Before you re-roof

What to know before you re-roof

A re-roof is mostly decided before anyone climbs a ladder. These are the checks worth making first: the survey, the rules, scaffold, neighbours, wildlife and the paperwork.

9 minute read

A re-roof is settled before the first tile comes off: by what was looked at, what was assumed and what was written down. The new covering is the visible part of the job. Around it sit a survey, a few rules, scaffold on or beside the road, a neighbour's wall and sometimes a nest under the eaves.

Think of what follows as a running order, set out as you will meet each item. It covers England only, which is where Havant, Portsmouth, Southampton and West Sussex all fall for planning and Building Regulations purposes, so the rules below are the English ones.

The price of a roof has a post of its own. Here the subject is what to ask, what to expect and which rule belongs to which question, so that when a roofer says a re-roof is straightforward you know what that statement rests on, and what would make it untrue.

The survey comes before the price

A roofer who quotes from the pavement or from a photograph is guessing. A proper survey means a climb to the roof and a look into the loft, and it records what is there before anyone says what the job is.

  • The covering itself: cracked, slipped or missing pieces, and how securely each piece is fixed.
  • The ridge, hips and verges, which are fixed separately from the main slopes.
  • Flashings and the lead around chimneys, abutments and roof windows, where two surfaces meet.
  • The loft side: the underlay, the battens, any daylight where there should be none, and damp or staining on the timbers.
  • Gutters, fascias and soffits at the eaves, which show whether rainwater leaves the roof cleanly.

The purpose of the survey is to decide between repair and replacement, and to give the reason. If a repair would hold, repair comes ahead of replacement. If it would not, the written quote should record what was found and what the new roof will include because of it.

The price you are given is a single sum covering all of the work, and it follows the survey. Ask for it to state what has been assumed about anything hidden until the covering is stripped, so that a find underneath is not a surprise at the end.

Photographs help on both sides. A roofer who shows you pictures of the loft timbers, the battens and the flashings has given you something to compare with the quote, which is more useful than a verbal summary on the doorstep.

Whether you need permission or approval

Two separate systems apply, and they ask different questions. Planning permission is about how a house looks and where it stands. Building Regulations are about how the work is carried out.

On planning, Schedule 2 Part 1 Class C of the General Permitted Development Order 2015 allows "Any other alteration to the roof of a dwellinghouse." Re-roofing a house falls inside that wording, so a new covering is normally permitted development. Three things alter the picture. Flats, and houses divided into flats, sit outside the class altogether. A listed house keeps Classes B and C, yet its owner has to obtain listed building consent as well wherever the work would alter its special interest. And an Article 4 direction can withdraw rights across an area such as a conservation area, so ask the council before you assume anything.

On Building Regulations, the Planning Portal puts the dividing line at 25 per cent of the building envelope and 50 per cent of the roof: below both, an application is not normally needed. It adds that approval is needed when a new covering is 15 per cent or more heavier, or when its fire performance would differ significantly from the old. Arun District Council's own list of alterations needing approval includes replacing roof coverings on pitched and flat roofs, and that applies to Arun addresses.

Our guide to planning permission for roof work sets the planning side out in full. For the Building Regulations test and who to tell, read our guide to building regulations for re-roofing.

Scaffold, the highway licence and parking

The highway authority licenses any scaffold that occupies the pavement or the road, under section 169 of the Highways Act 1980. District and borough councils are not the licensing body. Where the scaffold stands wholly on private land no licence is involved, and Hampshire County Council says a licence is not needed to place scaffolding on private roads.

Each authority sets its own fee and its own period, so the figures below do not compare. Hampshire County Council's fee is £211.90 on application for the first 2 weeks, then £72 for each additional 2-week period, and its page puts the application with the scaffolding company, acting for the customer. West Sussex County Council charges £266 for one month and asks for at least 10 working days' notice. Portsmouth routes its hoarding and scaffolding permit through Colas, where the form shows £100 plus VAT per month, and the permit is separate from any parking suspension. We arrange the licence with our scaffolder.

Parking is a separate question from the licence. Where building materials, a skip or a site compound have to stand on the highway, the Colas page for Portsmouth says a licence or permit is needed as well as a parking suspension. If a skip or a delivery lorry has nowhere to stand except the road, ask the roofer how that will be arranged, and whether any fee is in the price or added to it, before the job is agreed.

Give your neighbours notice of the days the scaffold goes up and comes down. A bay that was free yesterday will not be, and a note through the door costs nothing.

