023 9396 0313 Get a written quote
A natural slate roof

Planning guide

Do you need planning permission or building regulations for roof work?

A house can normally be re-roofed as permitted development, but a dormer, a listed home, a flat or a heavier covering each raises a separate question. This guide shows how the rules fit together.

9 minute read

Roof work in England meets two different sets of rules, and the two are easy to mix up. Planning rules settle whether an application is needed at all, and how far the work may alter the look of the house. Building Regulations decide how the work must be done, and building control is the body that checks it.

A new covering on an ordinary house is normally permitted development, which means no planning application. Building Regulations can still apply. A dormer is a different question altogether, and so is a listed house, a flat or a home inside a protected area.

Below, the permitted development wording is quoted in full where it matters, followed by the Planning Portal's re-roofing test, the energy figures and the points where the answer turns on your council. It applies to every address our Havant roofing team covers, so you know what to ask before a scaffold goes up.

Two tests, two different bodies

Separate the questions first, because each one has its own rule book and its own decision-maker.

Which rule answers which roof question
QuestionRuleWho answers it
Can the work go ahead without an application?Permitted development, GPDO 2015The local planning authority
Must the finished work meet a technical standard?Building RegulationsBuilding control
Is the house listed?Listed building consent, LBCA 1990The council
Will a scaffold stand on the highway?Scaffold licence, Highways Act 1980 s169The highway authority

A yes to one question never settles another. A roof can need no planning application and still come under Building Regulations, and a roof can need an application for planning while the covering itself is the easy part.

Building control is carried out by the council's building control team or by a registered building control approver. Havant addresses go to your building control body, and we ask it which route applies before work starts. Planning questions go to the district, borough or city council for the address, and in a national park the picture shifts a little, as the chapter on dormers explains. Private businesses that carry out building control work in England must apply to register with the Building Safety Regulator.

The scaffold licence is a third and separate matter. District and borough councils do not issue scaffold licences; the county or city highway authority for the street does, and its fee depends on that authority. We arrange the licence with our scaffolder.

Class C: the right that covers re-roofing

Permitted development is a national grant of planning permission for set kinds of work. Schedule 2 Part 1 of the General Permitted Development Order 2015 (GPDO) deals with houses, and Class C is the class for roofs. Its wording is short: "Any other alteration to the roof of a dwellinghouse." Class C covers re-roofing, so swapping one covering for another on a house falls under permitted development as a rule. England's Class C has no condition that the new materials must match the old ones.

The right has limits. Three of the Class C.1 limits bear on roof work, and each is quoted exactly. Permission does not apply where:

  • C.1(b): "the alteration would protrude more than 0.15 metres beyond the plane of the slope of the original roof when measured from the perpendicular with the external surface of the original roof"
  • C.1(c): "it would result in the highest part of the alteration being higher than the highest part of the original roof"
  • C.1(d): "it would consist of or include (i) the installation, alteration or replacement of a chimney, flue or soil and vent pipe, or (ii) the installation, alteration or replacement of solar photovoltaics or solar thermal equipment"

Class C also carries a condition, C.2: "Development is permitted by Class C subject to the condition that any window located on a roof slope forming a side elevation of the dwellinghouse must be (a) obscure-glazed; and (b) non-opening unless the parts of the window which can be opened are more than 1.7 metres above the floor of the room in which the window is installed."

Read that closely. A side-slope roof window is obscure-glazed in every case. The 1.7 metre figure relaxes only the non-opening part of the condition.

Changing a roof covering and changing a roof's shape are different questions, with different answers.

Class B and protected land: dormers

Class B is the other roof class. It covers "The enlargement of a dwellinghouse consisting of an addition or alteration to its roof", which is how the order describes a dormer. It carries volume allowances of "40 cubic metres in the case of a terrace house" and "50 cubic metres in any other case", and it does not reach a slope that "forms the principal elevation of the dwellinghouse and fronts a highway". Condition B.1(f) removes the class altogether if "the dwellinghouse is on article 2(3) land".

Article 2(3) land, defined in Schedule 1 Part 1 of the same order, includes:

  • a conservation area;
  • an area of outstanding natural beauty, the planning rules' name for what is now called a National Landscape;
  • a National Park;
  • a World Heritage Site.

On that land a dormer needs a planning application. Class C has no article 2(3) exclusion, so ordinary re-roofing stays under the normal rules there too.

In Chichester Harbour National Landscape, which the planning rules still call an area of outstanding natural beauty, the council for the address decides the application and the landscape team advises. In the East Hampshire, Winchester and Chichester parts of the South Downs National Park, the district council usually processes planning applications on the National Park Authority's behalf; in the Arun part the Authority deals with them directly. Building control stays with the district council in every case. Whether a particular street counts as protected land is a question for the council, and Class B is the first class to check on any dormer plan.

