
Stacks
Where a chimney rises through the slope and a collar of lead closes the gap around it.
Open pointing or a lifted flashing lets rain run down the wall of the flue.

Chichester is 10.7 road miles east of Havant, and the stacks, flashings, gutters and downpipes there are read from the ladder and the loft, then priced as one written total.
10-year workmanship guarantee, in writing

Where a chimney rises through the slope and a collar of lead closes the gap around it.
Open pointing or a lifted flashing lets rain run down the wall of the flue.

Where a slope meets a taller wall and a strip of lead is cut into the brickwork.
Once an edge lifts, rain tracks behind the metal and down the inside face of the wall.

Where a downpipe hands its water to the ground and a drain takes it away.
A clogged gully backs the water up against the foot of the wall.

A chimney stack is a hole through the slope, closed by lead and mortar.
A chimney stack gives a survey more to read than any other part of the roof. We look at the pots and cowls, at the flaunching, the sloped mortar bed around the base of each pot, and at the pointing down the shaft. Where the stack rises through the slope, lead flashing closes the gap, with a back gutter, a lead channel that carries water round the stack, on the upslope side. Each piece is checked for lifted edges and splits, and a stack that leans or sheds mortar is photographed on the ladder and again in the loft. The wall inside the room that carries the flue is checked for staining too, since that is where a leaking stack shows itself. Our chimney repairs page explains the work, and lead roofing and leadwork covers the metal.
Chichester is a city of listed buildings, and hundreds of National Heritage List entries crowd its centre. The Market Cross, Vicar's Hall and Crypt and the Former Church of St Olave are all Grade I, and the Market Cross is also a scheduled monument. Listed building consent covers work that affects a listed building's character, and works to a scheduled monument are an offence unless authorised. Which consent route a church follows depends on its use, so for the Former Church of St Olave the list entry and Chichester District Council settle it. For a private house the question is simpler: does it have an entry of its own?
Chichester has a designated conservation area. An Article 4 direction can take away rights that a house would otherwise hold, so ask Chichester District Council before any roof work is planned whether one reaches your address. Our planning guide for roof work sets out what the rules allow, and we leave that detail there.
A chimney is a hole through the slope, and the flashing relies on the masonry it is cut into. So we read the stack from three places: the ground, the ladder and the loft, where a damp brick or a stained timber beneath it shows that water travels through the stack. Photographs from each position go with the findings, and a repoint is offered before any rebuild whenever the brickwork is still sound.
A brown stain spreading across the wall of an upstairs bedroom, or damp plaster beside the flue after a wet spell.
Open pointing in the shaft, or a lifted edge of lead where the flashing meets the brickwork.

