, the capping line along the top of the roof, because that is where rain starts its run. From there we follow the route down: the hips (the sloping corners), the slopes, the joins at chimneys and walls, the eaves and the gutter. Then we go into the loft and look at the same route from underneath.

The survey answers one question before any other: does this roof need a repair or a replacement? One cracked ridge tile above otherwise good slopes is a repair, and we will tell you so. These signs point past a repair:

  • slipped or broken tiles spread across a slope rather than in one patch
  • underlay in the loft that has torn or perished, with daylight showing through
  • battens that crumble, or nails that no longer hold
  • a leak that comes back in a new place after each repair

Our guide to when a roof needs replacing takes those signs one at a time.

On a full re-cover the ridge is the last thing to go back on. Each ridge tile is fixed mechanically, so mortar is never the only thing holding it. A loose ridge on an otherwise new roof lets rain in at the highest point, with the whole slope below it. The hips get the same treatment, since rain let in at either one runs down the same rafters and ends up on the same ceilings.

What we check at the survey

Ridge
Joints, bedding and fixings
Hips
Corner tiles and their fixings
Slopes
Slipped, broken or porous tiles
Loft
Underlay, battens and damp timber

Stains are not verdicts

A stain on the landing ceiling tells you where the water stopped, not where it started. That is why we do not price a new roof from the street or from a photograph of the damp patch. Rain can run along a batten or down a rafter for some way before it drips, so the choice between repair and replacement waits until the route has been walked from both sides.

Where it shows

A bedroom ceiling stain, some way down the slope from the top of the roof.

Where it gets in

A gap in the ridge line between neighbouring tiles, letting rain onto the underlay and down the rafter.

A tiled pitched roof
A tiled slope, laid course by course.

Can the new covering differ from the old one?

Yes. On a house a change of covering is normally permitted development, and our planning guide gives the conditions. What we check is its weight, its fire performance and the minimum pitch.

SlopesStripping the old covering and laying the new

The slopes are the sheet the rain runs down, and on a re-roof everything on them comes off. We strip the old tiles or slate, the battens and the underlay back to the rafters, in sections, so that the open part of the roof can be covered if rain comes in. Sound tiles or slates can sometimes go back on, and we tell you at the survey whether yours can.

Then the roof installation runs in a fixed order: underlay, battens, covering, ridge. Clay or concrete tile and natural or man-made slate all follow it. Our pitched roofing page goes into tile choice and our slate roofing page into slate.

Two things about the new covering decide the paperwork. Approved Document A treats a roof load increased by more than 15% as a significant change, so a covering that much heavier needs Building Regulations approval and a structural check. A covering whose performance in a fire would be significantly different needs approval too. So we weigh the new covering against the old one on paper before anything is ordered.

Building control is carried out by the council's building control team or by a registered building control approver. In Havant, we confirm the building regulations route with your building control body before work starts, and our guide to building regulations for re-roofing sets out the test and who to tell. New roofs in Havant go through the same steps as any other: survey, route, strip, build back, sign-off.

The order stays the same on every slope: underlay, battens, covering, then the ridge.

Pitch before product

A covering that suits one roof can be wrong for another. Each tile or slate has a minimum pitch on its maker's data sheet, so we measure the slope at the survey and read the sheet before suggesting anything. Changing the look of a roof is fine where the pitch allows it. Where it does not, we explain what would suit that slope instead, so you choose between things that will work.

What comes off the roof

Covering
Old tiles or slate
Battens
Stripped with the covering
Underlay
Taken back to the rafters
Stepped lead flashings dressed down the side of a stone chimney stack on a slate roof
Lead flashing stepped up the side of a chimney.

Does the lead get replaced with the roof?

Where it has split, thinned or pulled out of its joint, yes. Sound lead can stay and be dressed back over the new covering, and the survey tells you which applies on your roof.

AbutmentsWhere a slope runs into a chimney or wall

An abutment is where a roof slope meets something that stands above it: a chimney stack, a house wall or the side of a dormer. Rain running down the slope has to be turned away from that join, and the flashings do the turning. Flashings are strips of lead or similar sheet, tucked into the masonry and dressed down over the covering so that rain crosses the join on top of them.

A new covering against a tired flashing leaves the old way in wide open, so flashings are part of the survey rather than an extra. We look at the lead, the joint it tucks into and the stack it is fixed to, because a chimney with open mortar joints can let rain in behind sound lead. Some work around these joins brings its own rules:

  • Removing a chimney breast always needs building regulations approval, because it is part of the building's structure.
  • Where that breast is on a party wall, the building owner serves notice on the neighbour at least two months ahead.
  • Until 24 March 2027, a new roof window works to Approved Document L Table 4.2: 1.4 W/m²K or Window Energy Rating Band B.
  • A rooflight works to 2.2 W/m²K in that same table.

