A bay window and a porch both stand out from the main wall, and each has a small roof of its own. The roof is small, and the lead on it is a few metres of covering, but it has more edges than its size suggests: the front, two sides and the junction with the house wall behind.
That junction is the line where most attention goes. It is where the little roof meets a vertical wall, so the lead has to run up the wall and be held in place, and the covering below has to carry water away from it. The sides and the front are where the lead finishes and water leaves the roof.
This guide takes the job from survey to finished roof: what the details are, how lead codes are matched to them, which standards do and do not apply, when a consent or a neighbour's agreement comes into it, and what a written price should name. It sits under our lead roofing page, and the rules in it come from published sources, named where they are quoted.
The details that make up a bay or porch roof
A lead bay or porch roof is built from a small set of details, and naming them makes a quote easier to read. Each is a place where the covering has to be shaped, fixed and finished.
- The covering over the top of the bay or porch, which has to carry water to its edge or outlet.
- The flashing along the wall at the back, where the roof meets the main house.
- The two sides, where the covering finishes against a window frame, a corner or a neighbouring wall.
- The front edge, where water leaves the roof and enters a gutter or drips clear.
- Any corner or angle where two faces of a bay meet.
A bay with a canted shape has more of these than a square porch, because every angle in the plan is an angle in the lead. A porch against a gable wall has a different set from a porch under a window. That is why a survey records each detail rather than treating the roof as a single surface.
Royston Lead's brochure matches lead codes to named details, and a bay or porch roof draws on flashings and soakers more than on the other details it lists. The survey decides which apply, and the table in the third section shows how the codes line up. A canted bay or a porch with a return wall can need several, each with its own length and its own fixing.
The aim at the survey is to see each edge close up, and to see what is under the old lead, since the deck and the timber beneath decide whether the covering can simply be replaced.
What a survey looks at, inside and out
A survey of a bay or porch lead roof looks at the roof from the ground, from a ladder or scaffold, and from inside the room below. The reason for looking inside is that a stain on the ceiling or the reveal tells you where water has been reaching, and the stain is not always under the failure.
The checks we make:
- The condition of the lead at the back wall, and whether it is tucked into the wall or held by a surface fixing.
- The state of the sides and the front edge, including any lifted or torn lead.
- Any sign of water reaching the timber below, such as a dark patch or a soft board.
- The gutter or outlet at the front, and whether water leaves the roof freely.
- The wall above the junction, because a defect there can be sending water down on to the lead.
It is worth knowing what the roof is made of before it is priced. Lead sheet is only one of several coverings a small flat roof can carry, and an older bay roof may have been patched in another material at some point. Photographs of the details from the ground, and a note of any stain inside, are the best first message to a roofer.
Our answer on what lead code to use for flashing and our cost guide both start from the details the survey records. The survey is where the job is defined, and the one total in writing comes from it.
Which lead codes suit which detail
Lead sheet is specified by code. Moving up the codes means thicker, heavier sheet, and the brochure sets each code against the details it suits. The table below gives the codes and the use letters from the Royston Lead brochure for the details a bay or porch can involve.
| Detail | Royston key | Codes listed |
|---|---|---|
| Soakers | A | 3 and 4 |
| Flashings | B | 4, 5 and 6 |
| Pitched valley gutters | C | 4 to 8 |
| Parapet, box and tapered valley gutters | D | 5 to 8 |
| Dormers | E | 4 to 8 |
Code 3 is recommended for soakers only, so it does not appear against flashings. The thicknesses run from 1.32mm for Code 3 to 3.55mm for Code 8, and the weights from 14.97kg/m² to 40.26kg/m².
The brochure's matrix says which codes are listed for which use, and it does not choose between them for your roof. That choice belongs to the specification drawn up for the job, which weighs the detail, the exposure and how long each piece of lead runs. A bay roof built from several details can carry more than one code, so the quote should name the code detail by detail.
A quote that says only that lead will be used has not told you what you are buying. The code is the line between a thin sheet that suits a soaker and a heavy sheet that suits a box gutter, and each is a different quantity of metal.
Standards that do and do not apply to lead
Standards are often quoted in roofing, and the first question to ask is what a standard covers. BS 6229:2025 deals with flat roofs whose waterproofing is a flexible membrane laid over continuous support. Lead sheet roofs fall outside that scope.
That matters for a bay or porch, because a lead roof with a low pitch looks like a flat roof. The minimum finished fall of 1:80, which NFRC reports from BS 6229:2025, belongs to membrane coverings and not to lead sheet. A roofer who cites it for a lead bay roof is borrowing a figure from a different material.
What does apply is the job's own specification:
- The specification for the job, which decides the code, the piece lengths and the fixings.
- The Building Regulations where the work triggers them, covered in the next section.
On a small lead roof, the survey looks at the whole build-up: the covering, the deck beneath it and the room below, so that any moisture has a way out and nothing is sealed in.
Ask the roofer which standard or specification the quote follows, and what it says about falls and drainage for lead. A reply that points to the specification is a reply you can check. A reply that points to a membrane standard is a reason to ask again.
None of this makes a lead roof a lesser roof. It means the rules that govern it are different from the rules that govern a felt, EPDM or GRP roof, and a quote should reflect that.
A low-pitched lead roof can look like a flat roof, but the flat roof standard for membranes does not cover lead sheet.
Consents: building regulations, listed homes and party walls
Re-covering a bay or porch roof raises the same questions as any re-roofing. The Planning Portal gives two limits for a re-roof without an application: less than 25 per cent of the building envelope and less than 50 per cent of the roof. Separately, a covering 15 per cent or more heavier calls for approval. Your building control body is where we agree which applies, before work starts.
A listed home keeps its permitted development rights for roof work, but listed building consent is needed for anything that affects the building's character. Check with the council before starting if the house is listed. Ordinary re-roofing is normally permitted development even in a conservation area, but an Article 4 direction may take away more, which is why the council gets the question first.
Where the porch or bay stands against a neighbour's wall, our answer on party walls and lead flashing sets out the steps, and section 2 of the Party Wall etc. Act 1996 allows the building owner to cut into the neighbour's building to insert a flashing. That right is exercised by notice: the building owner serves it, and a neighbour who does not indicate consent within 14 days is deemed to dissent, which means a dispute and a surveyor.
A party structure notice has to be served at least two months before work starts, and a neighbour can consent in writing to an earlier start, which covers section 2 rights. Raise it at the survey, so the dates are known before a start is promised.
Lifespan, and what to put in writing
The published lifespan wording is hedged, and the hedge belongs to the claim. MyJobQuote says lead flashing that is correctly installed can last for over 80 years. HomeBuilding puts a lead flat roof at 60-100 years, while Less says lead lasts 50 to 100 years. None of this is a promise about a bay roof, and the figures describe different things.
What shortens any lead roof is a matter for the survey, not for a figure. A flashing that has pulled out, a covering that has been punctured or a front edge that no longer sheds water is a fault to find and close. Our guide to how much leadwork costs sets out the third-party price figures with their units.
A good written quote for a lead bay or porch roof names:
- The details to be done: back flashing, sides, front edge and any corners.
- The lead code for each detail.
- The state of the deck and what is to be done if it is soft.
- The party wall position, if a neighbour's wall is involved.
- VAT and scaffold, stated plainly and not left to assumption.
The total in writing follows from what the survey found, so the list above is the list to check before you agree it. If a detail turns out different once the old lead is off, the change is discussed with you before the work goes on.