
Stacks
Where a chimney rises through an Eastleigh roof, with a skirt of lead dressed round its foot.
One lifted edge in that collar lets rain run behind the metal and into the brickwork.

Eastleigh is 23.5 road miles north-west of Havant; chimney stacks, lead and flat extension roofs there are each traced to their source, with one written total price to follow.
10-year workmanship guarantee, in writing

Where a chimney rises through an Eastleigh roof, with a skirt of lead dressed round its foot.
One lifted edge in that collar lets rain run behind the metal and into the brickwork.

Where a flat extension roof meets the house wall and its covering is folded up against it.
A split along that turn gives rain a way in behind the covering and down inside the wall.

Where the water that crosses a flat roof finally leaves it, through an opening cut at its low edge.
Debris wedged in that opening keeps the pool on the surface, where it works at the seams.

A stack can leak through the lead and pointing at its foot.
A chimney breast, a party wall, a porch roof backing on to brick: each is a place where a slope stops and something else begins, and each gets its own look in an Eastleigh survey. At a stack the ladder goes up first. We feel for lead that has curled away from the brick, check how the upper edge of the lead is let into the brickwork, and sight along the pointing for hairline gaps. Then comes the loft, where a torch on the timbers either side of the breast can show a tide-mark or a darkened rafter that the bedroom ceiling never did. Our chimney repairs page covers the stack itself, with the lead round its foot read on the same visit.
On the National Heritage List, Eastleigh Railway Station, Eastleigh War Memorial and the Church of the Resurrection each hold a Grade II entry. If a house is listed in its own right, any work that affects its character calls for listed building consent, and the list entry for the address shows whether that applies to yours. A church follows a different route again, set by its denomination and by whether services are still held in it, so for the Church of the Resurrection the entry and the council are the places to ask.
Close to the centre of Eastleigh lies the Bishopstoke conservation area; whether your road falls inside it is a question for Eastleigh Borough Council. Whether an Article 4 direction reaches one road is for that council as well, so ask Eastleigh Borough Council before booking anything. The Building Regulations side of a re-roof runs through Eastleigh Borough Council's building control, in turn delivered through a partnership arrangement with Southampton City Council. Everything else about the rules sits in the planning guide for roof work.
A ceiling stain may not sit under the join that caused it. Rain runs down a rafter and drips at the first low point, which can be a metre away from the entry. So the survey works outward from the stain and uphill from the loft, and every stage is photographed, so the pictures can be set against the stain. The repair goes to the point of entry, and sealant over tired lead is never how a stack is mended.
A damp patch on the wall beside the chimney breast that comes back after every spell of rain.
Lead lifting away at the foot of the stack, or mortar gone from the joints above it, so rain slips in behind the lead.

