What the Planning Portal and AD L say
The Planning Portal says: "Many homeowners choose to replace their traditional polycarbonate conservatory roof with a solid tiled roof for better thermal efficiency." It adds a duty: "A new roof must comply with building regulations to ensure it is structurally safe, energy efficient and properly ventilated."
For a new roof element in an existing dwelling, AD L 2021 Table 4.2 sets a limiting U-value of 0.15 W/(m²·K), where a lower U-value means less heat lost through the roof. That table is written for dwellings, and what applies to a particular conservatory roof is for building control to say.
The energy exemption answer explains why a small conservatory is treated differently from the house it is attached to, and when that difference stops applying.
The Portal's first sentence states a purpose and gives no measurement. Nothing in either source says how much warmer a particular room becomes, which is why this page offers no percentage and no number of degrees.
Reading a U-value claim
A U-value is calculated for the whole build-up of a roof and not for one layer. A claim about warmth that names no U-value, or names one without saying how it was reached, tells you very little, so ask for the figure and for the build-up behind it.
What else changes how the room feels
A conservatory has walls, glazing and a door as well as a roof, and a solid roof leaves all of those as they were. The room can therefore still lose heat elsewhere. Each of these counts towards how warm it feels:
- How the new roof is built up, and how much insulation it carries.
- The glazing in the walls, which a new roof does not change.
- The wall, door or window between the conservatory and the house.
- Whether and how the room is heated, which the heating answer covers.
This is why a single figure for every roof would mislead, and why a look at your own room is the sensible basis for a decision. A roofer who quotes a percentage without seeing the room is guessing, and the guess could be wrong in either direction.
Ask what the roofer expects to change and what is expected to stay the same. A clear answer names the glazing and the door as well as the roof.
If the room is meant for winter use as an extension of the house, say so at the survey. A roofer who knows the intended use can discuss the glazing, the door and the heating alongside the roof, and can say which change would help you.
Weight, ventilation and condensation
A solid covering puts a heavier load on the frame, so a structural check comes before any tiles are ordered. A frame that cannot carry the load is a reason to choose a lighter build, not to skip the check. The frame and the covering are chosen together, and the choice is written down with the price.
A warmer, tighter room also holds its moisture, and the roof has to be ventilated. The Portal's wording lists "properly ventilated" right beside "energy efficient". The condensation answer explains where the moisture goes and what a survey checks.
Warmth gained and moisture managed are two halves of the same detail, and a proposal that deals with only one of them is incomplete. Ask any roofer who promises a warmer room how the ceiling will be ventilated, and how that detail will be shown to building control before the work begins.
The order of work follows from this. The frame is confirmed first, the build-up is agreed with building control second and the covering is ordered last, so that nothing arrives on site that the frame or the regulations then rule out.
Comparing options at a survey
Ask each roofer to write down the same things, so the options can be compared like for like:
- The build-up of the proposed roof, layer by layer, including its insulation.
- How it joins the house wall, the gutter and the frame.
- How ventilation and condensation are dealt with.
- How building control is handled.
The price that follows is one written total. Our conservatory roofs survey records the room as it stands, so the proposal rests on the roof and frame that are really there and not on a standard answer.
You then have a build-up to put beside any other quote, and a clear set of questions to ask if the two differ. That is a far better basis for choosing than a number of degrees or a percentage, neither of which any source we have read publishes for a room like yours.
Keep the written build-up once the work is done. If you sell the house, a buyer's surveyor may ask what the conservatory roof is made of and how it was approved, and a clear record answers both questions without a search.