No roofing rule hangs on it, because the zone describes the ground and not the roof. It does make the last stretch matter more, so we check the downpipes, the gullies and the fall of the ground beside the walls.
Gutters and downpipes are the last working part of a roof, and in a Chichester survey they are read from the first bracket to the gully. We look for runs that have sagged, joints that have let go, hoppers choked with leaves and brackets that have worked loose. Brett Martin advises a fall of 1 mm for every 600 mm towards the outlet, which gives a run a standard to be measured against. Behind it, the timber of the fascia and soffit gets a firm press for soft spots. A hopper is the box at the top of a downpipe that collects the gutter's water; when one overflows, debris or an open joint is the first thing we check. Our gutters, soffits and fascias page sets out the options, from a refixed bracket to a new run.
Land near Chichester is placed in Flood Zone 3 by the Environment Agency's flood map. The zone describes the ground, and no roofing rule hangs on it, though we stay strict about where roof water goes. A downpipe that empties against a wall, or onto a path sloping towards the house, returns the water to the building. So we follow each pipe to its gully and record whether the gully is clear, whether the last length of pipe is intact and which way the ground falls beside the wall.
When the survey is finished you are told whether the roof needs mending or covering again, and why. A mend comes first when the covering and battens are sound. The looking is done on the ladder and inside the loft, never from the pavement. The written quote is one total, states whether VAT and scaffolding are included, and goes with a site left clean. A sound roof with a failed gutter is a gutter job, and it is priced as one.
The roof's work is done only when its water reaches the drain.
The roof's work is not over at the eaves. If a gully is silted, a pipe stops short of it or the ground slopes back towards the house, rain from a sound roof can still end up inside the wall. We write down what is at the foot of every downpipe and photograph it, so that a cleared gully or a short length of pipe is dealt with for what it is.
Map of Chichester and the places around it, with the dashed line of our 30-mile service area from Havant. The same places are listed below the map.
It starts at the top: the pots and cowls, the flaunching around each pot, and the pointing down the shaft. Then it moves to the base, where lead flashing and a back gutter close the gap between stack and slope, and we look for lifted edges, splits and open mortar joints. From the loft we check the brickwork and timbers beneath for damp, because staining there shows that water is travelling through the stack. A repoint or a reflash is offered before any rebuild when the masonry is sound, and photographs show each fault we name, so the report reads as a plain account of what the stack is doing now.
The Planning Portal sets the building regulations test: no application is normally needed when less than 25 per cent of the building envelope and less than 50 per cent of the roof is affected, although a new covering that is 15 per cent or more heavier needs approval, and for a Chichester address we check with Chichester District Council's building control team before work begins. Planning is separate: our roof-work planning guide gives the normal rules for a house. Article 4 is the exception to check, so put your road to Chichester District Council as well, before a date is fixed.
A licence under section 169 of the Highways Act 1980 is needed for scaffolding on or over the highway, and a roof job that needs a scaffold on the street cannot start without one. West Sussex County Council, the highway authority for Chichester, licenses scaffolding at £266 for one month and asks for at least 10 working days' notice before it goes up. We arrange the licence with our scaffolder. That notice period shapes the calendar, so a start week is put to you early and is booked only once it suits you, which keeps the scaffolding up for no longer than the job needs.
A listing belongs to the building its entry names. The Market Cross, Vicar's Hall and Crypt and the Former Church of St Olave are Grade I, and the Market Cross is also a scheduled monument, where works are an offence unless authorised. A house in the same street is a separate question, but it may have an entry of its own, and listed building consent is then needed for work that affects its character. The National Heritage List shows which, and Chichester District Council can answer for your address if the list entry leaves any doubt.
Chichester has a designated conservation area, and an Article 4 direction can remove further rights that a house would otherwise have, so check with Chichester District Council before any roof work is planned. A street name is not enough to go on; only the council can confirm if your address lies under one and what it covers, in writing if you ask. Our planning guide for roof work shows the normal rules, which is the place to start before the council confirms any local limit on your road.
No. The Environment Agency's map puts the land near Chichester in Flood Zone 3, but that zone concerns the ground and tells you nothing about the way a roof is covered, fixed or flashed. It does raise the importance of the drainage at the foot of the walls. So the survey follows each downpipe to its gully and notes whether the gully is clear, whether the outfall discharges away from the house and where the ground falls. Those notes go into the written findings beside the roof itself, for you to act on or pass to whoever looks after the drains.
The Former Church of St Olave is Grade I listed, and its present use decides the consent route: a Church of England church in use goes through the faculty system, while a listed church that is redundant needs listed building consent. For St Olave, the list entry and Chichester District Council settle which applies. For a house the question is simply whether it has its own list entry, and the National Heritage List answers that for your address in a few minutes, before any quote is sought.
Expect one written total, with the findings alongside it in plain words. It follows a survey on the roof itself, never a guess from the pavement, and it also says if VAT and scaffolding are part of the figure. If a repair is sound, it is offered ahead of a replacement, and the reasons for either are written down. When you hold two quotes side by side, check that both cover the same scope before reading the totals. The sum we write down is good and fair. The crew tidies the site before it leaves, and the findings stay with you.
You'll get one written total price.
Fill in what you like. It opens WhatsApp with your message ready to send.