Staying put during re-roofing

Can you live in the house while the roof is replaced?

The short answer

Yes, unless the survey finds a reason to say otherwise, such as suspect asbestos, which must be identified and handled before anything else. The work is on the outside of the house, so the household stays in it, with a scaffold at the walls, noise from the strip and some dust in the loft and top rooms. Access, parking and loft contents are the things to settle first.

Staying in is the plan unless the survey finds a reason not to. These are the points to settle before the first day, and what to expect on it.

A pitched roof on a brick house

What the household notices day to day

A re-roof is carried out from the scaffold and the roof, but the house is affected in ordinary ways. You will notice:

  • A scaffold against the walls, which can cover windows and change how you reach the front or back door.
  • Noise from the old covering coming off and from the new one going on, felt most in the rooms under the roof.
  • Dust and small debris in the loft, and sometimes a fine fall into the rooms directly below it.
  • Deliveries of materials and a skip, which need space on the drive or the road.
  • People on the roof and scaffold at working hours, so curtains on upper windows matter.

None of these asks you to leave. They ask you to plan, because a household that has cleared the loft, moved the car and agreed who answers the door loses far less of its day than one that finds out at eight in the morning.

The survey is the time to say who lives in the house and who works from home, since a bedroom for a night worker or a child's room under the roof changes which side the noise falls on.

Safety around the scaffold and the roof

The roof is the one part of the job that nobody in the household should visit. HSE says "all roofs should be treated as fragile until a competent person has confirmed they are not." That applies to your roof as much as anyone's, so nobody stands on it to look, and the survey is done from a safe position set up for the visit. If the house has a loft room or roof windows, the rooms beneath them are where you will notice the work most.

Children and pets are kept clear of the scaffold, the delivery area and the foot of the roof, where tiles, battens or tools could drop. Garden furniture, bins and washing lines near the wall are moved out of the work area before the scaffold goes up.

The client duties of a homeowner under CDM 2015 transfer to the contractor, with the principal contractor taking them where more than one contractor is on the project. A construction phase plan exists for every job, and you can ask the contractor how it deals with a family living in the house.

Where scaffolding obstructs the highway a licence is needed under section 169 of the Highways Act 1980, and we arrange the licence with our scaffolder.

What to do before the first day

These steps keep the house running while the roof is open to the work:

  1. Empty or cover whatever is stored in the loft, and keep a clear route to the hatch.
  2. Move cars from the drive and from the road outside, if deliveries or the scaffold need the space.
  3. Clear shelves, pictures and fragile items on the top floor, where vibration from the strip can be felt.
  4. Tell neighbours when the scaffold goes up and when it is due to come down, because it can overhang a shared boundary.
  5. Ask the quote for a start window, a contact number for the day and a note of how long it should run.
  6. Check what your insurer or landlord needs to know, if anyone else has an interest in the building.

When a chimney breast on a party wall is to be cut away, the building owner serves the party wall notice at least two months before the work starts. How long the work takes is a separate question, set out in our answer on how long a roof replacement takes.

When it makes sense to leave for a while

Some finds change the plan. If the strip turns up suspect asbestos, the suspect material is identified first, before anyone disturbs it, and our answer on asbestos found during a re-roof sets out how HSE sorts the work. Depending on where the material is and what has to be done to it, the household may be asked to keep out of part of the house.

Leaving is a choice and not a rule. Where you stay, the contractor's plan for the site should say where the household keeps clear, which door is used and who to call if something changes on the day. Ask for those details in writing, along with the start window, so that everyone in the house knows them before the scaffold arrives.

The first day can also be affected by the cancellation period. If you sign at home after our survey you have 14 days to cancel, and if you want work to begin sooner, you must ask in writing. The wider service is described under new roofs.

Related questions

Do I have to empty the loft before the roof is stripped?

Anything stored there is better moved or covered, because the strip sends dust and small debris through the loft, and a clear route to the hatch helps. Ask at the survey what the loft holds and what has to go, and whether any part of it can stay.

Can children and pets stay at home while the work goes on?

Yes, with the working area kept clear of them. The scaffold, the delivery area and the foot of the roof are out of bounds, because anything on a roof can fall and HSE treats all roofs as fragile. Pets and young children are best kept to the side of the house away from the work.

Where's the water showing?

You'll get one written total price.

10-year workmanship guarantee, in writing