023 9396 0313 Get a written quote
A street of hipped bungalows below a green hill

Roofers in Fair Oak

Fair Oak is 21.9 road miles north-west of Havant; eaves boards and the valleys between slopes are read first, with the findings written up before any price.

10-year workmanship guarantee, in writing

  • PlanningEastleigh Borough Council
  • Building controlEastleigh Borough Council's building control, delivered in partnership with Southampton City Council
  • Scaffold licenceHampshire County Council

Where rain gets into roofs in Fair Oak

A gutter full of leaves, moss and a broken tile after a storm

Soffits

Where the roof overhangs a Fair Oak wall and a flat board closes the gap beneath.

A board gone soft from a leaking gutter above lets birds and damp into the eaves.

Moss and weeds growing in a gutter under tiled eaves

Fascias

Where a long board is fixed at the bottom edge of the roof and carries the gutter.

Rot in that board loosens the brackets, and the gutter tips its water against the wall.

A small lead-covered bay window roof with wood-cored rolls on a Victorian house

Valleys

Where two Fair Oak slopes fold into a crease and a single lining takes the run-off of both.

A thin or split lining there sends water sideways beneath the tiles on either side.

A blocked uPVC gutter overflowing with rainwater after a storm
Fascia, soffit and gutter running along a house eaves

The gutter hangs from a board, and a soft board cannot hold it up.

SoffitsFair Oak soffits, fascias and gutters along the eaves

The eaves are where a roof ends and the wall begins. Beneath the lowest tiles sits a fascia board that carries the gutter, and under the overhang a soffit board closes the gap to the wall. Timber boards are pressed with a screwdriver tip for soft patches; where they are made of another material we read the joints, the fixings and any warping instead. We also look for places where a soffit has pulled away from the brick, and read stains that run down from the joints of the gutter above. Brett Martin gives the fall for guttering as 1 mm for every 600 mm towards the outlet, so each run is checked with a level for sags between brackets. Our gutters, soffits and fascias page describes what a renewal involves, board by board.

The Old George Public House is listed at Grade II, and listed building consent under section 7 of the 1990 Act covers alterations that change a listed building's special character. Bishopstoke, a conservation area not far from Fair Oak, is Eastleigh Borough Council's, and the council can tell you whether a given address or road is affected by it. Check any specific address with Eastleigh Borough Council, and ask in the same call about an Article 4 direction on your road, since the answer belongs to the council and not to us.

Our planning guide for roof work holds the national rules and this page does not restate them. Where a council answer arrives, it goes into the survey notes in plain words, next to the pictures of the eaves, so that a board is never replaced on an assumption and the work for a protected building is never priced before its consent route is known.

Under the overhang

Fascia
soft timber under paint
Soffit
sag, gaps and staining
Gutter
fall between the brackets
Joints
drips and open seams

Boards behind the gutter

Behind every gutter is a board that takes the drips when a joint fails. We lift nothing at first; we press, look and photograph, then pull a short length of gutter back only where a board feels soft. A section that has gone is cut out and replaced, and a board that is sound under old paint is left alone. The findings show each board, with its position along the eaves.

Where it shows

A dark streak below the gutter, or a soffit board that sags and leaves a gap at the brick.

Where it gets in

A gutter joint that drips onto the fascia, soaking the timber behind it until it softens and lets the bracket pull free.

Split old lead flashing pulling away from a brick abutment
Lined valley between two tiled slopes

Can a valley lining be mended in one spot?

Sometimes, where the metal is sound along the rest of its run and the fault is a single split. Where it has thinned along its length, renewing the whole lining is the lasting repair, and we say which applies.

ValleysFair Oak valleys, linings and the tile cuts beside them

A valley is the crease where two slopes meet, and its lining carries the rain of both. At survey we clear leaves and moss out of the crease, then read the lining for splits and thinned metal, and the tile cuts on either flank for gaps. The loft behind the valley is read from inside as well, so the timber on both sides of the crease is seen from beneath. MyJobQuote says correctly installed lead flashing can last for over 80 years. That figure is for flashing, not a valley, so of a failed lining we simply ask how it was fixed and what it is lying on. Our leadwork page describes valley linings, and our roof repairs page the mend that follows from a survey.

Where a lining has thinned along its length, it is renewed from end to end and not patched in the middle; a single split in otherwise sound metal can be mended where it lies. Where only debris is the trouble, we clear the crease and report a lining in good order, with a picture, and nothing more is proposed. A mark near the top of a bedroom wall is followed back along the valley, and the loft behind it is read for water stains on the timber.

If the findings end in a re-roof, approval is also needed where a new covering is 15 per cent or more heavier, and the Planning Portal treats a re-roof touching less than 25 per cent of the building envelope and less than 50 per cent of the roof as not normally needing a building regulations application. Eastleigh Borough Council's page says "Building Control is delivered through a partnership arrangement with Southampton City Council." We raise the question with building control before a date is fixed, and you receive its reply written out in plain words.

