A new roof is priced from the house and the roof it carries, not from one rate. What moves the figure, with each published range named, dated and limited to what it covers.

9 minute read

Ask three people what a new roof costs and you will hear three very different numbers. None of them need be wrong. Each answers a different question: a small bungalow or a large semi, tiles or slate, a roof that is sound underneath or one that needs timber work, a house with easy access or one where the scaffold has to cross a pavement.

This post walks through what moves the price of a full re-roof in the UK, in the order a survey would raise each point. The ranges come from named third parties, with their dates and their limits, because a range with no context tells you nothing about your own roof.

It carries no HomeDry price, and it never turns a per-square-metre rate into a total, since that sum is how misleading estimates get made. Ours is one written total, and it exists only after the roof has been surveyed. That is the figure to hold against anything you read online, because a written total is something you can compare, query and accept or decline.

The published ranges and what each one covers

Three well-known sources put a number on a whole new roof. They disagree, and the table shows the basis each one states.

Three published figures for replacing a whole roof
SourceFigureBasis
Which? Trusted Traders, November 2025£7,000 to £21,000Average three-bedroom house, excluding VAT
HomeBuilding, September 2025£10,000 to £15,000Three-bedroom semi, 65 m², plain concrete tiles, labour, scaffold and insulation included
MyJobQuoteAround £5,250The average new roof, no VAT basis stated

Which? built its range from a survey of 11 of its Trusted Traders, counting labour and materials and leaving VAT out. It says London and South East addresses are likely to price high within its range, and both counties we work in fall inside the South East. HomeBuilding says the same semi in Welsh slate might reach £18,000, and adds that London and South East labour is dearer.

Treat none of them as a quote for your house. What they show is how wide the spread is, and which questions sit behind it: how big the roof is, what covers it, what has to happen underneath, and what the quote includes. The sections below take each in turn.

One more point about reading ranges. A range is the spread between the lowest and the highest price for what still counts as the same job, and your quote will fall somewhere inside it for reasons that sit on the roof itself. A figure far below the range raises the matter of what has been left out, and a figure far above it asks what has been added.

Size, pitch and how many details the roof has

A surveyor measures the area to be covered first, then judges how awkward that area is. A plain roof with two slopes is quick to work. One with hips, valleys, dormers and several chimney stacks takes longer, because every one of those needs its own cutting, fixing and flashing.

Steepness counts too. A steep pitch is harder to work on safely, and it can call for more scaffold, edge protection and roof ladders. Each covering also has a minimum pitch, so a shallow roof can narrow the choice before price comes into it.

  • The area of each slope, measured on the roof and not estimated from a plan of the house.
  • The hips, valleys and abutments, which are the places where the covering finishes against a wall or a chimney.
  • Dormers, roof windows and any other opening that has to be formed and made weathertight.
  • How many chimney stacks stay, and whether their flashings are kept or renewed.
  • Eaves, verges and ridge, which every roof has but which differ in length and detail.

Which is why two houses with identical bedroom counts can sit far apart in the ranges above. A three-bedroom semi is a label for the house, while the price is set by the roof on top of it. Two roofs that look alike from the road can differ in every item on that list.

Access belongs here too. A roof at the back of a terrace with no side passage is harder to reach than a detached house with a drive, and the extra handling of materials shows up in the labour. Ask the surveyor to note how materials will reach the roof, because that is a question the written price has to answer.

The covering you choose

The covering is the biggest single choice on the job, and it runs on two clocks: what it costs to buy and fit, and how many years it is expected to give. HomeBuilding's approximate lifespans are 100+ years for Welsh slate, 60-80 years for clay tiles and 40-50 years for plain concrete tiles. They are one cost guide's approximations, not promises, and a covering that is badly detailed will not reach them.

It also explains why HomeBuilding's own figures move with the material. Its semi at £10,000 to £15,000 is in plain concrete tiles, and the same house in Welsh slate might reach £18,000.

Weight is the other thing a change of covering can bring. Where the new material would be 15 per cent or more heavier, the Planning Portal says approval is needed. Approved Document A defines the same idea as "A significant change in roof loading is when the loading upon the roof is increased by more than 15%." Neither document says which coverings are the heavier, so the check is made on the actual products, and the roofer should put both weights in writing. Where the new covering matches the old, the question does not arise. Where the type changes, ask for a structural check if the two weights sit close to that line, and file the answer alongside the quote.

Our post on whether a slate roof is worth the money follows one covering in more depth, with its own figures.

What lies under the old covering

A survey sees the outside, the loft side and the edges. It cannot see everything beneath the old covering until that covering comes off, so a good written price says what it has assumed about the battens, the underlay and the timbers below.

