Re-roofing rules

Building regulations for re-roofing: the test and who to tell

A house can be re-covered under permitted development, yet Building Regulations can still apply. This guide sets out the test, the weight and insulation triggers and who building control is.

9 minute read

A new roof covering raises a question that planning permission does not answer. Planning decides whether the work may go ahead without an application. Building Regulations decide whether the finished roof is safe, sound and energy efficient, and they are checked by a separate body.

Below, the Planning Portal's re-roofing test comes first, then weight and fire performance, the insulation figures in Part L and the renovation trigger that can pull a whole roof up to a higher standard. After that, who building control is, and a short list of other duties that arrive with a re-roof. If you are still deciding whether the roof needs replacing at all, start with the signs a repair will not fix.

This page covers England and applies to every address our new roofs team works in around Havant. The rules are national, but the council that checks them depends on the address, so the building control section names the body to ask.

Planning and building regulations are separate tests

Two sets of rules apply to a re-roof, and neither answers the other's question. Planning rules say whether work may go ahead without an application and how far it may change the house. Building Regulations set how the work is done and are checked by building control. Our planning guide for roof work covers the first set; this page covers the second.

On a house, a new covering is an alteration to the roof under Class C of the General Permitted Development Order 2015, and Class C covers re-roofing. A change of covering is therefore normally permitted development. That tells you nothing about Building Regulations, which can still apply to the same job.

Whether they apply turns on four things: the share of the roof that is renewed, what the new covering weighs, how it performs in a fire, and how the insulation changes. Each is taken in turn below, and each can be answered before a scaffold goes up.

Flats sit outside this route. The order defines a dwellinghouse so that blocks of flats, and flats inside them, are excluded, so permitted development for roof work does not reach them and the council should be asked before anything is ordered. Listed homes keep their permitted development rights for roof work, but listed building consent is needed for work "in any manner which would affect its character as a building of special architectural or historic interest". Building control is a further step on top of that.

The Planning Portal's two-part re-roofing test

Under the Planning Portal's guide, no building regulations application is normally needed if both of these hold:

  • less than 25 per cent of the total building envelope is affected, the envelope being "walls, floor, roof, windows, door, roof windows and roof-lights"; and
  • less than 50 per cent of the roof is affected.

Both limbs must be met, and the first is measured against the whole building, so it counts every element of the envelope and not the roof alone. The word to watch is "affected": it measures the area the work touches. A repair that swaps a handful of tiles sits well inside the test. A full strip and re-cover affects all of the roof, which is past the halfway mark, so it falls outside the "no application" route and building control has to be asked how the job should be handled.

The Portal's own page on building regulations for re-roofing sets the test out in full.

The test is national guidance. Arun District Council's building control page includes "replacing roof coverings on pitched and flat roofs" in its list of alterations needing approval, so for Arun addresses the route is checked with that council before the re-roof. For Havant addresses, the route is agreed with your building control body ahead of the start date. Keep a note of the area covered on the quote, so the test can be shown to have been applied.

The test asks two questions at once: how much of the whole building, and how much of the roof.

Heavier coverings and fire performance

Two further triggers sit beside the percentage test, and either one needs approval. The Planning Portal gives them as a new covering material that "increases the weight of the roof covering by 15 per cent or more", and a new covering whose performance "will be significantly different to that of the existing covering in the event of a fire".

Approved Document A states the weight trigger in its own words: a significant change in roof loading is when the loading is increased by more than 15%. Approved Document A says more than 15% where the Portal says 15 per cent or more, so each figure here sits with the source it belongs to. A covering that much heavier needs Building Regulations approval and a structural check.

The Portal's advice on weight is that "you are advised to check with a structural engineer or surveyor before commencing with works". Three practical steps follow:

  • find the weight per square metre of the old covering and the new one on their data sheets;
  • ask what the battens and rafters beneath were designed to carry;
  • ask building control to confirm the route before the order is placed.

We name no material as the heavier one, because the answer depends on the exact products. Our answer on changing to heavier roof tiles goes through the question. Both triggers concern the covering you are about to lay, so the product data sheets are the first place to look. Chimney breasts are a separate point: the Portal says building regulations approval will always apply when removing them, because they are part of the building's structure.

Part L and the renovation trigger

Energy rules arrive with any roof that is substantially renewed. In England, Approved Document L Volume 1, 2021 edition, takes effect for dwellings from 15 June 2022, and until 24 March 2027 it applies to this work. The 2026 edition then takes over for building work that is not higher-risk work, with its tables renumbered 3.2 and 3.3.

