023 9396 0313 Get a written quote
Weathered stone roof slabs hung on battens with timber pegs, a village behind

Roofers in West End

West End is 19.4 road miles west of Havant; ridges, hips and the loft space beneath a roof are read first, and the findings are written up before any price is put on the work.

10-year workmanship guarantee, in writing

  • PlanningEastleigh Borough Council
  • Building controlEastleigh Borough Council's building control, delivered in partnership with Southampton City Council
  • Scaffold licenceHampshire County Council

Where rain gets into roofs in West End

Edwardian brick villas with clay tile roofs and decorative ridges

Ridges

Where two West End slopes meet at the top and a line of cap tiles is bedded over the join.

Crumbled bedding or a shifted tile leaves that join open to the rain.

A low hipped bungalow with a grey concrete tile roof

Hips

Where a corner slopes from the top of a hipped roof to the gutter line below.

A loose tile along that angle uncovers the underlay that sits beneath it.

An interwar bungalow with a clay tile roof, a small dormer and an arched porch

Lofts

Where the underside of the roof is seen, between the rafters and the bedroom ceilings.

Dark timber, torn underlay or daylight at the eaves shows where the outside has failed.

A high view looking down on a clay tile roof, its ridge, hips and brick chimney
Ridge and hip capping tiles along a roof's top edge

The highest tile on the house still has to be held on by something.

RidgesWest End ridges, hips and the Church of St James

The ridge is the topmost line, where one slope meets the other, and each hip is a sloping corner running down from it to the gutter line. Capping tiles cover both, and they sit at the highest point of the roof, so a survey looks along the line for dips before it looks at any single tile. We then check each capping tile for cracks and movement, and look at what holds it down: bedding mortar, or mechanical fixings. Our dry ridge and verge page describes dry-fixed systems. Marley says BS 5534 requires mechanically fixed ridge and hip tiles, and BS 8612:2018 is the specification for dry-fixed ridge, hip and verge systems, which is a different thing from bedding on mortar. The wider re-cover is covered on our pitched roofing page, with the order of work set out from stripping to the last tile.

Listed at Grade II, the Church of St James is used for Church of England worship, which puts works to its roof under the faculty system of the Church of England and not under listed building consent from the council. A house on the list is different: listed building consent under section 7 of the 1990 Act is the route for alterations that change how the house reads as a building of special interest. Historic England's list is the place to look up an address.

The Orchards Way, West End conservation area is Eastleigh Borough Council's, and the council can say if a given house falls within its boundary. A direction under Article 4 can take away more rights, so ask Eastleigh Borough Council whether one applies to you. Our planning guide for roof work sets out the national rules in one place, and we leave them out of this page. The council's answer is copied into your survey notes before any price is written.

Along the apex

Capping
cracks and movement
Bedding
mortar crumbling or missing
Fixings
clips or screws present
Hip ends
the last tile at each foot

Sighting along the line

Standing back from the house shows what a close look cannot. A ridge that dips, a hip with a row of tiles out of true or a gap at an end tile can be seen from the road with binoculars, then confirmed on the roof. We photograph each fault along the line and mark it in the findings, so a loose tile near the chimney and a failed bedding run at the far gable are not treated as one job.

Where it shows

A strip of daylight under a capping tile, or a stain on the ceiling directly below the line of the ridge.

Where it gets in

Bedding mortar that has crumbled, or a ridge tile that has shifted so the join beneath it stands open to rain.

A chalet bungalow with a wide front dormer and a concrete tile roof
Rafters, underlay and battens seen from inside a loft

How can a loft show a fault in the slope?

Tide marks on timber, light through the covering, torn underlay and wet insulation each show where the outside has failed. We trace them uphill to the point where water enters, then say what that spot needs.

LoftsReading the roof from a West End loft

A loft is the roof seen from underneath, and it reveals things the slope hides. Torch in hand, we look along the rafters for dark patches and tide marks, read the underlay between the battens for tears and sagging, and look at the eaves, where the air path into the roof begins. For a cold roof, Marley's ventilation figures assume a high-resistance underlay: 25 mm along the eaves at pitches of 15° or less and 10 mm at steeper ones. Marley also says such an underlay is not vapour-permeable, which is why the eaves are read as part of the survey. Our roof inspections page explains what a survey records, and what follows from it is written up in the findings.

A mark on a ceiling does not name its own cause. For that reason the survey compares the loft side with the room side, and puts both readings in the findings, with pictures of the timber, the underlay and the plaster. If the fault turns out to sit well up the slope from where the stain shows, the repair goes there, and the ceiling below is left to dry and be redecorated afterwards. A loft with nothing wrong in it is reported as exactly that, with the pictures to show it.