From 24 March 2027 Approved Document L 2026 takes effect, with the table renumbered 3.2. We build the roof window question into the survey, because the new flashing kit and the new covering go in together.

A new slope against a tired flashing still leaves the old way in open.

Shared stacks and walls

Terraces and semis can share a stack or a wall, so flashing work may touch your neighbour's side, and we raise it early. For work to a party wall, a surveyor is needed only if the neighbour dissents or does not reply within 14 days, and written agreement from the neighbour allows an earlier start. Questions on the notice itself go to a party wall surveyor, not to building control.

Where it shows

Damp on the chimney breast in the room below, or wet timber beside the stack in the loft.

Where it gets in

A lifted flashing, or an open mortar joint where the lead tucks into the chimney stack.

Brick semis with concrete tile roofs and flat-roofed garages
New battens running across the rafters.

The strip is the one moment you get to see what your roof stands on.

BattensThe timber every tile and slate hangs from

Battens are the thin timber strips nailed across the rafters, and each tile or slate hangs from them. They also set the lap, the overlap between one course and the next, and that lap is what keeps driven rain from climbing up under the covering. Space them wrongly and the new roof has a fault built in from the first course, so we set the spacing from the maker's figures for the tile or slate going on, never from the old roof.

On a full strip the old battens come off with the covering. New ones go on, because a new roof should not hang on timber that has sat under a leaking one. Our answer on new battens and felt explains why.

The strip is also the one moment the rafters are in plain view. With the old covering gone, we look for:

  • rot at the rafter feet, where they meet the wall
  • staining under old leaks that the loft could not show
  • a rafter line that has sagged or twisted
  • old repairs that were covered over

If something turns up that the survey could not see, we show you and agree what happens next before anything is covered.

Fixings are decided here too. Coastal homes are graded for higher exposure, so the fixing specification is calculated for the site under BS 5534. A house on Hayling Island gets its own calculation, and so does one in Horndean, and neither borrows the other's numbers.

What the open roof shows

Rafters
Rot, splits and old repairs
Battens
New across the stripped slopes
Lap
Set to suit the covering
Fixings
Calculated for the site

Why the rafters matter

Everything above a rafter relies on it staying straight and sound. A dip in the rafter line shows through as a dip in the courses, and a course that dips can hold water at the lap instead of shedding it. It is far simpler to deal with a rafter while the roof is open than after new tiles are on, which is why this look at the timber happens before the underlay goes down.

Where it shows

Tiles that have dropped out of line along a course, with nothing on the ground to explain it.

Where it gets in

A soft batten or a failed nail, so the tile tips and opens the lap above it.

A gap of missing roof tiles after a gale with broken tiles on the lawn
Underlay laid in overlapping runs across a roof.

Does a new roof mean more loft insulation?

It can. Where more than half the roof is renovated, Part L expects an upgrade as far as is feasible with a payback within 15 years. The survey shows what is there now and what the re-roof has to add.

MembranesThe second line and the loft air behind it

Under the covering sits the underlay, a membrane that catches any rain or snow blown past the tiles and runs it on towards the eaves. It is the last thing between the weather and the loft, so a split in old felt turns a small fault above it into a drip on the ceiling below.

There are two broad kinds. A vapour-permeable, or breathable, membrane lets moist air from the loft pass through. A high-resistance underlay does not, so it relies on ventilation at the eaves. The kind we lay decides how the loft is ventilated, so we choose it with your loft in mind, and our answer on breathable membranes sets out the difference.

This is also where Part L of the Building Regulations comes in. Once over half of a roof is renovated, the whole of it should reach the Table 4.3 standard under Approved Document L, where that is feasible. Table 4.3 gives two figures for a roof: a threshold of 0.35 W/m²K and an improved value of 0.16 W/m²K. A renovated roof works to the improved 0.16.

Paragraph 4.13 allows for roofs where that will not work. If 0.16 is not technically or functionally feasible, or would not pay back within 15 years, the roof goes to the lowest figure that is feasible and does pay back. From 24 March 2027 Approved Document L 2026 applies, and the table becomes 3.3. We work out which of these applies when we survey, using what the loft holds now.

Under every tile sits a second line for whatever the covering lets past.

