The short answer

The craft is the same, but the client, the safety duties and the planning position are different. Where the roof is arranged as part of a business, CDM 2015 treats the client as a commercial one, and the client duties stay with it. Residents remain in the building while the work goes on, and who pays is a matter for the lease.

A block of flats is roofed like any other building, but the payer, the residents below and the safety duties differ. This page covers what changes.

Grey dry verge units along the gable of a concrete tile roof

Who counts as the client

CDM 2015 is the set of regulations that puts safety duties on whoever commissions and carries out building work. HSE describes a domestic client as an individual who has construction work carried out on their home, or the home of a family member, that is not done as part of any business. A commercial client is any individual or organisation that carries out a construction project as part of a business.

On a block of flats, the person who arranges the roof is often not an individual homeowner. It may be a freeholder, a management company or an agent acting for the building. Where the roof project is carried out as part of a business, HSE's wording points to a commercial client, and client duties apply in full instead of passing to the contractor.

Our page on who the client is under CDM sets out the test and the duties. Who is entitled to arrange and pay for roof repairs is a different question, and it sits in the lease and in the law of landlord and tenant. That is a matter for a solicitor or the managing agent.

Safety duties that follow the client

A commercial client has duties of its own, and for a block of flats they run from planning through to hand-back:

  • planning how the project will be managed and giving it enough time and other resources
  • putting in writing who the principal designer and principal contractor are, once a second contractor is on the project or is reasonably foreseeable
  • making sure that a construction phase plan exists before the work begins
  • notifying HSE if the project reaches the notification thresholds

The notification test is in regulation 6: longer than 30 working days with more than 20 workers at once at any point, or more than 500 person days. Our page on when a roof project is notifiable covers it. On a full re-cover of a large block, the test is worth checking early.

Each of those duties has to be answered before the first sheet comes off, so it helps to appoint the people early and to ask for the plan in good time. The extra appointments turn on there being more than one contractor, not on notification. A block with scaffolding, roofing and a separate asbestos removal firm has more than one.

Residents below the roof

A house roof is replaced over one family. A block's roof is above many, so the planning is wider. Residents come and go during the working day, so access routes, bin stores, car parking and entrances are agreed with the managing agent before work starts, and the areas under the work are kept clear.

Top-floor flats are the first to be affected, because their ceilings sit directly under the roof structure, and the residents there are told which days the work is above them. When the roof is uncovered one area at a time, each area is closed against the weather before the crew finishes for the day. Windows below the work are best kept shut and balconies kept clear on those days, and the managing agent hears about it in good time. Our page on roof work in an occupied building sets out how that works for any building that stays in use.

Notices to residents are the managing agent's to send, and they work best when they say what is happening, where, for how long and who to ask.

Planning, scaffold and the survey

Under Class C of the permitted development rules, a change of covering on a house is normally allowed. Those rules define a dwellinghouse as something other than a building that contains flats, or a single flat inside one, so Class C does not carry over to a block. Check the position with the planning authority before a different covering is chosen, and ask building control about the Building Regulations route. If the covering is changing in appearance, say so in the first conversation, because neighbours and the freeholder may have a view. Our commercial roofing page covers the other business premises we roof.

Highways Act 1980 s169 requires a licence from the highway authority for scaffolding that obstructs the highway, which a block fronting a street may well do. We arrange the licence with our scaffolder.

The survey is the same as for any commercial roof, taken from safe points: the covering, the falls, the outlets, the flashings, the gutters and anything that looks like asbestos. HSE calls fragile rooflights "a particular hazard", and a block with rooflights over stairwells is no exception. A single written figure comes after the survey.

Related questions

Does a block of flats need a construction phase plan?

Yes. Under CDM 2015 every project has a construction phase plan. The contractor draws it up or arranges for it to be drawn up, and with more than one contractor the principal contractor takes that job. Ask to see the plan before work begins, and ask who has a copy on site.

Who arranges the roof on a block of flats?

That depends on the lease and on how the building is held and managed, which is a legal question for a solicitor or the managing agent. Once the client is known, we survey the roof and give one written total price for the job, so the paperwork is clear from the outset and everyone knows what has been agreed.

Where's the water showing?

You'll get one written total price.