The short answer

One total price in writing, given after the roofer has surveyed the roof, and a plain description of what it covers. It should say whether VAT and scaffolding are included, what happens to the old materials, when work starts and how you pay. A price given over the phone without a survey is a guess, not a quote.

A roofing quote is only useful if it says what the price covers. What to look for, from the total to the scaffold licence and the dates.

A lead valley between two natural slate roof slopes

The total and the survey behind it

The core of a quote is a single figure for the whole job, and it should come once someone has been on the roof to inspect it. A roofer who prices from the pavement, or from a phone photo, has not seen the battens, the underlay, the flashings or the timber beneath them, and cannot know what the job needs.

One total price does a useful thing for you. It gives you a single number to set against another roofer's, and it fixes what you will pay for the work as described. You can then read what each quote covers and compare like with like.

Third-party figures can help you judge whether a total is in the right region. Which? Trusted Traders put replacing the whole roof of an average three-bedroom house at £7,000 to £21,000 excluding VAT (November 2025), likely to be at the upper end in the South East. That is a range for the average house and no more than that, and a survey is what turns it into a figure for your roof.

Treat any number given before the survey as an estimate to be confirmed.

What the quote should say it covers

The total means little unless the quote says what it buys. Look for:

  • The address and the part of the roof the price covers, such as which slopes, flat sections, chimneys and gutters.
  • The covering to be used, and what is removed first.
  • Whether VAT is included, with the rate or amount stated.
  • Whether scaffolding is included, with any highway licence.
  • What happens to the rubbish, and how clean the site is left.
  • A start window, an expected duration and how a delay for weather or access is handled.
  • How and when you pay, and the cancellation terms.

A quote that names its inclusions is easier to hold to than one that gives only a figure. Ask for anything missing to be added before you sign, and keep the signed version somewhere safe, with the survey notes or photographs the roofer sent. Read the small print on cancellation and payment, because that is where a quote and a contract can differ.

If two quotes cover different work, the totals cannot be compared fairly until the scopes match.

Scaffold, permissions and paperwork

Scaffolding erected over a road or pavement is licensed by the highway authority, and the quote should say who is dealing with it. Hampshire County Council lists £211.90 for the first 2 weeks and £72 for each additional 2 week period, and says "Scaffolding companies must apply on behalf of their customers." We arrange it with our scaffolder. West Sussex County Council lists £266 for one month. Fees and units differ by authority, so they cannot be compared directly.

Ask the roofer whether the work needs approval. In Havant, we confirm the building regulations route with your building control body before work starts. For a house, a change of roof covering is normally permitted development, and the guide to planning permission for roof work sets out the rules and the exceptions, such as listed homes and flats.

Ask, too, whether the quote allows for anything found once the roof is open, and how any change would be agreed before it is done. Under CDM 2015, the duties a homeowner holds as client pass to the contractor, so ask who is drawing up the construction phase plan. It is reasonable to ask the roofer who is responsible for it, and to have the answer noted on the quote or in the covering email.

What to do before you accept

Read the quote at your own pace, away from the roof and from anyone waiting for an answer. Put the quotes side by side and compare totals only when each says what it includes: two numbers are not comparable if one includes scaffolding and VAT and the other does not. Ask questions in writing so the answers are on record, and note the date of every reply. If a roofer will not put an answer in writing, treat that as an answer too, and weigh it when you choose.

Check the deposit terms. The answer on paying a roofer upfront explains what a deposit should say, and if you sign after a survey at your address you have 14 days to cancel, a point the answer on cancelling a roofing contract covers in full.

For how a total is arrived at, see the post on how roofers price a job, and for third-party ranges, the roofing costs page.

A written quote after a visit, with a clear account of what the roof needs, is what we aim to give. The quote form sits on every page, and more roofing answers are on the homepage.

Related questions

Should a roofing quote be free?

That is for the roofer to say before the visit, so ask when you book. A written quote should follow the survey either way, and it should be one total price. Whatever is charged for the visit should be stated before it happens, not afterwards.

How long should I have to accept a roofing quote?

The quote should say how long its price holds, so look for a stated period and ask if there is none. Take the time you need to read it and compare it. A roofer who presses you to sign on the spot is giving you a reason to wait.

Where's the water showing?

You'll get one written total price.

10-year workmanship guarantee, in writing