
Gables
The triangle of wall at the end of a pitched roof, topped by an edge of tiles.
Wind leans on that edge from the side, so its bedding and fixings are read along their whole length, tile after tile.

East Wittering is 17.1 road miles south-east of Havant. Gable edges, flashings and roof windows near the shore are surveyed before any quote is written.
10-year workmanship guarantee, in writing

The triangle of wall at the end of a pitched roof, topped by an edge of tiles.
Wind leans on that edge from the side, so its bedding and fixings are read along their whole length, tile after tile.

Lead and metal strips set where a roof slope runs up to a wall or chimney.
Rain gets behind one that has curled away, and the stain appears lower down the wall.

The timber or metal surround of a roof window, sunk into an opening in the slope.
Seals at the frame perish, and glass that mists on the inside has lost a seal of its own.

The verge is the one edge of the covering with no neighbouring row to hold it, and the wind reaches it from the side. Its mortar bed does the holding, so when that bed cracks the tile starts to rock.
The side edge of a pitched roof, the verge, takes wind pushing sideways, so the last tiles at a gable end must be bedded and fixed with care or they lift. We go along each verge tile by tile, asking whether it sits flat, whether the mortar beneath is solid, and whether the barge board below has stained. Where a tile is lifted for a closer look, the batten under it is checked for rot before the tile goes back. Underneath, the soffit and the top of the wall get the same attention, since a leaking verge shows up as marks there. Cupa, a slate maker, says coastal areas are given a higher grade of exposure, which is why a roof re-covered in East Wittering gets a fixing specification calculated for the site under BS 5534. Dry-fixed verge trims are one alternative to mortar, and our dry ridge and verge page describes them.
East Wittering Windmill is listed Grade II (list entry 1026108). Roof work that would change its character needs listed building consent, and a private house that carries a listing of its own follows the same route. An entry is worth reading in full, because it names what is protected and what is not. A listing next door puts no restriction on yours; what counts is whether the listing names your own house.
Conservation areas around East Wittering include West Wittering, Earnley and Somerley, and Chichester District Council can answer for your road. Keep any reply with the house papers. Article 4 directions can strip away further rights, so check with Chichester District Council before you settle on a covering. The planning guide for roof work explains the rules, and we keep them out of this page so they are not stated twice.
At a gable end, the weather arrives sideways and the tiles have nothing behind them.
A mortar-bedded verge relies on a bed of cement that can crack and fall away, and the tiles then rock in their seats. A dry-fixed verge replaces much of that mortar with clips or trims screwed to the roof, which suits a site with higher exposure. Neither is right for every house. We look at what is on yours, tell you what we found, and put the reasoning in writing.