Two faults give the same puddle: an outlet clogged with debris, and a fall that has been lost. We clear the opening and observe the water; if it still collects, the covering needs relaying instead of patching. Photographs show you which one applies.
A flat roof over a rear extension or a garage does not shed water the way a pitched slope does. Rain has no steep run to follow, so three small details decide whether it leaves or lingers: a gentle fall across the surface, a sound edge where the covering rises against the house, and an open outlet at the lowest point. For an Eastleigh survey we begin at that wall edge, feeling along it for splits and for covering that has come away. Next we look across the surface for rings left by puddles that have dried, and finally at the outlet, which we clear before judging anything else. If water still lingers once the opening is clear, the fall is the trouble, and that is a relaying job, not a patch. From inside the extension we also look at the ceiling beneath for staining along the wall edge and under the outlet, because those are the places where a failing roof shows itself. The flat roofing page describes both outcomes.
Below the edge sits the gutter, where one is fitted, and the downpipe. Sagging runs, dripping seams and pipes that discharge against the wall can be spotted from a ladder, and the fascia behind the run gets tested with a screwdriver point. Our gutters, soffits and fascias page lists the choices, ranging from small fixes to a full replacement run.
The verdict follows from what was seen. If the roof wants mending, that comes first; if it needs covering again, you are told why, with photographs from above and below. Anything seen in the loft or at the gutter goes into the same findings, so one document covers the whole roof. Should a re-roof turn out to be the answer, the written price names the covering and the fixings. The site is left swept when the work is done.
On a flat roof, a puddle is the first thing worth reading.
A pool on a flat roof is a symptom, not a diagnosis. Two causes make the same puddle, and the cure for one is useless against the other. So we clear the outlet, pour water across the covering and watch which way it travels. Water that still gathers points to a fall that has gone, and the findings then explain why relaying, not patching, is the answer.
Map of Eastleigh and the places around it, with the dashed line of our 30-mile service area from Havant. The same places are listed below the map.
The check has two halves. Outside, we feel along the lead running up the stack, lean on the fixings, and sight along the pointing for hairline gaps. Inside, a torch shows whether the timbers beside the breast carry a tide-mark. Together they say whether rain is getting behind the metal, and where. A lifted corner is a short job. A length that has split or worn thin needs renewing, and the pictures show the difference at a glance. You see them before any figure is put to you, so the repair you are quoted is the repair the stack needs.
Two different offices answer two different questions. Building Regulations first. The Planning Portal sets the test: work within the limits of less than 25 per cent of the building envelope and less than 50 per cent of the roof normally goes ahead without an application, but approval is needed whatever the area if the new covering is 15 per cent or more heavier. In Eastleigh that conversation is with Eastleigh Borough Council's building control, itself delivered through a partnership arrangement with Southampton City Council. Planning permission is another subject altogether, answered in the planning guide, which also handles listed and conservation area addresses.
A licence under section 169 of the Highways Act 1980 is needed before scaffolding stands over the highway. In Eastleigh the authority is Hampshire County Council, whose published charge is £211.90 on application for the first 2 weeks and £72 for each additional 2-week period; its notice requirement is ten clear working days before the licence is to begin. Hampshire County Council's page says: "Scaffolding companies must apply on behalf of their customers." We arrange it with our scaffolder, after agreeing dates with you, so the licence fits the work. No extensions are granted, so the first request has to span the whole job, and extra time means a fresh application with new fees.
Historic England's list carries Grade II entries for Eastleigh Railway Station, Eastleigh War Memorial and the Church of the Resurrection (list entry 1322701). Should your house have an entry of its own, listed building consent is required whenever the work would affect the building's character. A church takes its own route, decided by its denomination and by whether it is in use, so ask the council about the Church of the Resurrection instead of assuming. Search the list by address before any tiles are ordered, and ask Eastleigh Borough Council when the entry leaves a doubt.
Eastleigh Borough Council holds the boundary, so it is the one to ask. The Bishopstoke conservation area sits near the middle of Eastleigh, which makes the question worth asking for any address on that side of town. Ordinary re-roofing is normally permitted development, conservation area or not, but an Article 4 direction can remove further rights, so put your own road to Eastleigh Borough Council ahead of booking, and the planning guide sets out the rest. The Bishopstoke conservation area is one of Eastleigh Borough Council's own, and that office can also say whether a direction reaches your road, so ask for its answer in writing.
It means the roof is holding water it should be shedding, and there are two possible reasons. Debris in the outlet is the simple one: clearing it solves the problem on the spot. If water still gathers after that, the slope across the surface has gone, and a new layer on top cannot restore it, so the covering is taken off and laid to a proper fall. Splits along the wall edge, which let water in sideways, are read during the same visit. Each point is photographed, so the reasoning can be checked.
Yes, if the metal is sound and only an edge or a few fixings have given way. MyJobQuote says correctly installed lead flashing can last for over 80 years, so sound lead is worth keeping and a local repair makes sense. Thin patches, or a split running along the length, change the answer: that stretch is renewed, with new fixings and repointing along its upper edge. Sealant smeared over the damage is not a repair, because it hides the fault without closing it. The photographs we take show which case you have, and the written findings say which stretch needs renewing.
Findings in plain English, and the photographs behind them, shot from the roof and the loft. One written total price covers the whole job and arrives once the survey is done; it also says whether the VAT and the scaffold sit inside that sum, which gives you a fair basis for comparing a second quote. If a repair will do, that is what is offered first; a replacement is put forward only when the roof needs one. Prices are good and fair. We leave the site clean, with the drive and garden swept of tile ends and dust.
You'll get one written total price.
Fill in what you like. It opens WhatsApp with your message ready to send.