023 9396 0313 Get a written quote
A street of hipped bungalows below a green hill

Roofers in Portswood

Portswood is a district of Southampton, 23.3 road miles west of Havant. Its wall joins and hip caps get read first, before any quote is considered.

10-year workmanship guarantee, in writing

  • PlanningSouthampton City Council
  • Building controlyour building control body
  • Scaffold licenceSouthampton City Council

Where rain gets into roofs in Portswood

A small lead-covered bay window roof with wood-cored rolls on a Victorian house

Abutments

Where a Portswood slope butts into the side of a bay, an extension or a neighbour's gable.

Strips of stepped lead are tucked into the brickwork there, and one curled corner admits the rain.

Crumbling mortar beneath old half-round clay ridge tiles

Hips

Where the roof folds outward at a corner and a spine of capping tiles is bedded along it.

Once a cap works loose, driven rain reaches the underlay beneath without leaving a mark outside.

A blocked uPVC gutter overflowing with rainwater after a storm

Gutters

Where the lowest tiles of a Portswood slope shed into a run of plastic or cast guttering.

A bowed length or a seeping joint lets the flow slip behind the pipe and down the brickwork.

A lead-covered bay window roof on an Edwardian house
Stepped lead flashing where a slope meets a house wall

A join stands or falls with the lead tucked into the wall.

AbutmentsPortswood wall joins and the listed names around them

Anywhere a Portswood slope butts into a wall, the join has to be judged by itself. The wall might belong to a neighbour, a bay window or a side extension. We study the stepped lead tucked into the brickwork, push at its edges to see whether any have curled outward, and run a gaze along the pointing overhead, hunting for gaps behind the metal. In the roof space we put a lamp on the rafter nearest the wall, since a darkened patch there confirms where the damp came from. One curled corner is a quick mend. A strip split lengthwise has to be renewed, and the pictures we take make that plain. Where a wall also carries a chimney stack, the flashing round it is read on the same pass. Our leadwork page explains how the metal is dressed.

Three conservation areas lie close to the centre of Portswood: Portswood Residents' Gardens, Oakmount Triangle and Uplands Estate. Southampton City Council keeps their boundaries, so put your road to the council before assuming anything. The National Heritage List gives Christ Church Portswood, The Dutch House and Swiss Cottage a Grade II entry each (list entries 1092052, 1380291 and 1091997). A listed house needs listed building consent, under section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990, for work that changes its character. Whether the church answers to a denomination's own system or to the council hangs on who worships there and whether services still take place, so ask Southampton City Council.

Southampton City Council has Article 4 directions for the Uplands Estate, Portswood Residents' Gardens and Oakmount Triangle Conservation Areas. A direction of that sort may withdraw permitted rights, which is why Southampton City Council should be asked before you plan work on any slope facing the road. The planning guide for roof work holds the national rules, which stay there.

At the wall

Lead
steps and upper edge
Mortar
the line above the lead
Cut tiles
the course beside the wall

The stain is elsewhere

A mark on a bedroom wall beside a shared wall or chimney breast need not sit beneath the join that admitted the rain. Drops run down a rafter or along a batten and fall at the first low spot, which may be a metre off. For that reason we work uphill from the mark and outward from the roof space, photographing each stage, and the repair lands on the entry point rather than on the stain.

Where it shows

A damp tide-line on the ceiling next to a shared wall, deeper after each wet week.

Where it gets in

Lead curled at its upper edge, or mortar missing from the joint above it, letting rain creep behind the lead.

Edwardian brick villas with clay tile roofs and decorative ridges
Capping tiles running down a hip to the gutter

Does one cracked hip cap mean a new hip?

Not by itself. When the caps beside it sit firm and the bed under them is sound, one cap is replaced and rebedded. If several move when pushed, the findings say so, and the line is taken down and refixed from end to end.

HipsPortswood hips, from the capping tiles to the gutter below

A hip is the outward corner where two slopes meet, with capping tiles along the seam. At a Portswood hip we begin on the ground, sighting along the line for a cap that has dropped, and then go up to check each tile for play. The mortar bed under each one gets looked at for cracks and powdering, and the lower end, where a hip stops at the gutter, is checked for a gap that wind could lift. Marley says installing to BS 5534 "isn't required by law" and that mortar "could no longer be relied upon" as the only fixing, so we examine how every cap is held as well as how it is bedded, and judge the hip along its whole length rather than at one tile. Where the whole line has loosened, the dry ridge and verge page sets out what rebuilding it involves.

Whatever the hip sheds is caught by the gutter beneath. Brett Martin advises a fall of 1 mm for every 600 mm towards the outlet, we squint along each run for a belly, a standing pool or a seam that weeps, and watch where the downpipe discharges. The fascia behind gets a screwdriver tip pressed into it, since soft timber means the board has been damp for a while. The gutters, soffits and fascias page covers choices running from a single new bracket to a full run.

