When listed building consent is needed
Listed building consent is a separate permission from planning permission. The Planning (Listed Buildings and Conservation Areas) Act 1990 deals with it in section 7, which covers alteration or extension of a listed building "in any manner which would affect its character as a building of special architectural or historic interest". Whether replacing a flashing does that is a judgment about the building, so the council makes it, and neither the roofer nor the owner does.
Havant Borough Council states the stakes plainly: "It is a criminal offence to carry out works to a listed building or protected trees without first getting permission from the council, even if you did not know the building was listed or the trees were protected."
That is why the first question on any older house is whether it is listed. The council can tell you, and so can the national list of listed buildings. Read section 7 of the 1990 Act if you want the full text, then ask the council about your own roof.
Permitted development does not replace consent
Permitted development is the set of works that can proceed with no planning application. Class C of the permitted development order, "Any other alteration to the roof of a dwellinghouse", is the class that takes in re-roofing a house. Listed homes keep Classes B and C, because neither class excludes a listed building. That removes the need for planning permission for the work, not for listed building consent.
Conservation areas follow a different rule. Ordinary re-roofing is normally permitted development even there, but dormers are not, and an Article 4 direction can take away further rights. Two published examples show how local they are:
- In Langstone Conservation Area, Havant Borough Council's direction covers elevations facing a public space, and the council's leaflet lists "Alteration to the roof of the house." and "Any chimney, flue and/or waste pipe work."
- Portsmouth City Council's directions for Old Portsmouth and for Castle Road, Southsea, list "The removal / alteration of chimney stacks" and "The replacement of the roof cladding on the main elevation fronting a highway".
Other councils' directions are not covered here, so check with yours. Whether your street falls under any direction is a question for your own council.
Like for like, or a change of detail
Putting new lead where old lead has failed is one conversation. Changing the material, the detail or the look of a joint is another. A zinc or lead-free flashing in place of lead, a different position for a step, a dormer cheek rebuilt in new form, and a patch that makes the roofline look different from the street are all questions to put to the council before work is priced, not after.
Whether like-for-like replacement of lead counts as affecting the building's character is for the council to say, and it may answer differently for different buildings. We do not give that answer for it. What we do is describe the work in plain terms, photograph the roof as it stands, and explain the changes planned and what the finished joint will look like, so that you can put the question to the council precisely.
On a listed roof the lead can be part of what is listed, and the sheet that is there now may be old. A written confirmation from the council of what has been agreed belongs in your file with the quote. It is also worth asking the council what it wants to see with the question: photographs, a note of the materials and a sketch of any detail that will change are the usual things.
Churches, chapels and what to do next
Churches do not all take the same route. A Church of England church in use is dealt with under the faculty system and not through listed building consent, whereas a listed Unitarian or Quaker church, or a redundant one, does need listed building consent. A cathedral of the Church of England has its own system, the Care of Cathedrals Measure.
For a house, the sequence is short:
- Find out whether the building is listed, and whether it lies in a conservation area with an Article 4 direction.
- Ask us for a survey, and a description of the lead work needed and the photographs.
- Write to the council asking whether consent applies, and attach the survey and photographs.
- Settle the work and the materials with the council first, and only then order the lead.
Our page on lead flashing repairs describes the work itself, the guide to planning permission for roof work covers the wider rules, and the lead roofing page lists the other leadwork we do.
Consent is a council process with its own timing, so allow for it. If rain is coming in while you wait, a roofer can fit a temporary cover over the joint, and the council can say whether that stopgap needs anything from it. Raise it in the same letter.