Party wall notices

Does a chimney breast on a party wall need a party wall notice?

The short answer

Yes, when the breast forms part of the shared wall and you intend to cut it away. The Party Wall etc. Act 1996 gives the building owner that right, but the notice must go out with at least two months in hand before cutting starts. The owner serves it, not the roofer. A surveyor comes in only if the neighbour dissents or does not reply within 14 days.

A breast in the wall between two houses brings the Party Wall etc. Act 1996 into play. Who serves the notice and when.

Cracked mortar flaunching around the pots on a brick chimney

When a breast comes under the Act

A terraced or semi-detached home can have a chimney breast built into the wall it shares with next door. Where that is the case, cutting the breast away is work to a party wall. Section 2(2)(g) of the Act gives the building owner the right "to cut away from a party wall, party fence wall, external wall or boundary wall any footing or any projecting chimney breast, jamb or flue".

The right is conditional, and the condition is the notice. The owner may use it once the correct notice has been served, and the Act sets out how and when. Whether your breast sits on a party wall depends on how the house was built, so the deeds, a look at the wall from both rooms and the survey all help.

On a detached house, a breast in an outside wall with no neighbour's wall involved has nobody to serve. Settle whose wall it is before anything else. Questions about the Act itself are for a party wall surveyor, and building control is not the place to take them.

Who serves the notice and how far ahead

The building owner serves the notice. That is the person who intends the work, which for a chimney breast means the owner of the house. A roofer can explain what the job involves, but the duty to serve rests with you.

The periods depend on the kind of work, and they are not the same for every job:

  • A party structure notice, which is what cutting away a chimney breast needs, comes under section 3(2)(a), and at least two months must pass between service and the planned start.
  • A notice for a new wall built along the junction line is at least one month ahead (section 1(2)).
  • A notice for digging near a neighbouring building is at least one month ahead (section 6(5)).

A breast falls in the first group, so two months is the figure to plan around, along with the 14 days the neighbour then has to respond. Do not use the one-month figure just because another job in the Act uses it. The text of section 3 sets the rule, and those weeks have to be built into the start date.

Consent, dissent and silence from next door

Your neighbour has 14 days from service. Section 5 says that an owner who does not respond in that time is treated as having refused. The statutory words are "does not serve a notice indicating his consent to it within the period of fourteen days beginning with the day on which the party structure notice or counter notice was served, he shall be deemed to have dissented from the notice and a dispute shall be deemed to have arisen".

GOV.UK puts it plainly: "You cannot assume that no response means they agree to the works." It also says: "You must appoint a surveyor if you and your neighbour cannot agree." Under section 10, the two owners can appoint one agreed surveyor, or each appoint their own.

A neighbour who is content can speed things up. Section 3(3)(a) allows a building owner to proceed "with the consent in writing of the adjoining owners and of the adjoining occupiers" for any right under section 2, which includes cutting away a breast. Ask for that agreement in writing, and keep a dated copy of everything you send and receive.

The GOV.UK party wall guide sets out the steps in plain terms.

Keeping notice and approval apart

The party wall notice and Building Regulations approval run on two separate tracks, and neither replaces the other. The notice goes to your neighbour. Approval goes to your building control body, because the Planning Portal says it "will always apply when removing chimney breasts as they are part of the building's structure".

That gives you two lead times to plan around: the weeks of notice and the wait for approval. A start date is realistic only once both are in hand. Our answer on chimney breast removal and building regulations deals with approval, and our answer on a leaning chimney stack covers a stack that cannot wait.

We survey the breast and the stack first, say what the job will involve and which parts of the house it reaches, and then give you one written total. Our chimney repairs page links the rest of our answers. If you are unsure whether the Act applies, ask a party wall surveyor before any notice goes out, because the period of at least two months runs from service, so a redone notice moves the scaffold date. Keep copies of the deeds and any plans you have, as they show who owns which part of the wall, and bring them to the survey.

Related questions

Does a neighbour's silence mean they agree to the work?

No. After 14 days with no notice of consent, the neighbour counts as having refused, and the Act treats that as a dispute. GOV.UK says you cannot assume that no response means they agree, so surveyors are then appointed under the Act to settle the matter.

Do I serve the notice or does my roofer?

The building owner serves it. A roofer can describe the work and its timing, but the legal duty sits with you as the owner of the house, so raise it at the survey and allow at least two months ahead of any cutting to the breast.

Where's the water showing?

You'll get one written total price.

10-year workmanship guarantee, in writing

Get a quote Call WhatsApp