If those are sound they stay, and the job runs as priced. If boards or rafters have been damaged by years of water, they have to be repaired, and that work is not in a price that assumed they were fine. Ask the roofer to say, before work starts, how a find like that will be handled and who agrees it.

Asbestos

Asbestos is the other unknown. The HSE advises assuming asbestos is present in any building built or refurbished before 2000. Cement sheets lifted whole, without breaking, are non-licensed work. Work on asbestos insulating board, HSE's example for soffit panels, falls under licensing except for short-duration jobs that the risk assessment supports. Asbestos waste goes in a lockable skip, never an open one, and household asbestos is not covered by the consignment-note exemption.

That is no reason to expect the worst. It is a reason for the quote to say what is included if the covering comes off and something turns up, and for the survey to look at the loft and the soffits before it names a price.

Our answer on asbestos found during a re-roof sets out the steps.

Scaffold, access and who arranges the licence

Every re-roof needs safe access, and that can mean scaffold. No scaffold-hire price is published reliably enough to quote, so a written quote from us includes the scaffold and says so. Council fees are a separate matter, because a licence under section 169 of the Highways Act 1980 is needed for scaffolding standing on the highway.

  • Hampshire County Council charges £211.90 on application for the first 2 weeks and £72 for each additional 2-week period, and it says scaffolding companies must apply on behalf of their customers.
  • West Sussex County Council's fee is £266 for one month.
  • Colas runs Portsmouth's hoarding and scaffolding permit, quoted at £100 plus VAT per month.

The units differ, so the three figures cannot be compared. They are here so that you recognise a licence charge when a quote mentions one. We arrange the licence with our scaffolder.

Two further pieces of paperwork turn up on bigger jobs. Under CDM 2015 a householder's duties as client pass to the contractor, or to the principal contractor if several firms are on site, and a written plan for the construction phase has to exist for every job. On party walls, the owner of the building being altered gives at least two months' notice for work to the wall itself, such as cutting away a chimney breast, and a neighbour can agree in writing to an earlier start.

The scaffold is part of our roof replacement price, so the question for any quote is whether it names it, and whether the licence is arranged for you or left to you.

Rules that change the job, and what a quote says

By the Planning Portal's measure, replacing a roof covering generally needs no building regulations application provided the work affects less than 25 per cent of the building envelope and less than 50 per cent of the roof. For an address in the Arun district the route is confirmed with the council first, because Arun District Council's building control page names replacing roof coverings on pitched and flat roofs as an alteration needing approval.

Energy rules can add work. In England, Approved Document L 2021 expects the whole roof to be improved once more than 50% of its surface is renovated. Its Table 4.3 gives a 0.35 threshold and an improved 0.16 W/(m²·K), which applies unless the improvement cannot be achieved technically or functionally, or would repay itself only after more than 15 years. AD L 2026 takes effect only from 24 March 2027, so until then the 2021 edition governs.

When the quotes arrive, check that each says the same things.

  • A single total price in writing for the whole job.
  • Whether VAT is included, since Which? states its range without it.
  • Whether scaffold is included, and who arranges any licence.
  • The covering identified by make and type, with underlay and fixings.
  • What happens if timbers or asbestos turn up once the covering is off.

Compare like with like, and the odd one out shows itself. If two quotes differ by a large sum, look first for what one of them leaves out. For where re-roofing stands in the rules, see our guide to building regulations for re-roofing, which covers the test and who to tell.

Filed under New roofs

Questions on new roof prices

Does the Which? range for a new roof include VAT?

No. Which? Trusted Traders gave £7,000 to £21,000 for replacing the whole roof of an average three-bedroom house, excluding VAT, in a November 2025 survey of 11 of its traders. MyJobQuote states no VAT basis for its average, so check that any quote says whether VAT is included.

Why do published averages for a whole new roof disagree?

Each prices a different house and scope. Which? covers an average three-bedroom house, labour and materials, excluding VAT. HomeBuilding prices a 65 m² semi in plain concrete tiles with scaffolding and insulation. MyJobQuote gives one national average. None of them is a quote for your own roof.

Does re-roofing need a Building Regulations application?

Not as a rule, under the Planning Portal's test: less than 25 per cent of the building envelope and less than 50 per cent of the roof affected. A new covering 15 per cent or more heavier does need approval. Arun District Council lists roof coverings among projects needing approval, for Arun addresses.

Where's the water showing?

You'll get one written total price.

10-year workmanship guarantee, in writing

Get a quote Call WhatsApp