Skylights
Where a window sits in a hole cut through the slope and its frame is sealed to the covering.
A perished seal sends drips onto the reveal and sill inside the room.

Donnington is 11.3 road miles east of Havant; its roof windows, flat extensions and conservatory roofs get a survey before anything else, and then one written total price.
10-year workmanship guarantee, in writing

Where a window sits in a hole cut through the slope and its frame is sealed to the covering.
A perished seal sends drips onto the reveal and sill inside the room.

Where a flat-roofed addition leans against the house and drains to a single outlet.
Water lying there the next morning means a blocked opening or a fall that fell short.

Where a conservatory roof of glass or panels meets the house wall and its own gutter.
A slipped panel or a dry joint lets drips into the room beneath.

A roof window is a small roof of its own, with its own seals.
A roof window is a hole in the slope with a frame sealed into it, so the Donnington survey treats each one as a small roof of its own. We check the flashing kit around the frame, the seals and the cill, and the glazing for misting between the panes. Inside, the plaster of the lining around the opening is looked at for staining, which shows a leak that has been running for some time. A drip at the reveal can come from the window or from water running down the slope above onto the frame, which is why we look higher up before blaming the unit. If a unit does need replacing, AD L 2021 Table 4.2 gives 1.4 W/m²K as one route and WER Band B as the other for a roof window, until 24 March 2027. Our roof windows and skylights page explains the options.
The Parish Church of St George is Grade I listed and in use for Church of England worship, which means roof work there is handled through the faculty system rather than the council's listed building consent. The Old Manor House is Grade II* and The Cottage is Grade II. For a house the test is whether the list names it; where it does, work to the house that affects its character needs listed building consent first, and the list entry will say what it covers.
Donnington has a designated conservation area, and Chichester District Council decides planning there. Ask the council about Article 4 before work is fixed, since a direction can take rights away on a given road and only the council can answer for yours. Chichester District Council's building control team deals with building regulations. Our planning guide for roof work covers the rules themselves.
The glass is not always the culprit. A frame can be sound while water from loose tiles higher up runs onto it faster than its flashing was made to shed. So we trace up the slope before suggesting a new unit, and the finding is written down with photographs, which means a replacement is only ever proposed for a unit that has actually failed, and not for a fault that lies a metre above it.
A damp reveal, or a drip on the sill beneath the window after a long run of wet days.
A perished seal or tired flashing at the frame, or loose tiles above it that throw water onto the unit.

