
Valleys
Where two Swaythling slopes lean together and one line between them takes both their rainfalls.
Moss or silt along that line dams the flow and pushes water sideways under the covering.

Swaythling is a district of Southampton, 22.4 road miles west of Havant; its roof valleys and the lofts beneath them are read together, because the lowest line shows where water gathers and the timber shows where it went.
10-year workmanship guarantee, in writing

Where two Swaythling slopes lean together and one line between them takes both their rainfalls.
Moss or silt along that line dams the flow and pushes water sideways under the covering.

Where the timber under a Swaythling roof keeps a record of whatever passes the covering.
A torch along those beams can find the route of a drip before any ceiling shows a mark.

Where air is meant to enter at the bottom of a Swaythling slope and leave near the top.
Block that path and damp gathers in the roof space, beading on the underside of the covering.

The lowest line of a roof is the one every drop must use.
Where two slopes tip towards each other, the lowest line of the roof forms, and the rain of both arrives in it together. Few lines on a Swaythling house work harder, so the survey gives it a pass of its own. Whatever lies in the bottom is judged for cracks and thin patches, the cut ends of the tiles along each side are tested for movement, and leaves, moss and grit are cleared out before any verdict, because a choked line hides its own faults. Our leadwork page describes valley linings made in lead, and our roof repairs page covers fixes to the slope around one. If the lining proves sound and only the tiles beside it have shifted, the repair stays with the tiles and the lining is left undisturbed, which saves both money and mess, and the photographs show why that call was made.
Ethelburt Avenue, Itchen Valley and Bassett Green Village are Southampton City Council's conservation areas, and Swaythling lies among them. Channels Farmhouse is listed at Grade II, so a listed house here takes the council route, with consent under section 7 of the 1990 Act wherever work would alter its character. Southampton City Council has an Article 4 direction for the Ethelburt Avenue Conservation Area, and since a direction under Article 4 can withdraw rights, put your own road to Southampton City Council before work on a face of the roof that the street can see.
The planning guide for roof work holds the national rules, which this page does not restate. The council's answer is written next to the survey with its date, ahead of a price, so the order of events is on paper if it is ever questioned, and a later owner can read it too.
A valley carries more water than the plain slope beside it, because it drains two slopes and not one. Grit and leaves pile up in it, and the lining underneath wears under that load. We clear it, look at what is revealed and photograph the result. A lining worn along its run is renewed along that run, since a patch in one spot leaves the rest to fail in turn.
A damp mark high up an upstairs side wall that darkens after a long wet spell and dries slowly.
A thin or split spot along the line, or cut tiles on its flank that have shifted and opened a path.