Figures are U-values in W/m²K: how much heat passes through a square metre for each degree of difference between inside and out, so a lower figure means a better-insulated roof.

Roof figures in Approved Document L 2021 (W/m²K)
ElementTableFigure
Roof window4.21.4, or Window Energy Rating Band B
Rooflight4.22.2
Existing roof, renovated4.30.35 threshold, 0.16 improved

The renovation trigger is paragraph 11.3. If "More than 50% of the surface of the individual thermal element is renovated", or the work is a major renovation (more than 25% of the surface area of the external building envelope), the whole element should be improved to at least the 0.16 in column (b) of Table 4.3, whose 0.35 threshold column is the test for a retained roof. Paragraph 11.2(d) lists "Replacing the waterproof membrane on a flat roof" as renovation.

Retained roofs are caught too: where an element is kept, for example through a loft or garage conversion, and sits above the 0.35 threshold, AD L says it should be upgraded to the improved figure. Paragraph 4.13 gives the exit. If the improved figure "is not technically or functionally feasible or" "would not achieve a simple payback of 15 years or less", the roof should reach "the lowest U-value that both: a. is technically and functionally feasible and b. can achieve a simple payback not exceeding 15 years."

Who building control is and who to tell

Building control is carried out by the council's building control team or by a registered building control approver. The registration regime for private approvers began on 6 April 2024; private building control existed before then. A national park authority does not do building control, so inside the South Downs the district council remains the body to ask. For Havant addresses, the body is your building control body, which we contact to settle the route before work begins. Elsewhere the answer follows the council for the address.

Portsmouth, Fareham and Gosport addresses use the Building Control Partnership, on 01329 824823. East Hampshire addresses use East Hampshire District Council's building control team, on 01730 234207. Winchester addresses use Winchester City Council building control, on 01962 848 176. Arun addresses use Arun District Council's building control team, on 01903 737756. Chichester addresses use Chichester District Council's building control team.

For Eastleigh, the council says "Building Control is delivered through a partnership arrangement with Southampton City Council." Every other council is simply your building control body, and we ask it which route applies.

Each number belongs to the team named beside it, so use it for the matching addresses only. A useful call covers three things: how much of the roof is being renewed, the weight of the new covering against the old, and the insulation in the roof, since those are the triggers set out above. Ask also what the team wants to see and when it wants notice, as that varies between bodies.

Asbestos, neighbours, scaffold and cost on a re-roof

Four more duties travel with a re-roof, and the cost of the job sits beside them.

  • Asbestos: HSE says that if a building was built or refurbished before 2000, assume asbestos is in it. Cement sheets removed whole without breaking up are non-licensed work. Insulating board is different: HSE counts work on it as licensed where, on the risk assessment, the job "will not be of short duration". Our answer on asbestos found during a re-roof goes further.
  • Party walls: notice comes from the building owner. It is at least two months ahead where the work is to a party wall, for instance cutting away a chimney breast, and at least one month for a new wall on the boundary. A surveyor is needed only if the neighbour dissents or does not reply within 14 days. Our party wall answer has the detail.
  • CDM 2015: a homeowner's client duties pass to the contractor, and every project has a construction phase plan.
  • Scaffold: the highway authority licenses scaffold that stands over a footway or carriageway. We arrange the licence with our scaffolder.

On cost, Which? gave "£7,000-£21,000" for "Replacing entire roof on an average three-bedroom house", excluding VAT, in November 2025, and says prices are likely to be at the upper end in the South East. MyJobQuote gives an average new roof of around £5,250 in the UK. Those figures do not all describe the same roof, and your written quote is one total price after a survey.

Ask about your roof

Questions on the building regulations route

Who do I tell before a re-roof in Havant?

Your building control body is the first call, and we make it to settle the route before work begins. Building control is carried out by the council team or by a registered building control approver. Their questions turn on the area of roof renewed, the weight of the new covering and the change to the insulation.

Is replacing a flat roof membrane a Part L renovation?

Yes. Approved Document L 2021 includes replacing the waterproof membrane on a flat roof in its list of renovation work. Once more than 50% of the roof surface is renovated, or the job is a major renovation, the roof should reach the improved 0.16, not the 0.35 threshold, where that is feasible and pays back within 15 years.

Does the 2026 edition of Part L apply to a roof booked now?

Until 24 March 2027, the 2021 edition applies in England. The 2026 edition takes effect on that date for building work that is not higher-risk work, and its tables are renumbered 3.2 and 3.3. Ask building control which edition covers a job that will start close to the changeover.