A profiled metal roof is made of long coated sheets pressed into ribs or waves. The coating covers the face and the back of each sheet. Wherever a sheet has been cut, the edge of the cut is bare metal, and that bare edge is where cut-edge corrosion begins.
Left alone, the rust can spread back under the coating and lift it, which leaves more bare metal open to the weather. From the pavement the roof may look in good order while its sheet edges are going, and the first sign inside a building may be a stain on a ceiling, some way from the fault.
This guide explains the terms, shows where to look, sets out what a survey checks, and describes how the fault is treated, from cleaning back and coating to overcladding or renewal. It also covers the asbestos, Part L and CDM points that can arise on the same roof, and how a commercial roof is priced. We work on shops, offices, units and blocks of flats, and a roof of this kind is surveyed before any price is written.
What the terms mean on a metal roof
Roofers use a handful of terms that are not always explained. They matter here, because each one is a place where this fault can start or spread.
| Term | What it means |
|---|---|
| Profiled sheet | A long metal roof sheet pressed into ribs or waves for strength |
| Cut edge | The edge left where a sheet was cut to length or to shape, with no coating on it |
| End lap | The overlap where one sheet runs over the next one down the slope |
| Fastener | The screw or bolt that holds a sheet to the frame |
| Purlin | A beam across the frame that carries the sheets |
| Overcladding | A new layer of sheeting fixed over the old roof |
Rain reaches cut edges at the laps, and at the eaves where the sheets end and the water leaves the roof. Those are the first places a survey looks.
The sheet, the lap and the fastener are read together on a survey, because perished sealing washers and loose or rusted fixings can let water in on the same roof as a corroded edge, and each fault needs its own repair.
Sheets trimmed on site, such as those around a rooflight, have bare cut edges of their own, so those are checked as well. Edges get the most attention because every sheet has them, and because they sit at the laps and the eaves where rain collects.
A sheet is coated on its face and its back. The cut edge is where that protection stops.
Where it shows, outside and in
A good deal can be seen from the ground, from an upper window or from inside the building. The signs are these:
- Rust streaks running down a sheet from a lap or from the eaves.
- Coating that has blistered, flaked or lifted along an edge.
- Fasteners with rust around them, or fasteners that have gone missing.
- Brown marks on the underside of the sheets, or on a lining or ceiling below, following the same line as the laps.
- Staining at the eaves or on the gutter below.
- Sheets that move or rattle in the wind where they once sat tight.
Binoculars from the ground can pick out a lifted edge on the lower sheets. A dated photograph taken from the same spot at intervals tells you more than a single look, because it shows how fast the marks are spreading. Inside, look up at the sheets along the same line and note the date.
None of this needs anyone to walk on the roof, and nobody should. HSE says all roofs should be treated as fragile until a competent person has confirmed they are not. Fragile means a sheet can give way under a person's weight, and the edges and fixings are exactly where you would be tempted to stand and look.
Bring the photographs and notes to the survey, because they show what has changed since you first noticed the marks.
What the survey checks on a metal roof
The aim of the survey is to tell whether the corrosion is at the edges only or has gone further, and what the roof is made of below the sheets. It looks at each of these:
- The sheets: the edges, the laps and the face along every row of fixings.
- The fasteners: whether they are rusted, loose or missing, and whether the holes around them have opened.
- The purlins under the sheets: whether the metal is sound beneath the fixings.
- The eaves and the gutter: whether rust-laden water is lying or running there.
- Rooflights: how each is fixed in, and whether the sheet around it has gone.
- The lining and insulation below: whether they have been wetted along the laps.
- The fall of the roof, so that water leaves it and is not held at a lap.
Age alone does not decide the answer. Neighbouring roofs of one date can be in very different states, so we judge each from what its laps and fixings show.
Where the roof is old enough to raise the question, we also look for signs that asbestos cement sheets may be present under or around the metal. The asbestos section below explains why that check comes before any cleaning, cutting or overcladding. The findings of the whole survey, set out in plain words, are what the written quote is built on.
