Why a rate tells you little
A rate per hour or per day answers only part of the question, because the work around the roofing itself changes what the day is worth. What a roof job costs is set by several things at once:
- the size of the crew and the length of the job;
- the covering and materials chosen;
- the access needed, including scaffolding;
- the way waste is taken away;
- any highway licence where scaffolding is set up over a road or pavement.
A day rate also leaves the number of days open. A repair that takes one visit and a re-roof that runs for weeks cannot be compared by a rate, and two roofers quoting the same rate may be describing quite different jobs, and a rate that sounds low can be spread over more days than the job needs. Until the work is finished, you would not know the total.
That is the reason a roof quote should arrive as one written total price after the roofer has been up and looked. It fixes what you pay for the work as described, and it lets you compare two roofers on the same footing. Two quotes built on different assumptions can look equally fair and still describe different jobs.
Published totals for common repairs
Which? gathered these prices from a survey of 11 of its Trusted Traders in November 2025. They include labour and materials, they exclude VAT, and Which? says prices "are likely to be at the upper end of the scale if you live in London or the South East". That covers Hampshire and West Sussex.
| Job | Which? range |
|---|---|
| Replace one to six broken or missing standard roof tiles | £75 to £400 |
| Put in a new ridge tile | £80 to £300 |
| Clear all gutters at front and back | £75 to £350 |
MyJobQuote's repair page puts it this way: "The average roof repair cost is around £650 in 2026." The two guides state different jobs, so both are named here, and neither one is our price. A set job is also easier to price than a whole roof, which is why the Which? list names small tasks.
Each of these is a typical range for a set job, with its source, never a price for your roof.
What to check on a quote
Whatever the roofer calls the price, look for these:
- One figure covering the whole job, in writing, after a survey.
- A statement of whether VAT is included.
- A statement of whether scaffolding is included, with any licence for scaffolding on the highway.
- A description of the work: which slopes, which covering, what is taken away.
- A start window and what is agreed if weather or access moves it.
If a roofer offers only a day rate, ask them for the number of days, the number of people and the total that makes, and ask for it in writing. A roofer who has surveyed can answer straight away. Ask the same questions of every roofer you compare, in the same order, so that the answers sit side by side. One who cannot has not worked out the job yet, and a quote built on that is likely to move. Get the answer written down so that you can compare it with another roofer's.
Our checklist of what a written roofing quote should include goes through each point in more detail.
Where to find more figures
A day rate is not the only number worth putting a source to. The roofing costs page sets out third-party ranges for repairs, new roofs, flat roofs, chimneys and more, with the source and date beside each range, and none of them stands in for a survey.
The post on how roofers price a job explains what pushes a price up or down, and the post on what you should pay for a roof repair looks at repairs in more detail.
Some cost guides quote repair rates per square metre for a small area, up to a stated maximum. A rate like that is for the small area it describes, so it cannot be multiplied across a whole roof to make a total, and nothing on this page is built that way. Rates are useful for checking that a quote sits in the right region, never for building a figure of your own. If a quote looks far above or below a published range, ask the roofer to explain what is different about your roof.
Everything else we do is described on the homepage, and the quote form is open on every page when you are ready for a written total.