When the walk-round is over the verdict is mending or a new covering, each reason spelled out, and a sound covering means mending comes first. A written total price follows with the photographs alongside it, and broken tile ends and dust are swept off the drive and the lawn before the ladders go. Questions about what we saw are answered in plain English, on the phone or in writing, whichever suits you.

A corner that looks whole can still rock under one hand.

Pushing each cap

A cap can look perfect from the pavement and still rock beneath a gloved hand, because the bed under it has cracked and let go. Gusts then lift a loose corner, and the underlay takes the first of the weather. Every cap on the line is pushed, the ones that move are ringed on a photograph, and the findings spell out which caps want rebedding and whether the whole hip should come down and go back.

Along the corner

Caps
play and cracks
Bedding
powdering or gaps
Gutter
fall towards the outlet
Fascia
softness under pressure

Map of Portswood and the places around it, with the dashed line of our 30-mile service area from Havant. The same places are listed below the map.

Portswood's three conservation areas, and what sits under the lead

Why does a Portswood survey begin at the wall joins?

Each join between a slope and a wall is a seam between two kinds of work, and rain looks for seams. At every one we feel the stepped lead for curled edges, study the pointing above for gaps, and check whether the tiles cut against the wall have shifted. A lamp in the roof space then picks out any darkened timber beside the join. Since a ceiling mark can sit a metre from the entry, the trace runs uphill from the mark. The findings state whether an edge needs refixing or a length of lead needs renewing, with a photograph of each.

Does re-roofing a Portswood house need building regulations approval?

The Planning Portal sets the test. To avoid a building regulations application, a re-roof should affect less than 25 per cent of the building envelope and less than 50 per cent of the roof; a separate rule says a new covering that is 15 per cent or more heavier does need approval. Whether a job falls inside those limits depends on the house, so we ask your building control body which route applies before any work starts, and we pass its reply on in plain words. Planning permission is a separate question, and our planning guide shows how to check it for a listed house or a house in a conservation area.

Which body licenses scaffolding on a Portswood road?

Before scaffolding can stand on a highway it needs a licence under section 169 of the Highways Act 1980, and for Portswood the body is Southampton City Council. Southampton City Council says contractors who hold £10 million public liability insurance may apply for a licence. Southampton City Council's fee is a £496 minimum, made up of a £157 licence fee, £146 for pre- and post-inspections, a refundable £157 deposit and £36 per weekly inspection, and the licence is renewable weekly at £36 per week. We arrange it with our scaffolder, with dates agreed between us and you before the application goes in.

Which Portswood buildings are listed, and what follows for a roof?

Historic England's list carries Grade II entries for Christ Church Portswood, The Dutch House and Swiss Cottage (list entries 1092052, 1380291 and 1091997). Listed building consent is needed for anything that touches the building's character. Look the address up on the list before a single tile is ordered, and keep a copy of the entry with the survey notes. The church is a separate case, because its consent route follows the denomination and its current use, so put that question to Southampton City Council. If you send us your list entry, the survey notes will be written around it.

Is my road inside Oakmount Triangle or either of the other two?

The three areas are Portswood Residents' Gardens, Oakmount Triangle and Uplands Estate, and Southampton City Council keeps their boundaries, so ask the council to confirm where your house number stands in relation to each boundary. Ordinary re-roofing is normally permitted development even in a conservation area, but an Article 4 direction can strip further rights, and the council has one for each of these three. Ask Southampton City Council what they cover before work on a slope facing the road, and ask it to confirm in writing if you can. Its answer is entered in the survey notes with the date you were given it, so the roof plan and the council's reply stay together.

How are Portswood hip caps and their mortar beds checked?

From the pavement first, sighting along the hip for a cap that has dropped or a line that has gone wavy. Up on the roof each cap is pushed for play, the mortar under it is looked at for cracks and powder, and the foot of the hip is checked for a gap beside the gutter. Caps that move are ringed on a photograph. The findings then say whether one or two want rebedding or the whole line should be lifted and fixed again, with the reason beside each, so the repair on the quote matches what we saw and the quote never goes beyond what the findings support.

What can I look for from the pavement outside my Portswood house?

Take a look after the next downpour. A gutter that holds a pool, a joint with a drip hanging from it, or a green streak down the wall below the eaves all point to trouble. Glance along the hips for a cap sitting out of line, and at the lead where a slope meets a wall for a corner curling outward. Inside, a damp ring on a ceiling that widens in wet spells deserves a photograph. Send us what you notice and we will say what it suggests before anyone climbs a ladder, so a small find does not turn into a visit you did not need.

What must a Portswood written price spell out?

One total, a plain description of the work, and a line saying if the sum takes in VAT and the scaffolding. It should come only once somebody has climbed onto the slopes and looked inside the roof space. Our written total price arrives with the survey photographs beside it, and where the covering is sound the repair is priced first. These prices are good and fair. Should a second quote omit scaffold or VAT, get the missing detail in writing, and the two figures can then be laid next to each other without guesswork about what each one includes.

Where's the water showing?

You'll get one written total price.

Get a quote Call WhatsApp