The survey also records the size of the roof and the way into it, since both affect how the work would be carried out and how long it would take.
Treat, overclad or renew the roof
While the metal is in good order, the edge can be treated. Once rust has penetrated sheets across large stretches, patching cannot keep up, and the decision shifts to a new layer or a new roof.
| Route | Suits | What it involves |
|---|---|---|
| Treat | Sound sheets with corrosion at the edges | Cleaning the rust back, then coating the edge and the lap |
| Overclad | Sheets and frame still sound, with the surface beyond treatment | A new layer of sheeting fixed over the old roof |
| Renew | Rust through the sheets or the frame beneath them | Stripping the old sheets and fitting a new roof |
Each route has its own questions to settle. Overcladding adds a layer, so the frame must be able to carry it, and it leaves the old sheets in place, which our answer on whether to overclad or strip a commercial roof explains in more detail. Both overcladding and renewal bring in further checks: the frame, the fixings, the lining and the building's use. Renewal is the larger job, and it brings the Part L figures into play.
Which route suits depends on more than the rust. The building's use, the lining below and how long you plan to keep the building all bear on whether a short-term fix is the right one.
If treatment will hold, we recommend it first. If it would only postpone the larger job, we tell you that too. Whichever route is chosen, after the survey you receive the price as one written total.
Treatment suits a roof whose metal is sound. Once the metal has gone, it only delays the job.
Asbestos, fragile sheets and CDM
HSE's guidance is that if a building was built or refurbished before 2000, you should assume there is asbestos in it. On an older sheeted roof, that question comes before any cleaning, cutting or fixing. A cut edge that is being treated is a different job from one where asbestos is present, and the survey settles which it is.
- HSE's sheet A14 says "AC roofs are always fragile".
- Careful removal of asbestos cement sheets, without breaking them up, is non-licensed work.
- HSE treats asbestos cement sheeting that is "substantially damaged or broken up" as notifiable non-licensed work.
- HSE says to "Use a lockable skip for asbestos", and trade waste of this kind travels on a consignment note.
CDM 2015 applies to a commercial client in full. A project is notifiable if it will last longer than 30 working days with more than 20 workers at once, or exceed 500 person days. With more than one contractor, the client appoints a principal designer and principal contractor in writing, and every project has a construction phase plan. On non-domestic premises, the Control of Asbestos Regulations 2012 also place a duty to manage asbestos on whoever holds the maintenance or repair obligation or controls the premises.
On a roof that has already had work done, ask for any earlier asbestos assessment, because whoever holds the duty to manage asbestos may already have one.
These duties are worked through at the survey, with the roof and the building's use in front of us, so that nothing arrives as a surprise after the quote.
Part L, nests and the written price
Renewing or overcladding a commercial roof can bring the energy rules into the job. Until 24 March 2027, Approved Document L Volume 2 applies to a commercial building. Once renovation passes 50% of a roof element's surface, the improved (b) figure in Table 4.2 is expected for the whole element, where that is feasible. Our guide to Part L on a commercial roof sets out the numbers and the dates, and our guide to fragile roofs and rooflights on units covers access on the same kind of roof.
Bats and nesting birds matter on any roof. GOV.UK names "repairing or replacing a roof" among the activities that can affect bats. Bat roosts are protected whatever the intent behind the damage, and a nest in use or being built is protected against intentional harm. Both are checked as part of the survey. A roof like this has no standard price. The price follows the survey, because the size of the roof, the way it is reached and the route chosen all move it. The quote is one written total price. Ask any roofer whether the price includes access equipment and VAT, so that two quotes can be compared on the same basis.
A landlord, an agent and a tenant can each hold part of the duty to manage asbestos or to arrange the work, so it helps to say at the first contact who controls the roof.
The full range of this work, from repairs to whole-roof renewals, is on our commercial roofing page.

