Designers and roofers talk about warm roofs and cold roofs as though everyone knows the difference. If you are planning a flat-roofed extension, you will probably be asked which you want before anyone has explained what the words mean.
The terms describe where the insulation sits in the roof. In a warm roof it sits on top of the structural deck, so the deck and joists stay on the warm side of it. In a cold roof it sits below the deck, between or under the joists, so the structure above it is left cold and the space has to be managed for moisture.
Neither is the right answer for every extension. This post sets out the differences, the Building Regulations figures that apply in England, and the questions to put to your designer, your building control body and your roofer. It names no thickness and no price, because both turn on the product chosen and the roof being built.
What the two terms actually describe
A flat roof is a stack of layers, and the difference between warm and cold is simply the order of that stack. The deck is the structural board or slab that carries the roof. The waterproof covering goes on top, whatever the system, and it is the insulation that moves.
| Question | Warm roof | Cold roof |
|---|---|---|
| Where the insulation sits | Above the deck | Between or under the joists |
| Which side of it the deck is on | The warm side | The cold side |
| The void above the ceiling | Not part of the design | A void that has to be managed |
There is also a third arrangement, a hybrid, in which some insulation goes above the deck and some between the joists. The same questions about moisture and the Part L figures apply to it, so this post treats it as a variation on the two. If a designer proposes one, ask why, and ask who has checked the moisture design.
Whichever you choose, the covering is a separate decision. Our comparison of the three main coverings covers those, and each of them can go on a warm roof or a cold one. What differs is the build-up beneath the covering, and the work that has to be done to get it right.
In both systems the deck has to be sound before anything goes on it. Boards that have taken in water, or a deck that dips between its supports, will undermine any insulation laid above, and no choice of warm or cold makes up for that.
Moisture is the reason the choice matters
The reason a cold roof needs more care is moisture. Air inside a house carries water vapour, and where that air meets a cold surface the vapour can condense. In a cold roof the structure above the insulation is cold, so the design has to keep moist air out of it and leave a way for any moisture that gets in to escape.
That is what BS 5250, the standard setting out good practice on moisture in buildings, is about. The BSI lists the 2021 edition as current but under review, so the guidance may move. In practice it shows up as a ceiling that is well sealed, a vapour control layer where the design calls for one, and ventilation of the void where the design needs it.
Ventilation figures depend on the roof. Marley gives figures for a pitched roof laid with a high-resistance underlay: 25 mm of eaves ventilation at 15 degrees or less, and 10 mm above 15 degrees. An underlay of that kind stops vapour passing, which is the reason the air has to move. A flat cold roof is specified by its designer for the build-up in question, and a pitched-roof figure should not be borrowed for it.
A warm roof takes a different approach. By putting the insulation above the deck, it aims to keep the deck and the joists warm, so there is no cold void in the design to ventilate. Even so, it still needs a well-detailed build-up, because moisture can arrive from inside or from a leak above.
The Part L figures for a new extension roof
In England the energy rules for an extension sit in Approved Document L, Volume 1 (2021 edition, incorporating 2023 amendments), which has applied since 15 June 2022. It sets limiting U-values. A U-value is the rate at which heat escapes through a roof, so a lower number means better insulation.
- Table 4.2, new fabric elements in existing dwellings: the limit for a roof is 0.15 W/(m²·K).
- The same table gives rooflights 2.2 W/(m²·K). That figure is for rooflights only: a roof window follows the window limit instead, which is 1.4, or WER Band B.
- The rules count walls, floors and roofs as thermal elements. Windows, doors, roof windows and rooflights are dealt with separately.
For a flat roof extension, those figures set the insulation the roof has to carry. A warm roof and a cold roof can both reach them, but they reach them by different routes, and the product data sheet for the chosen insulation gives the thickness needed to get there. The designer, not the roofer, should show that the build-up meets the table.
These are the numbers to put in front of the person designing your extension. Ask them to state which figure the roof is designed to and which table it comes from, then ask the building control body the same thing.
AD L 2026 takes effect on 24 March 2027 and renumbers the tables. Until then it is the 2021 edition and its Table 4.2 that govern a new roof in England.
Renovating an existing flat roof
Re-covering an existing flat roof raises a different question. AD L treats it as renovation: paragraph 11.2(d) names it directly, and that is what brings the roof under the renovation figures.
Table 4.3 sets a threshold of 0.35 and an improved standard of 0.16 for a roof, both in W/(m²·K). Where more than half the roof surface is renovated, or the work amounts to a major renovation, the roof as a whole should reach 0.16 if that is feasible. Paragraph 4.12 adds that a retained roof above the threshold, as in a loft or garage conversion, should also be upgraded to that column. Paragraph 4.13 offers relief where that is not feasible or would take longer than 15 years to pay back, and says the figure should not generally be above 0.7. Our comparison of EPDM, GRP and felt sets out the same test in more detail.
On an existing roof, this is where the warm-or-cold question gets practical. Insulation added above the deck raises the finished height of the roof. Insulation added below it uses the depth of the joists, and what that depth can hold depends on the build-up already there, including the ceiling.
The existing roof may also limit the choice in ways no drawing shows. A deck that has moved, joists of different depths or a ceiling already fixed in place can all rule a route in or out, which is why the survey comes before the specification and not the other way round.
Questions to settle before the design is fixed
The choice between warm and cold need not be made on principle. It comes out of a set of practical questions about the extension, and it is worth asking all of them before a drawing is signed off.
- How high can the finished roof edge sit? A warm roof stacks the insulation on top of the deck, so it can raise the edge, and that matters at a door threshold, a window head or a boundary.
- How deep are the joists, and how much of that depth is already taken by the ceiling? A cold roof keeps the insulation inside that depth.
- Is there a rooflight? It adds a kerb detail and its own U-value, and the roof around it has to meet the roof limit.
- Who is responsible for showing that the build-up reaches the U-value in the table?
- What happens to the finished fall? BS 6229:2025 sets a minimum finished fall of 1:80, and the roof is designed for a steeper fall so that the finished roof allows for tolerances.
None of these questions has a built-in answer. A well-framed set of drawings answers them in advance, and a roofer who sees those drawings before pricing will quote for what is on them, not for a guess. If the drawings say nothing about the build-up, ask for a clear statement of it before a quote is accepted, because two quotes for different build-ups cannot sensibly be compared.
It also helps to have each roofer state in writing what sits between the ceiling and the covering, in order. A short list in that order, from the plasterboard up to the membrane, shows at a glance whether the roof is warm, cold or a hybrid.
Who decides, and what happens next
Building control is carried out by the council's building control team or by a registered building control approver, and the choice of route is yours. Whichever you use, the roof is assessed against the energy rules above, and the sensible time to ask how is before the build-up is chosen, not after the deck is in. A roof that has already been built to the wrong build-up is expensive to open up again. Keep the paperwork in one place: the drawings, the insulation data sheet, the building control body's comments and the quote together show who decided what.
Planning permission is separate. Planning permission for the extension itself is a question for your local planning authority, and it is worth checking whether an Article 4 direction or a listing applies to the house. We confirm the Building Regulations route with your building control body before work starts.
On the roofing side, the written quote should say which build-up it prices, what covering goes on top, and how the fall is set. After a survey it comes as one total price. If your roofer is working from a designer's drawing, the quote should describe the same build-up as that drawing, even though the price itself stays one total.
Two further pages on this site help when you are choosing. One covers Building Regulations for a new flat roof, and the other answers whether a flat roof needs ventilation. Both belong to our flat roofing work, which starts with a survey.
Filed under Flat roofing