A strip of metal, tucked in well, does the work of a wall.
Wherever a slope climbs to meet a wall, a chimney or a window frame, a strip of lead or other metal has to bridge the gap. We check where its upper edge is held, whether the metal has split where it was bent, and whether the mortar above it has crumbled. A lifted flashing is mended by dressing a new length into a fresh cut in the joint, not by smearing sealant along the old line. A flashing that has curled away lets rain in behind, and the stain turns up lower down the wall, sometimes a long way from the cause. Our leadwork page describes how the metal is cut and dressed.
Roof windows add their own seal. We check the flashings around the frame, then the rubber seals and the cill, and the glass for misting that signals a failed unit. A drip inside is sometimes the window and sometimes water running down the slope from a slipped tile above, so the check starts higher up. Where the frame is sound, a new seal or flashing kit can be all that is needed. The roof windows and skylights page covers replacement.
Some paperwork is worth knowing. On the Planning Portal's figures, a re-roof touching under 25 per cent of the building envelope and under 50 per cent of the roof usually sits below the line for a building regulations application, while a new covering 15 per cent or more heavier sits above it. For scaffolding on the highway, West Sussex County Council charges £266 for one month and wants at least 10 working days' notice. Rather than leave that to you, we arrange the licence with our scaffolder and fix the date with you. The Environment Agency's flood data puts land near East Wittering in Flood Zone 3, which concerns the ground nearby and not the roof.
A damp ring round a roof window gets blamed on the window, yet the cause is sometimes a few slipped tiles higher up that send extra water onto the frame. We trace upward before suggesting a new unit, so you are not paying for glass when the fault is in the slope. Photographs of the frame and the slope above come with the findings, and the tiles higher up are put right before anything is ordered.
A stain on the wall below a chimney or beside a window frame, or a drip that appears only after a long wet spell.
A flashing edge that has lifted from its chase, or a seal that has perished, so water slips behind the metal and travels down.
Map of East Wittering and the places around it, with the dashed line of our 30-mile service area from Havant. The same places are listed below the map.
We go along the verge tile by tile. Each should sit flat on its bed, the mortar under it should be solid, and the barge board below should be dry and firm. A tile that rocks under a gloved hand has lost its bedding. Because Cupa says the coast means a higher grade of exposure, we also look at how the edge is fixed and whether that fits what BS 5534 would call for here. What we find is written up with photographs, and a sound verge is left as it stands, so you pay only for what the roof needs.
East Wittering Windmill is listed Grade II, and listed building consent is required wherever the work would alter what the listing protects. A house that carries a listing itself follows the same route, while a neighbour's listing places nothing on your roof. Look your address up on Historic England's list, read the entry, and ask Chichester District Council before a price is agreed, because the wrong covering on a listed building can mean taking it off again. We build the survey and the programme around the answer, and nothing starts before it comes.
West Wittering, Earnley and Somerley are the ones around the village. A given road may be inside one or outside all three, and Chichester District Council can answer for your postcode. Article 4 directions can take rights away, so check with Chichester District Council before assuming your roof falls under the ordinary rules, and before a covering is ordered. The planning guide for roof work covers the national position, and we follow it when advising on an address. Ask the council in writing if you want the answer on file.
It can be. Under the Planning Portal's test, a re-roof that affects less than 25 per cent of the building envelope and less than 50 per cent of the roof falls below the line for a building regulations application. A covering 15 per cent or more heavier is different, and needs approval whatever the area, since the structure must be able to carry it. We place your roof against both limits and confirm the route with Chichester District Council's building control team before work starts, then give you the reply in writing, so a surveyor, a buyer or a lender can see it later if they ask.
A licence under section 169 of the Highways Act 1980 stands between a scaffold and the pavement it occupies. In East Wittering that licence is issued by West Sussex County Council, which lists £266 for one month and asks for at least 10 working days' notice. For our part, we arrange the licence with our scaffolder, and you choose the start day with us before anything is booked, so poles go up when the street and the weather suit. The cost is part of the single written price and is never added once the scaffold is standing, and the licence period is chosen to fit the length of the job.
No. The Environment Agency's flood data shows Flood Zone 3 land near East Wittering, which is a statement about the ground around the village and not about any one roof. A cracked tile, a lifted flashing or a blocked gutter is repaired the same way in any zone, with the same materials and the same care. If flood risk matters to you for insurance or a sale, ask your insurer or solicitor what it means for your plot, because the answer turns on your policy and not on the roof. We stay with the roof and record what we see with photographs, so the evidence is yours to keep.
From the slope above, down. We check for slipped or cracked tiles that send extra water onto the frame, then the flashings, the seals and the cill, and finally the glazing for misting. A unit that has failed internally is replaced, while one with only a perished seal or a lifted flashing is mended, which costs less and keeps the existing frame. You are told which case you have, with photographs of the frame and the slope above it, before any price is written, so the advice can be checked by you or by anyone you choose to ask for a second opinion.
One total price, given after a survey, with what we found printed next to it in ordinary words. It names the job and the covering, shows whether VAT and scaffold fall inside what you pay, and comes only once the roof has been climbed and seen. Where a repair would hold, it goes ahead of any replacement, and the reasons for a replacement are written down so they can be checked. We keep prices fair. Comparing quotes, ask each firm what its figure leaves out, and get the reply on paper, so the totals can be set side by side.
You'll get one written total price.
Fill in what you like. It opens WhatsApp with your message ready to send.