The re-roofing test and the energy figures

For re-roofing, the Planning Portal sets a two-part test. The Portal says no building regulations application is normally required when both of these conditions are met:

  • less than 25 per cent of the total building envelope is affected, the envelope being every wall, the floor, the roof, the windows, the door, the roof windows and the roof-lights; and
  • less than 50 per cent of the roof is affected.

Weight and fire performance are separate triggers. A covering heavier than the old one by 15 per cent or more needs approval, as does one that will perform significantly differently in a fire. On weight, the Portal's wording is that "you are advised to check with a structural engineer or surveyor before commencing with works". On Arun addresses, Arun District Council's building control page lists replacing roof coverings on pitched and flat roofs among alteration projects that need approval, so we confirm the route with the council before a re-roof.

Energy rules sit alongside. Until 24 March 2027, Approved Document L 2021 applies in England.

Roof figures in Approved Document L 2021 (W/m²K)
Part of the roofTableFigure
Roof window4.21.4, or Band B on the Window Energy Rating
Rooflight4.22.2
Existing roof, renovated4.30.35 threshold, 0.16 improved

Renovation reaches the improved 0.16 on a major renovation, or where more than 50% of the roof surface is renovated, and where that is feasible and pays back within 15 years. From 24 March 2027, AD L 2026 replaces it for building work other than higher-risk building work, and its tables are renumbered 3.2 and 3.3.

Listed homes, conservation areas and flats

Listed homes keep their permitted development rights for roof work, but listed building consent is needed for anything that affects the building's character. Havant Borough Council puts the risk plainly: "It is a criminal offence to carry out works to a listed building or protected trees without first getting permission from the council, even if you did not know the building was listed or the trees were protected."

Ordinary re-roofing is normally permitted development even in a conservation area, but dormers are not, and an Article 4 direction can remove further rights, so we check with the council first. An Article 4 direction withdraws specified permitted development rights across a defined area. What a direction covers is set by the council that made it:

  • Langstone, in Havant: it covers properties in the conservation area on the elevations facing a public area, and the council's leaflet lists alterations to the roof, chimney and flue work and solar equipment.
  • Homewell, Havant: check with Havant Borough Council.
  • Portsmouth: directions in Old Portsmouth, Castle Road, Campbell Road, Owen's Southsea, Stanley Street, King Street, Highland Terrace, Mile End, Rochester Road, Essex Road and Craneswater and Eastern Parade name chimney stack work and replacing roof cladding on elevations fronting a highway, and the wording varies. They apply to the numbered addresses they name only.

Everywhere else, ask the council whether a direction covers your street. Flats are different again. The order's word dwellinghouse "does not include a building containing one or more flats, or a flat contained within such a building", so a flat has no permitted development rights for roof work. Ask the council before you plan anything.

Where each kind of roof job goes next

The right page depends on the job. Each of these covers the rules for its own kind of work in more detail:

Whichever row your job falls into, the survey comes first: we look at the roof, say what it needs, and give the answer on which rules apply before any price is written. That order stops a plan being drawn around a rule that turns out not to apply.

The party wall side of chimney and roof work is explained in our guide to party wall agreements, the highway side in scaffold licences in Havant and Hampshire, and the protected-area side in roof work in Havant conservation areas.

Both the Planning Portal's re-roofing guidance and the text of Schedule 2 Part 1 are public, so you can check any line above against them.

If you cannot tell which row your job falls into, describe the roof and the work when you ask for a survey, and we will say which rules apply to it. The price after the survey is one written total.

Ask about your roof

Questions on roof permissions

Does a roof window on a side slope need obscure glass?

Yes. Condition C.2 says a window on a roof slope forming a side elevation must be obscure-glazed, and non-opening unless the opening parts are more than 1.7 metres above the floor of the room. That height relaxes only the non-opening requirement, never the obscure glazing. Check the rule for your own house before ordering a window.

Can a listed house be re-roofed without consent?

The permitted development rights stay, but they are not the whole answer: listed building consent is needed as well for any work affecting the building's character. Havant Borough Council warns that works without permission are a criminal offence even where the owner did not know the building was listed, so ask first.

Does a heavier roof covering need approval?

Yes, where it is heavier than the old covering by 15 per cent or more, the Planning Portal says. It adds that "you are advised to check with a structural engineer or surveyor before commencing with works". A covering that performs significantly differently in a fire also needs approval, and your building control body confirms the route.

Where's the water showing?

You'll get one written total price.

10-year workmanship guarantee, in writing

Get a quote Call WhatsApp