Neighbours, chimneys and party walls

A re-roof does not always touch a neighbour's property. Where it does, the law is the Party Wall etc. Act 1996, and it comes up on a terrace or a semi, where the roof, the chimney stack or the flashing line is shared with or joined to the house next door.

The Act puts the paperwork on the building owner. For work that cuts into a party wall itself, such as removing part of a chimney breast, the notice goes out at least two months ahead. For a fresh wall on the boundary line, or digging beside a neighbour's building, one month is enough. The Act also allows a cut into the neighbouring wall so that a flashing, or similar weather-proofing, can be inserted for a wall built against it.

If the neighbour dissents, or says nothing within 14 days, the law deems a dispute to exist and surveyors are appointed. GOV.UK is plain that you cannot assume silence means agreement. When the job involves a party wall, the neighbour can also agree in writing to an earlier start.

  • Who owns the chimney stack, and does it sit on a shared wall?
  • Does flashing have to be cut into the neighbour's wall?
  • Will scaffold or access need to cross the neighbour's land?

Questions on all of this go to a party wall surveyor, not to building control. It is also worth a conversation over the fence before the scaffold arrives, because it will stand beside their house and the noise carries through a shared wall.

Nests, bats and other things living in the roof

A roof can be somebody's home, and wildlife law does not pause for a building job. Two rules apply here, and they cover different animals.

Wildlife law that can apply to roof work in England
CreatureWhat the law says
Wild birdsA nest that is occupied or under construction is protected: intentionally taking, damaging or destroying it is an offence
BatsDamaging a roost breaks the law with no need to show intent

The bird rule is section 1 of the Wildlife and Countryside Act 1981. The bat rule comes from regulation 43 of the Conservation of Habitats and Species Regulations 2017. The 1981 Act adds that disturbing a bat in its shelter, or blocking its way in, is an offence if done intentionally or recklessly. On GOV.UK, every bat species is fully protected, as are the places where bats breed and rest, and repairing or replacing a roof appears on the page's list of activities that can have an effect.

The law gives no calendar to work by. What counts is the state of the nest, in use or being built, so it is the survey, not the month, that tells you. Ask the roofer what happens if a nest or a bat turns up in the middle of the job, who stops work, and who takes advice before it carries on. A good answer is a plan, and a poor one is that it never happens.

Mention any birds going in and out under the eaves, or bats at dusk, when the surveyor calls, since that history is more use than anything found on the day, and it lets the survey look in the right places.

The contract and what to have in writing

Sign at home after our survey and you have 14 days to cancel. An earlier start needs your request, made in writing. You have no cancellation right for an urgent repair visit that you asked us to make. Those rules come from the Consumer Contracts Regulations 2013, and the Citizens Advice consumer helpline, 0808 223 1133, can explain them if you are unsure.

Before you sign, you want these in writing.

  1. A single sum for all of the work, saying which covering goes on, by make and type.
  2. What the price includes: scaffold, any licence, waste removal and VAT.
  3. How hidden damage, such as rotten timbers or asbestos, will be handled if it turns up.
  4. Which Building Regulations route applies, and who tells building control.
  5. A start date and an estimate of how long the work will take.

CDM 2015 passes a homeowner's client duties along to the contractor who runs the job; with several firms on site they go to the principal contractor. A plan for the construction phase is drawn up in every case, and it is worth asking to see it, because it shows how the site will be run.

If asbestos is a possibility, read our answer on asbestos found during a re-roof, and for how the price is built up, our post on what drives the cost of a new roof. All of it sits within our roof replacement and new roofs work.

Filed under New roofs

Questions before a re-roof

Do I have to tell my neighbours before a re-roof?

Not for every job. A party wall notice is needed for work to a party wall, such as taking out part of a chimney breast, which the building owner must give at least two months ahead. Where no notice is needed, warning the neighbours about the scaffold and the noise is still worth doing.

What if a bird's nest is found under the tiles?

It is an offence to intentionally take, damage or destroy a wild bird's nest while it is in use or being built. Work near the nest should wait. Ask the roofer before the job starts who decides when it is safe to carry on, and keep that answer in writing.

Can I cancel a roofing contract after signing at home?

Yes, within 14 days of signing, if the contract was made at your home after the survey. Work starts sooner only if you ask in writing. There is no right to cancel for an urgent repair visit you requested yourself, so check which kind of visit yours was.

Where's the water showing?

You'll get one written total price.

10-year workmanship guarantee, in writing

Get a quote Call WhatsApp