Access on site

What access does a commercial roofer need on site?

The short answer

A commercial roofer needs a safe route onto the roof, firm and level ground for access equipment, space for materials and a skip, and an honest account of what is fragile. HSE's line is "all roofs should be treated as fragile until a competent person has confirmed they are not", so the access plan starts from there, and the survey fills in the detail for your building.

A commercial roofer needs a safe way onto the roof, space on the ground for equipment and materials, and a clear account of anything fragile.

Corroded fasteners and rust on old profiled metal roof sheets

Getting onto the roof safely

The route to the roof is the first thing the survey establishes, and it sets what can be carried up and how. On a commercial building it may be an internal stair and a roof hatch, a fixed ladder on the outside, a neighbour's yard or a scaffold built for the job. Each has its own limits on what can be carried up and by whom.

For the survey and for the work, tell us in advance about:

  • any roof hatch, its size and where it opens
  • fixed ladders, walkways or edge protection that already exist
  • how high the roof is above the yard or street
  • any gate, key or alarm code needed to reach the yard
  • whether other trades or tenants use the same access

Under Highways Act 1980 s169, scaffolding that obstructs the pavement or road needs the highway authority's licence, and we arrange the licence with our scaffolder. Scaffold is part of the access plan, and the quote should say whether it is included. Ask also whether a hoist or a crane is needed for heavy sheets, because that changes the space the lorry and the crew need.

Fragile surfaces and rooflights

A fragile surface is a serious hazard on a commercial roof, and HSE treats it that way. Its starting rule is the one quoted above. On older units, HSE's guidance A14 states "AC roofs are always fragile", and its roof guidance says "Fragile rooflights are a particular hazard."

That shapes the access plan in three ways, each of which is written into the method for the job:

  • nobody steps onto sheets or rooflights that have not been judged able to carry weight
  • crew boards or covers are set out along the working line, so weight is spread on supports
  • rooflights, old or new, are marked and guarded so that they cannot be stepped onto by accident

Please tell us about any rooflight you know is old, painted over or cracked, and about any earlier fall or near miss on the roof. Anything that has been painted over, or fitted by an earlier contractor and never tested, is treated with suspicion until it has been checked. Our page on fragile roofs and rooflights on units goes into this in detail.

Space for materials, skips and vehicles

The ground matters as much as the roof, because a delay at the gate becomes a delay on the roof. A commercial re-cover needs a delivery of sheets, insulation or membrane rolls, somewhere to put them where they are out of the weather and out of everyone's way, and a place for the skip that takes the old covering.

Plan for the following before the start date, and tell us if any of them is a problem on your site:

  1. a delivery point that a lorry can reach, with room to unload
  2. a dry storage area, away from doors and fire routes
  3. a position for the skip, level and clear of overhead lines and entrances
  4. parking for the crew, so that customers and staff keep theirs

If the old roof is asbestos cement, the skip has to be a lockable one, and HSE's EM9 guidance puts it in these words: "Use a lockable skip for asbestos". A heap of sheets under a tarpaulin is not an alternative. Our page on asbestos cement on an industrial roof covers the removal side.

A working building and the rest of the site

If the building stays open, the access plan has to share the site with your own people, and the two plans are written together. Routes for staff, customers and deliveries are kept apart from the work area, and the ground below any part of the roof being worked on is kept clear. Our page on roof work in an occupied building explains how that is arranged.

Mention anything that limits when or how the site can be used, such as hours of business, noise limits, deliveries of your own, or security rules for the yard. The plan is written to fit those, and you see it before work starts, and it is much easier to do that at the start than to change it on the day, when a crew is waiting and a delivery is at the gate.

One written total follows the survey. It covers the access we have agreed, and the quote should say what is included, so the site is not surprised later. The commercial roofing page lists the buildings we work on, and the yard is left in the state we found it.

Related questions

Does the building need a roof hatch for a commercial roofer?

Not always. Access may be by internal stair, hatch, fixed ladder, a neighbouring yard or a scaffold built for the job. The survey establishes the route and says what each one allows, and the quote states whether scaffold is included, so nothing has to be fitted at the last minute.

Why do you ask about rooflights before the roof is worked on?

HSE treats fragile rooflights as a hazard in their own right. Knowing where yours are, and how old they are, lets us plan boards and guards before anyone is on the roof, instead of finding out once the crew is up there, and it goes into the written method for the job.