
Fixings
Where a nail or a clip pins each unit of a Woolston covering to its batten.
Near the shore that specification is worked out for the individual house, not copied across.

Woolston is a district of Southampton, 19.4 road miles west of Havant; the hold of its roof coverings and the lead around its chimneys and walls are tested before a repair is suggested.
10-year workmanship guarantee, in writing

Where a nail or a clip pins each unit of a Woolston covering to its batten.
Near the shore that specification is worked out for the individual house, not copied across.

Where a chimney or gable wall pushes up through a Woolston slope and lead dresses the join.
Once an edge of that metal lifts, rain slips behind it and drops into the room.

Where the membrane beneath a Woolston covering catches whatever slips past the tiles above.
A torn or sagging sheet shows as a ceiling stain long before any tile moves.

Each schedule is calculated per site under BS 5534, because Cupa says coastal buildings "will be graded with higher exposure". That grading is recorded with the survey, and the quote describes the result in plain words.
Nothing on a roof stays up by weight alone. Each unit is pinned to a batten, and the batten is screwed across the rafters, so a Woolston survey begins by working a sample of tiles loose, in the field of the slope and along its borders. Under each one we judge the batten for splits, the nail for bite and the clip for being there at all, and we glance at the membrane for tears. Cupa, the slate maker, says that coastal areas, along with slopes, hills and tall buildings, "will be graded with higher exposure", and Woolston lies close to the shore. The fixing schedule for a house here is therefore calculated for that site under BS 5534, with the answer written into the quote. Our pitched roofing page covers a whole re-cover, and our roof inspections page covers a survey by itself.
Paperwork comes before a start date. The Planning Portal's test asks for less than 25 per cent of the building envelope together with less than 50 per cent of the roof to be involved: stay inside both figures and no building regulations application is required as a rule, while a covering 15 per cent or more heavier adds a distinct duty to seek approval. Woolston addresses are put to your building control body ahead of booking, and its reply is relayed to you without a glossary, with a copy kept in the survey papers.
Marley adds that mortar "could no longer be relied upon" as the sole way to secure a covering, and it says installing to BS 5534 "isn't required by law". A roof fixed years ago with a little mortar and a few nails is exactly what the sampling is meant to uncover, and the written findings mark where it turned up.
A tile holds only as firmly as the clip behind it.
A single loose tile tells us very little, which is why a handful of openings are made, some near the borders and some deep in the field. Where batten, nail and clip all hold, the repair stays small and the remainder of the covering is untouched. Where they do not, that area is outlined on a sketch with a proposed method and the reason beside it, so the scope of the work is never a guess.

