Hips
Where a Valley Park roof slopes away at a corner and the tiles are cut to meet.
A cap that has shifted at the foot of a hip lets rain run in behind it.

Valley Park is a district of Test Valley in Hampshire, and the road to it runs 25.2 miles north-west; ridge lines, flat porch roofs and gutters are surveyed first, then one written total price follows.
10-year workmanship guarantee, in writing

Where a Valley Park roof slopes away at a corner and the tiles are cut to meet.
A cap that has shifted at the foot of a hip lets rain run in behind it.

Where a small flat roof sits over a Valley Park front door, joined to the wall above.
A lifted edge at that wall sends rain down inside the porch lining.

Where the gutters of a Valley Park house gather into a single pipe to the ground.
A cracked joint or a short pipe throws the water against the wall instead of the drain.

Ridge and hips make one long line of joints, each needing to hold.
Along the top of a hipped Valley Park house, the ridge and its hips form the longest run of joints on the whole roof. Each cap sits on a bed, each bed meets a cut tile, and the ends close against gable walls. Our survey walks that line looking for crumbling beds, caps that have crept sideways and open ends, then checks how every cap is actually held down. The lowest tile on each hip gets a close look as well, because it carries the whole line above it. Marley, a tile maker, notes that following BS 5534 isn't required by law, and says "the tensile strength of mortar alone could no longer be relied upon"; a ridge held by ageing mortar alone is written up in exactly that way. The dry ridge and verge page covers the mechanical alternative.
Valley Park lies in the Test Valley borough, so Test Valley Borough Council holds the planning side. Chilworth Old Village is the Test Valley Borough Council conservation area close to this neighbourhood, and a given address should be put to the council rather than guessed at. Article 4 directions can pull specified permitted development rights back across a defined area, and whether one reaches a Valley Park road is Test Valley Borough Council's to confirm. The planning guide for roof work carries the rules in full.
Close to the centre of Valley Park, Section of Roman Road 250yds (230m) Long Sw of Titlark Farm is a scheduled monument (National Heritage List entry 1001853). Under section 2 of the 1979 Act that protects ancient monuments, works to such a monument need authorisation, a matter for the monument alone. A house roof sits outside that, and at the survey we point out any address that stands close to a protected site, so nothing comes as a surprise later on.
Thin dark lines in a ridge bed, or a cap sitting slightly off true, are easy to miss from the pavement. We photograph both close up, follow the line to each gable end, and put the pictures into the written findings. You can then hold them against the view from your own garden and decide, with real evidence in front of you, which parts of the top line need work.
A tea-coloured stain widening on a ceiling under the highest line, or flakes of old bedding lying in the gutter.
A bed that has cracked, or a cap that has shifted on a hip, letting rain slip behind the tile and into the loft.