Replacing the waterproof membrane counts as renovation under AD L, and renovating more than half the roof surface means the whole roof is expected to reach Table 4.3 wherever that is feasible, and the point is raised before any quote is written.
Flat-roofed extensions are read for three things: the surface, the edge and the outlet. The surface should drain towards the outlet without leaving pools, the covering should rise at the house wall into a sound upstand, and the opening itself should be clear. The BS 6229:2025 code of practice wants at least 1:80 across a finished membrane roof, so designers draw the roof steeper, and water that lingers means a blocked opening or a fall that fell short. Gutters on an extension are checked the same way as any other, for brackets, joints and the fall towards the pipe. A blister in the covering, or a seam that has opened along the upstand, is photographed and drawn onto a plan of the roof, so that the repair has an address. Our flat roofing page explains the coverings.
Relaying a flat roof has an energy side too. Under AD L 2021, taking off the waterproof membrane and laying a new one is renovation, and once renovation reaches more than 50% of the roof's surface, the whole roof is expected to be improved to Table 4.3 wherever that is feasible. That is a matter for the quote, so insulation is discussed alongside the covering and not after it.
A conservatory roof is a different case again. A ground-level conservatory of up to 30 m² with Part K glazing is exempt from the energy rules only while a wall, door or window still separates it from the house and the home's heating does not reach into it, and a new solid roof has to meet building regulations. So we ask building control first. Our conservatory roofs page covers the options, and every survey ends with a verdict and one written total. Glazed and panel roofs are checked at the gutter edge and the wall flashing, where drips can get in.
A flat roof is judged by where its water lies the next morning.
A flat roof hides its build-up beneath the covering: boards, insulation and the membrane on top. We press the surface for soft boards and, where the ceiling void can be reached, look at the underside, because softness underfoot or a stain below points to water that has been inside the layers for a while. The findings are written out with photographs, so you can see what was pressed and where.
Map of Donnington and the places around it, with the dashed line of our 30-mile service area from Havant. The same places are listed below the map.
A drip at the reveal can come from the window itself or from water running down the slope above it onto the frame faster than the flashing can shed it. So we start higher up, at the tiles, the batten line and any gaps above the unit, and only then turn to the flashing kit, then the seals, then the cill. Glazing that has misted between the panes is a sign the unit itself has failed. You are told which case you have, with photographs, before any new unit is suggested for the opening, and a sound unit stays where it is, with only the tiles above it put right.
The Planning Portal sets out two measures for re-roofing: work touching under 25 per cent of the building envelope and under 50 per cent of the roof ordinarily needs no application. A new covering that is 15 per cent or more heavier does need approval, whatever the area. Chichester District Council's building control team is the one to confirm the route before a date is fixed, and we ask it for you if you prefer. Planning is a separate subject, for which the planning guide on this site gives the usual rules for a house. The two questions are answered by different bodies, so each is put to the right one.
West Sussex County Council licenses scaffolding on the highway at £266 for one month and asks for at least 10 working days' notice, under section 169 of the Highways Act 1980. We arrange the licence with our scaffolder. Because a licence cannot be had overnight, the start week is agreed with you before an application goes in, so the poles are not left waiting on the pavement while the paperwork catches up, and you know the week the crew will be working on the roof, the days it needs the drive and whether the scaffold narrows the path to your door.
A listing covers the building or structure its entry names. The Parish Church of St George is Grade I and in use for Church of England worship, which puts its roof work under the faculty system, not the council's listed building consent. The Old Manor House (Grade II*) and The Cottage (Grade II) are listed in their own right. A house beside any of them is a separate case, decided by whether the list names that house. You can look your address up in the National Heritage List, and Chichester District Council can answer where the wording is unclear.
Not by itself, no. The designation is a prompt to check an Article 4 direction, which can take further rights away, so the advice on any road here is to ask, not assume, and to keep whatever answer comes back. Chichester District Council can tell you for your road, and the answer is best had before a date is booked and before materials are ordered. Our planning guide for roof work lists the usual rules for a house, which makes a phone call to the council shorter and better aimed.
It can. Replacing the waterproof membrane is renovation under AD L 2021. When renovation covers more than 50% of the roof's surface, the whole roof should be brought to the Table 4.3 level so far as that is workable on technical and practical grounds and a payback within 15 years is reachable; otherwise it is upgraded as far as both tests allow. We raise this before any quote, so insulation is priced as part of the one written total, not added afterwards, and you are not surprised by a second figure partway through the job or at the end of it.
Any conservatory given a new solid roof falls under building regulations, so we ask building control before anything is ordered. Separately, a ground-level conservatory of up to 30 m² with Part K glazing is exempt from the energy rules only while a wall, door or window still separates it from the house and the home's heating is not extended into it. Change either of those and the exemption goes. Chichester District Council's building control team can confirm the position for your own conservatory, and we wait for its answer before ordering, since an order placed too early is hard to undo.
Until 24 March 2027, AD L 2021 Table 4.2 sets 1.4 W/m²K or WER Band B for a roof window in an existing house. From that date the 2026 edition of Approved Document L takes over for the building work it covers, so a unit chosen now should be checked against whichever edition applies on the day of fitting. We confirm the figure from the maker's data sheet before ordering, and the written total names the unit and says if VAT and scaffold are in. The price we quote is a fair one.
You'll get one written total price.
Fill in what you like. It opens WhatsApp with your message ready to send.