What the membrane sits there to do
A roof is built in layers, and the covering you can see from the road is only the first of them. Beneath it runs the underlay, which sits on the rafters beneath the battens. It is the second line, there for whatever gets past a tile or slate, whether that is wind-blown rain, a slipped tile or snow driven under the laps.
Moisture works in the other direction. Warm air in a house carries water vapour, and some of it rises into the roof space. On reaching a cold surface that vapour can condense into water, which drips or darkens the timber. The type of underlay decides what the vapour can do:
- A breathable, vapour-permeable underlay lets it pass through to the air space under the covering.
- A high-resistance underlay holds it back, so the roof space has to be ventilated in another way.
Neither is wrong as such. They are two routes with different needs, and a roof is built for one of them from the start. From the loft an older underlay can be seen between the rafters, so the survey notes what is there, and any torn or sagging sheet, or daylight at the eaves, is photographed.
Two routes, each with its own ventilation
Marley's guidance for a cold roof, a design in which the loft is kept ventilated above the insulation, shows how the two differ. For a high-resistance underlay, which is not a breathable type, it gives:
- "25mm along the length of the eaves for pitches of 15° or less"
- "10mm along the length of the eaves for pitches of more than 15°"
If an air-permeable sheet is laid above a ceiling that is well sealed, Marley says normal eaves construction supplies 3mm of ventilation, and that is all that is required, so long as the certification conditions are met.
The conditions are part of the figure. A breathable underlay does not remove the need to think about ventilation, and it depends on the ceiling below being well sealed. The figures change at a pitch of 15°, so the actual pitch has to be taken from the roof. Mixing the two routes is how a roof ends up with the wrong ventilation, which is why the quote records the route chosen. They also describe one kind of roof only, so the underlay's own data sheet and the survey decide what applies to yours.
Why moisture is the real question
BS 5250 is the code on moisture in buildings, and BSI lists its 2021 edition as current, under review. Approved Document C of 2013 still cites the 2002 edition in its paragraph 6.10 on condensation, so older guidance may quote an earlier version than the one now current. The underlay is one part of managing moisture, alongside the ceiling, the insulation and the eaves openings, and none of them works well if another is blocked or missing.
Insulation is where the two collide. The Energy Saving Trust says of closed-cell foam: "Its main drawback is that it's not vapour permeable." It also says that "Spraying foam directly to the underside of the roof will partially seal the timber." It adds: "But this risk should be much lower with an open-cell foam." A breathable membrane cannot do its job over timber that has been sealed from below. Our spray foam removal pages explain how that situation is handled.
If you are unsure whether a stain in the loft is moisture from inside or water from outside, our answer on condensation or a roof leak sets out how to tell.
Choosing one, and what the quote should name
The underlay is chosen once the strip has shown what the roof is. Its ventilation, the ceiling below it, the insulation in the loft and the covering going on all feed into the choice, so it is settled at the survey and confirmed against the maker's data sheet.
Ask the written quote to name the underlay and to say which route it follows. After the survey, one price is written for the whole job, and the quote should show whether the total takes in VAT and scaffolding. If the new covering is a different weight from the old one, the approval question comes first, and our answer on new battens and felt covers what sits beside the underlay.
The Planning Portal's re-roofing test asks about the share of the building envelope and the roof affected, and about the weight of the covering. In Havant, we confirm the building regulations route with your building control body before work starts. The full service is under new roofs, and the guide on when a roof needs replacing explains how the survey judges what a roof needs.