A pool that lingers after rain means the fall has been lost or an outlet is choked, and each calls for different work. We clear and inspect the outlet, read the shape of the surface, and tell you which one it is, with reasons.
Valley Park houses with a flat porch, garage or extension roof get the surface read after rain, because standing water has two likely sources: a fall that has failed, or leaves blocking an outlet. BS 6229:2025 sets a minimum finished fall of 1:80 for membrane flat roofs, so a relaid roof is drawn steeper than the minimum, with site tolerances in mind. Next to that we look at the upstand, the strip where the covering climbs a wall, then at the seams and at the outlet itself, pressing the surface underfoot for any soft board that would show the deck below has taken in water. A repair suits a local fault in a covering whose deck is sound; a relay suits a roof whose fall has failed across its whole area, and the findings state which applies. Our flat roofing page sets out both.
Gutters follow. Brett Martin advises, for guttering, a downward fall of 1 mm for every 600 mm; a sagging run is measured against that figure, not eyeballed. Joints, brackets and the downpipe are examined, and the fascia board behind gets a firm thumb-press for softness. A dripping joint over a wall can imitate a roof leak from inside the house, so the gutter is read before a single tile is lifted. Guttering, soffits and fascias come inside the same written total.
Valley Park's mapped centre sits in Flood Zone 3, according to the Environment Agency. That describes the map, not a roofing rule, and our roof survey follows the same steps whatever the zone. The part that bears on a house is the last metre of the downpipe: pipes that discharge against brickwork, or into a blocked drain, put rain back at the foundations. We walk every pipe down to its mouth and report what happens there.
Rain that leaves the roof still has somewhere to land.
The job is not finished when rain leaves the gutter. Each downpipe is followed to where it lands: drain, soakaway or open ground. A missing length, or a cracked shoe at the base, can spoil a sound roof repair, so any such fault appears in the findings in plain words, with a photograph set beside the roof notes for the same house.
Map of Valley Park and the places around it, with the dashed line of our 30-mile service area from Havant. The same places are listed below the map.
Joints are where a roof lets rain in, and the highest line has the most of them: beds, caps and the tile cuts beside each hip. When one cracks, water can travel under the tiles and show up lower down, in a loft corner away from the source. So the survey goes along the roof first and then into the loft with a torch, pairing any dark timber with the line overhead. How each cap is held down is recorded too, since old bedding can look sound from a distance. The findings then separate a repair from a re-bed, with pictures of the cracked bed and the loft timber set next to each other.
Two measures decide it. The Planning Portal's guide treats re-roofing as normally free of a building regulations application while under 25 per cent of the building envelope and under 50 per cent of the roof changes, but one that weighs 15 per cent or more beyond the existing covering always needs approval. Before a Valley Park job begins, we ask your building control body which route fits, then translate the reply into ordinary language for you. The call is yours to make; if you would like the answer in writing for your own file, say so and we will ask for it.
A licence under section 169 of the Highways Act 1980 is needed before scaffolding obstructs a Valley Park pavement or road, and for Valley Park the licence comes from Hampshire County Council. Hampshire County Council's page states: "Scaffolding companies must apply on behalf of their customers." The fee is £211.90 on application for the first 2 weeks and £72 for each additional 2-week period. Before a licence can begin, ten clear working days must go by. No extension is offered, so a longer stay needs a new application. We arrange it with our scaffolder, with dates fixed with you beforehand.
Section of Roman Road 250yds (230m) Long Sw of Titlark Farm is a scheduled monument near the centre of Valley Park, National Heritage List entry 1001853. Works to a scheduled monument need authorisation under section 2 of the 1979 Act that protects ancient monuments, and that consent is about the monument itself. If your own house is listed, the position differs: anything affecting its character needs listed building consent, so read your entry before work is booked and ask the council if its wording leaves you unsure. We check at the survey which case applies.
Test Valley Borough Council holds Chilworth Old Village, the conservation area close to Valley Park. Whether a given Valley Park address falls inside a boundary, or under an Article 4 direction, is for Test Valley Borough Council to say, so put your street to it. Permitted development normally still covers a straightforward re-roof inside a conservation area, whereas dormers lose it, and an Article 4 direction can take further rights away; for that reason we check with the council first, and our survey notes can record its reply. No assumptions are made about your address before the council has replied. Our planning guide covers the rules in full.
It does not. Flood Zone 3 is the Environment Agency's flood-map label for the mapped centre of Valley Park, and that tells you about the map without giving any roofing rule of any kind. Repairs follow what the survey finds: covering, flashings, gutters and the timber beneath them. Water becomes our concern at the foot of the downpipe, since rain thrown against brickwork aggravates damp that the roof never caused, so we note where each pipe discharges, which keeps the work tied to the roof and the drainage it serves. For flood risk or flood cover at your address, your insurer and the Environment Agency's map are the places to ask.
A patch works when the boards beneath are sound and the damage is local: a split running along the wall edge, or a seam that has lifted. We test the surface for soft spots, study the outlet and measure the fall, since a roof that ponds because its slope has gone will not be rescued by a patch. BS 6229:2025 sets the 1:80 minimum for finished falls on membrane roofs. Each finding comes with a photograph and a one-line verdict, and a repair is what we propose first where one will hold. If the deck turns out to be soft, the findings say so before any price is written.
A single total figure, written after somebody has stood on the roof, with the survey notes alongside. The document should say whether VAT is counted and whether scaffold is counted, and how hidden damage found under the old covering would be handled. If a rival figure leaves either out, request that detail in writing before comparing the two. Ours is one written total following the survey, plus a plain statement on repair against replacement and the reasons, with a repair proposed first when one will hold. We keep to prices that are good and fair; the number arrives only after the survey, never before it.
You'll get one written total price.
Fill in what you like. It opens WhatsApp with your message ready to send.