Where two slopes pour into one channel, the lining has twice the work.

Why the crease takes more

Two slopes drain into one crease, so a valley carries more water than any plain stretch beside it. Debris collects there and holds damp against the lining, which is why the clearing comes first and the judgement second. We photograph the lining before and after clearing, so you can see for yourself whether the metal is in good order or has thinned, and the thinned stretch, if there is one, is easy to find again.

In the crease

Lining
splits and thinned metal
Channel
leaves, moss and silt
Tile cuts
gaps along each flank
Loft side
tide marks on timber

Map of Fair Oak and the places around it, with the dashed line of our 30-mile service area from Havant. The same places are listed below the map.

Fair Oak eaves, valleys and the Old George

What does a Fair Oak survey look at along the eaves?

We press the fascia and soffit boards for soft patches, look for soffits that have pulled away from the wall, and read the stains running down from gutter joints. Each gutter run is checked with a level for a sag between brackets, and the hopper and the first metre of downpipe are looked at for leaves. The findings list each board and each length by its position along the eaves, with pictures, and say whether the work is a few replaced boards, a reset of brackets or a renewal of the whole run. Anything that cannot be reached is marked as not seen.

How should the fall of a gutter be checked on a Fair Oak house?

Brett Martin gives the fall for guttering as 1 mm for every 600 mm towards the outlet. A spirit level held along each length shows what is there, and water poured at the high end shows where it pools. A gutter that holds water is reset on its brackets before we suggest a new one, and a length that has split is replaced alone. The findings give each run its own short note, so you can see which part needs work, and a photograph of the level on each length is filed beside it, which makes a later comparison easy if the gutter is reset.

Does the roof of the Old George Public House need listed building consent?

The Old George Public House is listed at Grade II. Listed building consent under section 7 of the 1990 Act is the route for alterations to a listed building's character, and Eastleigh Borough Council is where to ask. Our planning guide holds the wider rules for a listed house. Should your own Fair Oak house be listed, look up its address on Historic England's list before ordering anything, and send us the entry, so the survey is written around it before any figure is given.

Does the Bishopstoke conservation area matter for a Fair Oak roof?

Bishopstoke is an Eastleigh Borough Council conservation area, and the council holds the answer for a particular address. Check any specific address with Eastleigh Borough Council, and ask whether an Article 4 direction applies to your road, because such a direction can remove further rights. The planning guide linked above has the national rules. We note the council's answer in the findings, and a Fair Oak house that lies outside any boundary still gets the same survey and the same written findings, with nothing left out because of where it stands.

What does a Fair Oak valley survey involve?

Leaves and moss are cleared from the crease first, so the lining can be seen. Then we read it for splits and thinned metal, look at the tile cuts on each flank for gaps, and go into the loft behind the valley to read the timber for tide marks. A mark near the top of a bedroom wall may lead back to the crease as well. The findings state whether the lining is sound, mended in one place or renewed from end to end, with a picture taken at each stage, and a short note on why that choice was made.

Does a Fair Oak re-roof need approval from building control?

Under the Planning Portal's guide, re-roofing does not normally need a building regulations application if it affects less than 25 per cent of the building envelope and less than 50 per cent of the roof; a new covering 15 per cent or more heavier needs approval separately. Eastleigh Borough Council's page says "Building Control is delivered through a partnership arrangement with Southampton City Council." We put your Fair Oak address to building control before the work is booked and relay the answer in everyday language, dated, so a written reply sits on file and nothing depends on memory.

Who licenses scaffold in a Fair Oak road, and at what price?

Section 169 of the Highways Act 1980 is the law behind a scaffold licence, and for Fair Oak the licensing body is Hampshire County Council, whose page says "Scaffolding companies must apply on behalf of their customers." Hampshire County Council charges £211.90 on application for the first 2 weeks and £72 for each additional 2-week period. We arrange it with our scaffolder; the application has to be in 10 clear working days before the start, and we agree the date with you first. Hampshire County Council offers no extensions, so the whole period of work is requested up front.

Does Flood Zone 3 land near Fair Oak change a roof survey?

Flood Zone 3 land lies near Fair Oak on the Environment Agency's flood map, which does not place any given Fair Oak house in the zone. A flood zone describes ground, not roof covering, so the survey follows its usual route from ridge to eaves to drain. If a lender or an insurer asks about flooding at your address, the roof findings stay separate from that question. We report only what we saw on the roof, with pictures, and the roof findings go on the same file as the valley and eaves pictures, so one set of notes tells the whole story in the order the water travels.

Where's the water showing?

You'll get one written total price.

Get a quote Call WhatsApp