Insulation needs air

New insulation and new underlay have to be planned together. Fill the eaves with insulation and you can close the gap that a high-resistance underlay needs for its ventilation, which leaves damp air in the loft. So we look at what insulation is there now, where it sits and how the air gets in and out, then settle the underlay and the insulation as one decision, with building control told what is proposed.

What we settle before ordering

Underlay
Breathable or high resistance
Ventilation
Matched to that underlay
Insulation
Measured against Table 4.3
Route
Confirmed with building control
A blocked uPVC gutter overflowing with rainwater after a storm
Gutter, fascia and soffit along the eaves.

Should gutters and fascias be replaced at the same time?

Where they are worn, this is the sensible moment, since the scaffold is already there. Where they are sound they can stay, and the survey tells you which applies along each run.

EavesScaffold, soffits and the last step into the gutter

The eaves are the lowest edge of a roof. There the underlay runs out over the fascia, the board along the rafter ends, and into the gutter. If that last lap stops short, rain carried down the whole slope drops behind the gutter and soaks the fascia and the soffit, the board under the overhang. With the tiles off and the scaffold up, all of that edge is within reach, and fascia or soffit work is far simpler now than after the scaffold has gone.

The scaffold goes up before any of this. On the highway, scaffolding needs a licence from the highway authority, never the district council. Hampshire County Council says: "Scaffolding companies must apply on behalf of their customers." It asks for ten clear working days' notice and does not offer extensions, so the full period goes on the application, and the survey helps us set that period with the scaffolder before anything is booked. West Sussex County Council asks for at least 10 working days' notice. In Portsmouth the hoarding and scaffolding permit goes through Colas. Wherever you are, we arrange the licence with our scaffolder.

Old soffit boards get a careful look before anyone cuts them, as some older ones are asbestos insulating board. Our answer on asbestos found during a re-roof sets out what happens then.

The roof ends where the water leaves it, so we finish at the gutter: the underlay dressed in, the outlets clear, and the site left clean.

Rain carried down a whole slope needs one clean step into the gutter.

Before the scaffold comes down

The last job on a re-roof is walking the route again, from the ridge to the gutter, while the scaffold still gives a clear view of all of it. Anything we are not happy with gets put right from there. Old tiles, battens and underlay leave the site, and the ground around the house is cleared. Our answer on how long a roof replacement takes covers the time on site.

Where it shows

Peeling paint or a soft fascia, damp soffit boards, or a stain at the top of the outside wall.

Where it gets in

Underlay cut short of the gutter, so rain from the slope runs down behind the fascia.

New roof questions

Price, permission, scaffold and what can turn up once the old roof comes off.

What does a new roof cost around Havant?

Which? Trusted Traders put replacing the whole roof of an average three-bedroom house at £7,000 to £21,000 excluding VAT (November 2025), likely to be at the upper end in the South East. HomeBuilding (September 2025) says a standard three-bedroom semi with a 65m2 roof and plain concrete tiles may cost between £10,000 and £15,000, including labour, scaffolding and insulation. Those are national guides, not our prices. What moves yours is the roof's size and shape, the covering, the state of the timbers, the chimneys and the access. A roof with hips, valleys and dormers takes longer to strip and re-cover than a plain gable of the same area. After a survey your quote is one written total price, with the scaffold included. Check that any quote you hold says whether VAT is included.

Does replacing a roof need building regulations approval?

Under the Planning Portal's guide, re-roofing does not normally need a building regulations application if it affects less than 25 per cent of the building envelope and less than 50 per cent of the roof; a new covering 15 per cent or more heavier does need approval. Envelope there means the walls, floor, roof, windows, door, roof windows and roof-lights. Re-roofing in Havant sits under that national test. A full roof replacement goes past that 50 per cent line, so we treat it as a job for building control from the start. Where weight is in question, the Portal's advice is to check with a structural engineer or surveyor before commencing with works. For a Havant address, we settle the route with your building control body before the scaffold is booked.

Is planning permission needed to re-roof a house?

Normally not, for a new roof in Havant or anywhere else in England. Class C of the permitted development rules covers re-roofing a house, so a change of covering is normally permitted development. Ordinary re-roofing is normally permitted development even in a conservation area, but dormers are not, and an Article 4 direction can remove further rights, so we check with the council first. A listed home keeps its permitted development rights for roof work, although listed building consent is needed for anything that affects the building's character. Class C does not cover replacing a chimney or fitting solar equipment, and a building containing flats does not have these house rights at all. For planning queries on a Havant address, Havant Borough Council customer services are on 023 9244 6019.

Whose job is the scaffold licence, and what are the fees?