Roof and wall are different trades, and the join belongs to neither.
Wherever a chimney or a wall rises through a slope, a strip of lead must be laid over the join, and that strip is where a Woolston survey slows down. We check for curled or split edges, the lead let into the mortar line, the pointing above it and the corner where one flashing meets the next. Our leadwork page explains the cutting and dressing of flashings, and the findings state whether a length needs refixing or renewing. Where the metal is sound and only its fixing has slackened, the repair is to the fixing, and nothing is stripped that does not need to be. Crumbled mortar above a flashing is raked out and refilled before the lead is dressed back, as metal pushed into a failed joint will slip out again within a season or two.
Listing is a live question in Woolston. The National Heritage List has Woolston Signal Box at Grade II, and the Church of St Mark at Grade II as well. St Mark's is in use for Church of England worship, which puts its roof works under that church's own faculty jurisdiction rather than listed building consent. A privately owned listed house follows the council route instead: consent under section 7 of the 1990 Act covers any work affecting its character.
Old Woolston and St Annes Road are Southampton City Council's conservation areas. A direction under Article 4 may withdraw rights that would otherwise apply, so ask Southampton City Council about your own road before touching a slope that faces the street. The planning guide for roof work covers the national rules, and this page leaves them there. Whatever the council replies is noted alongside the survey, with the date it was said, ahead of any figure.
A flashing can look sound from the slope and still be admitting water at an edge nobody sees. We check it from the roof and then from inside the loft, where a torch picks out tide marks on timber and darkened brick beside the breast. Photographs from both positions sit in the findings, so the join we mean is visible and the choice between refixing and renewing is yours.
A brown mark close to the flue breast on a bedroom wall upstairs, returning every wet week.
A curled lead edge, or a crumbled mortar line that should hold it, where rain tracks behind the metal.
Working loose a sample of units gives a view of the battens for splits, the nails for grip, the clips for presence and the underlay for tears. A slipped tile can signal a fixing failure along an entire course, so a single loose unit is never judged alone. Photographs of each opening are filed with a note of what was seen, so the sample can be checked later against the roof itself. Where everything holds, the repair stays small, while a weak patch is described with a method for that patch only and the reasoning behind it, in terms a non-roofer can follow.
The schedule is worked out for the individual site. Cupa, a slate maker, says coastal buildings "will be graded with higher exposure", so the fixings are calculated under BS 5534 for each house we visit. Marley describes the standard as a code of practice, with no force of law behind it. The grading is recorded with the survey and the outcome is set out in the written quote, so you can read what was specified and the reason it was chosen, and hold it up against any other quote you have been given.
Two limits come from the Planning Portal. Re-roofing that touches less than 25 per cent of the building envelope and less than 50 per cent of the roof sits outside the application requirement as a rule, whereas any new covering 15 per cent or more heavier brings a requirement for approval, whatever stretch of roof is involved, and that approval is a separate step from planning. Your building control body handles Woolston addresses, so yours is put to it before work is booked. The reply is relayed in plain terms, and a copy is filed with the survey should the question arise again later.
Anything erected over a footway or road, scaffold included, needs a licence under section 169 of the Highways Act 1980, and for Woolston the licensing body is Southampton City Council. Southampton City Council opens its scaffold licence to contractors who hold £10 million public liability insurance, and a licence under it carries a £496 minimum: a £157 licence fee, £146 for pre- and post-inspections, a refundable £157 deposit and £36 per weekly inspection; after that it is renewable weekly at £36 per week. We arrange it with our scaffolder, and dates are shared with you ahead of time.
The Church of St Mark is listed Grade II (list entry 1091989) and holds Church of England worship. Such a church sits outside listed building consent, and its works go through the faculty system of the church itself. A privately owned listed home is treated differently, because section 7 of the 1990 Act requires consent for anything affecting its character, and the council is the body that answers questions about it, so it is worth asking before work is booked and not after. If you cannot tell whether yours is a listed home, search the register for your address first, and pass us whatever it shows.
Old Woolston and St Annes Road are designated conservation areas held by Southampton City Council, which can tell you which side of a boundary your house stands on. The council keeps the maps, so take your own road to it and do not go by what a street is called. Re-covering a dwelling remains permitted development as a general matter inside such a boundary, but a direction under Article 4 may withdraw more rights, so put your plan to Southampton City Council before work on any slope visible from the road. Our planning guide holds the national picture, and the council's reply is added to the survey papers.
Look at the chimney from the garden: a flashing standing proud of the brick, a dark streak down the stack or white powder on the masonry can all mark a join that is losing its grip, and binoculars from the lawn will show more than a glance from the kitchen window. Indoors, a brown mark on an upstairs wall beside the breast that returns after wet weather is the signal worth photographing. Send the pictures to us before the visit, and the survey can open at that join, then follow the water outwards along the path it took, down to the drain.
Check which work it covers, and whether VAT and scaffold fall within it or sit on top, before you weigh the figure itself. What we hand over is one written total price after the survey, with photographs of what we found placed alongside it, and where a repair will answer, that is the first option offered. Good, fair pricing is the aim, and a larger job is put to you only where the survey supports it, with the evidence laid out. A quote from elsewhere that stays quiet about scaffold or VAT needs those points confirmed in writing, so the two totals can be placed side by side on equal terms.
You'll get one written total price.
Fill in what you like. It opens WhatsApp with your message ready to send.