The timber shows where water travelled, and a stain on a ceiling may sit a long way from where it entered. Reading the loft first tells us which stretch of the slope to open and which to leave alone.
A loft is where the roof keeps its diary. Rafters darkened at their feet, felt gone limp with wet, a pinprick of daylight and a trickle of rust down a nail all tell what the weather has done, and a Swaythling survey reads those entries with a torch before it climbs onto the slope. Our roof inspections page describes a survey carried out on its own. Leaks are not the only subject: a roof space that holds damp air can bead moisture against the inner face of the covering, so the eaves are checked to see whether air can get in. Marley's eaves figures, for a high-resistance underlay laid on a cold roof, are 25mm for pitches of 15° or less and 10mm for pitches of more than 15°. Insulation stuffed hard into the eaves can shut that path, and we look for it from the loft side.
Re-roofing raises a building regulations question. The Planning Portal looks for less than 25 per cent of the building envelope and less than 50 per cent of the roof to be touched, and it treats a covering 15 per cent or more heavier as needing approval whatever the area. We take Swaythling addresses to your building control body before a job is booked and relay what it says, in words that need no translating, with the reply kept alongside the survey and the photographs.
A scaffold on a Swaythling street needs a highway licence, and Southampton City Council says contractors who hold £10 million public liability insurance may apply for a licence, at a £496 minimum charge. We arrange it with our scaffolder, and the dates we propose reach you before any application is lodged, so no one is surprised by a delivery of poles.
Rafters keep the diary that the ceiling has not read yet.
Two sights in a loft always earn a photograph: daylight where none belongs, and timber darker than its neighbours. The first marks a gap in the covering, and the second marks a place that has been wet, possibly for a long while. Taken together they let the survey name the exact stretch of roof involved, so the work proposed is sized to the fault and not to the whole slope.
Rain from two slopes ends up in a single line there, so a defect admits far more water than one broken tile would. Debris is cleared first. Next the lining is examined for splits and thin metal, then the cut tiles running down each side, looking for movement. A mark high on a bedroom wall may trace to the same line, which is why the loft is read afterwards. The report says whether the lining needs a local mend or renewing along its whole run, and a sound, clean valley is recorded as exactly that, with a photograph to show it.
Two limits come from the Planning Portal. Work touching less than 25 per cent of the building envelope and less than 50 per cent of the roof sits within the no-application range, though a covering 15 per cent or more heavier is caught by separate approval rules, however small the patch. Your building control body decides how the route runs, so yours is consulted before booking. Its reply reaches you in plain language and a copy goes into the survey file, so the chosen route is on record, and any structural check it asks for is noted before work is booked.
Poles over a pavement or carriageway need a licence under section 169 of the Highways Act 1980, and in Swaythling the licensing body is Southampton City Council. Southampton City Council says contractors who hold £10 million public liability insurance may apply for a licence, at a £496 minimum made up of a £157 licence fee, £146 for pre- and post-inspections, a refundable £157 deposit and £36 per weekly inspection. It is renewable weekly at £36 per week. We arrange it with our scaffolder, and no start is fixed until you agree it, so the licence and the work begin on a date that suits you.
Ethelburt Avenue, Itchen Valley and Bassett Green Village are conservation areas held by Southampton City Council. The council holds the maps, so ask whether your road is inside one rather than judging by a street name. A house that is re-covered stays within permitted development as a rule even inside such an area, but a direction under Article 4 can remove further rights, and the council has one for the Ethelburt Avenue Conservation Area, so ask it what that covers. The planning guide on this site carries the national rules, and the council's answer joins your report with its date, which is useful if the house is sold.
The National Heritage List carries Channels Farmhouse at Grade II (list entry 1092035). Section 7 of the 1990 Act requires consent for anything touching a listed house's character, and the council settles that question, so it is better asked at the start, before any date is fixed, than discovered after the poles are up. Search the register under your own address before ordering a thing. If your house appears, send us the entry, and the survey will be framed around it, with the repair kept as small as the evidence permits and the consent question put first.
Standing in the loft, we look for a clear path where air should enter along the eaves, and for signs that it has been blocked: insulation pushed hard against the felt, debris in the gap, or damp beading on the underside of the covering. Marley gives 25mm along the eaves for pitches of 15° or less and 10mm for pitches of more than 15°, for a high-resistance underlay laid on a cold roof. The report records what we found and what, if anything, should change, so that a fix is never guesswork and nobody pays for ventilation that was already adequate.
Take a wide picture of the ceiling stain and a close one beside it, ideally the day after rain, then a shot of the same spot a week later to show whether it has dried. Note the date on each. If you can reach the loft safely, a photograph of any daylight or dark patch on the timber helps more than a description. None of it names the cause, but it tells us where to begin, and it saves time on the first visit for everyone concerned, especially if the weather has dried the stain out by the time we arrive.
A plain account of the work, a line on whether VAT and scaffold are priced in, and one total at the end. We write ours once the roof and the loft have both been seen, with the photographs attached, and a repair is the first thing offered where it will serve. Fair, sensible pricing is the aim. Should another quote be silent on scaffold or VAT, have both confirmed in writing, so that the two totals can be compared and no surprise arrives later, whichever firm you choose.
You'll get one written total price.
Fill in what you like. It opens WhatsApp with your message ready to send.