Where the survey ends in a re-cover, approval is also required where you "use a new covering material which increases the weight of the roof covering by 15 per cent or more", and separately the Planning Portal normally puts a re-roof outside building regulations applications when it touches less than 25 per cent of the building envelope and less than 50 per cent of the roof. Eastleigh Borough Council's page says "Building Control is delivered through a partnership arrangement with Southampton City Council." Building control gets the question from us ahead of the booking, and you get its reply in plain words.

A ceiling stain is only the place where the trail ends.

Two sides of the ceiling

The same stain can be read from the room and from the loft, and the two readings are set side by side. Wet timber above the mark, a tear in the underlay overhead or a dry loft with a damp room below each lead somewhere different. Pictures from the room and the loft sit together in the findings, so the repair goes to what was found while every undamaged part of the slope is left as it is.

Inside the loft

Rafters
dark patches and tide marks
Underlay
tears and sagging
Eaves
the air path at the edge
Insulation
damp or flattened patches

Map of West End and the places around it, with the dashed line of our 30-mile service area from Havant. The same places are listed below the map.

West End ridges, lofts and the Church of St James

What does a West End ridge and hip survey look at?

We run an eye along the roofline and down every hip for dips and tiles out of line, then check each capping tile for cracks and movement. After that we look at what holds the tiles down: bedding mortar that has crumbled, or mechanical fixings that are missing or slack. The foot of each hip gets its own look, because a loose end tile can be seen from the ground but cannot be judged from there. Each fault is listed by its place along the line, with a photograph, and the outcome is a re-bed of a few tiles or a re-fix of the entire run.

Does ridge tiling in West End need mechanical fixing?

Where BS 5534 is followed, yes: Marley says the standard asks for ridge and hip tiles that are fixed by clips or screws, with BS 8612:2018 the specification for dry-fixed work. Marley's dry-fix guide adds that the tensile strength of mortar alone "could no longer be relied upon", and BS 5534 is a code of practice, not law. On a West End survey we note how each ridge run is held today, and where the old method has failed we recommend a fixing that matches the standard. The quote then names the method in words you can follow.

Does the Church of St James need the council's listed building consent?

The Church of St James holds a Grade II listing and is used for Church of England worship. While the building is in use, the Church of England is exempt from the council's listed building consent and relies on its own faculty system for roof works. Private houses on the list are not exempt: alterations to their character call for listed building consent from Eastleigh Borough Council. Look up the address on Historic England's list first, then forward the entry to us and the survey notes will follow it.

What does the Orchards Way conservation area mean for roof work?

Eastleigh Borough Council holds the Orchards Way, West End conservation area and can say whether your house falls within its boundary. Re-covering your own house is normally permitted development in a conservation area as elsewhere, though dormers are not, and an Article 4 direction can take away more rights, so ask Eastleigh Borough Council first. Read the planning guide linked above for the national rules. If the council tells you anything about your road, pass it on and it goes into the survey findings, beside the roof pictures, in plain words.

Is a West End re-roof a building control matter?

It can be. The Planning Portal's test sets two measures, less than 25 per cent of the building envelope and less than 50 per cent of the roof, inside which no application is normally required, and a covering 15 per cent or more heavier needs approval. Eastleigh Borough Council's page says "Building Control is delivered through a partnership arrangement with Southampton City Council." For West End addresses we raise the route with building control at the start, and hand you the answer in ordinary language before any date is set.

West End scaffolding: who applies, what is the fee, how much notice?

Scaffolding on a West End road or pavement needs a licence from Hampshire County Council under section 169 of the Highways Act 1980, and its page says "Scaffolding companies must apply on behalf of their customers." Its fee is £211.90 on application for the first 2 weeks and £72 for each additional 2-week period, and it asks for 10 clear working days between applying and the start. We arrange it with our scaffolder. Because Hampshire County Council does not offer extensions, we request the complete period in the first application, so a long job is covered from day one.

Which signs in a West End loft point to a roof fault?

A loft shows the roof from beneath: dark patches and tide marks on the rafters, light where the covering has opened, tears and sagging in the underlay, and damp or flattened insulation. Each of those points back up the slope to a place where water entered, and we follow the trail until we reach it. Marley says a high-resistance underlay is not vapour-permeable, so the eaves are looked at too. The loft pictures go into the findings next to the roof pictures, so you can read both for yourself.

What should a West End roofing quote make clear?

Before the total, check whether VAT and scaffold are in it. Ours is one written total price, drawn up on the strength of a roof visit and its photographs, with an everyday-language findings note and pictures attached to the figure. Where the covering is sound the advice starts with a mend, and a re-cover enters the picture only if the survey demands it. Should another quote say nothing on scaffold or VAT, treat that silence as a question and get the answer on paper. The written total is the one you agree, and nothing is added to it afterwards without your say.

Where's the water showing?

You'll get one written total price.

Get a quote Call WhatsApp