We arrange the licence with our scaffolder, under section 169 of the Highways Act 1980, wherever the scaffold stands on the highway. Each authority uses its own unit, so these do not compare. Hampshire County Council charges £211.90 on application for the first 2 weeks and £72 for each additional 2 week period, and a longer job needs a new application rather than an extension. In Portsmouth the hoarding and scaffolding permit goes through Colas, whose form gives the fee as £100 plus VAT per month. The fee West Sussex County Council lists is £266 for one month of scaffolding. Hampshire County Council adds that you do not need a licence to place scaffolding on private roads, though that does not include private streets where the public have right of access.

Can storm damage be repaired, or does it need a new roof?

Storm damage on its own does not mean a new roof, and smaller roof repairs are work we take on too. If water is coming in at the moment, the job is an emergency repair that makes the roof safe, while the replacement question waits until the roof can be surveyed. MyJobQuote says extensive storm damage repairs can cost £1,200 or more. Tell your insurer first and hold on to receipts for any temporary repair. The Financial Ombudsman Service says it will usually look at expert reports and photos of a property's condition, so take photos of the damage before anything is moved. If the survey then shows a sound roof with one damaged area, a repair is the right job, and you get the reason for that from us along with the price.

Which tiles or slate should go on, and how long do they last?

HomeBuilding gives approximate lifespans of 100+ years for Welsh slate, 60-80 years for clay tiles and 40-50 years for plain concrete tiles. Marley says that typically roof tiles are expected to last for around 60 years, and the two sources differ, so read every published figure as a guide and never a promise. The choice on your roof turns on the pitch, the weight against the old covering, any listing or planning limit, and what you want it to look like. A little maintenance helps whichever you pick: keep the gutters clear and have the flashings and the ridge looked at from time to time. Tile detail is on our pitched roofing page and slate detail on our slate roofing page, each with its own questions to work through.

What if asbestos turns up during a re-roof?

HSE advises assuming asbestos is present in any building built or refurbished before 2000; cement sheets removed whole without breaking up are non-licensed work, while work on asbestos insulating board, which HSE lists among soffit materials, is licensed unless the risk assessment shows it will be of short duration. So suspect material is identified before it is disturbed, and the route follows from what it is. Asbestos goes in a lockable skip, never an open one, and household asbestos is not covered by the consignment-note exemption. Where the risk assessment puts the work in the licensed category, that is the route it takes. On a house the question can arise at soffits, an old garage or an outbuilding beside the roof, so we ask at the survey.

Do you replace flat roofs and commercial roofs as well?

Yes, each with its own route. A flat roof re-cover in felt, EPDM rubber or GRP follows the same logic of tracing the water, but BS 6229:2025 sets a minimum finished fall of 1:80 for membrane flat roofs, so the roof is designed to a steeper fall to allow for tolerances. Replacing the waterproof membrane on a flat roof also counts as renovation under Approved Document L. MyJobQuote says that in 2026 the average flat roof replacement costs between £1,500 and £6,000. Commercial roofs work to a different volume of Approved Document L, and the client keeps its own CDM 2015 duties, so we give commercial prices after a survey of the building. Flat roofing and commercial roofing each have their own page on this site, with the detail this one leaves out.

What standards and duties sit behind a new roof?

BS 5534 is a code of practice, not law, and Marley says mortar alone can no longer be relied on as the only means of securing the roof covering. With a high-resistance underlay in a cold roof, Marley gives 25 mm of eaves ventilation at 15° or less and 10 mm above 15°. Under CDM 2015, a homeowner's client duties pass to the contractor (or the principal contractor when there is more than one), and every project has a construction phase plan. Those duties are why you are not left drawing up site safety paperwork for your own house. The building regulations sign-off is separate and comes from building control, once the work has been inspected, so keep what they issue with your house papers for when you come to sell.

Where do you fit new roofs, and how do I get started?

We fit new roofs across Havant, Emsworth, Hayling Island, Leigh Park, Waterlooville and Cowplain, into Portsmouth, Fareham and Petersfield, and east to Chichester, up to 30 road miles out across Hampshire and West Sussex. Local rules follow the address. For an Arun address: Arun District Council's building control page lists replacing roof coverings on pitched and flat roofs among alteration projects that need approval, so we confirm the route with the council before a re-roof. To start, call 023 9396 0313, message us on WhatsApp or use the quote form here. We survey, then you get one written total price. If you sign at home after our survey you have 14 days to cancel, and work starts sooner only if you ask in writing.

Where's the water showing?

You'll get one written total price.

Get a quote Call WhatsApp