023 9396 0313 Get a written quote
A street of hipped bungalows below a green hill

Roofers in Medstead

Medstead is 26 road miles north of Havant; gable ends, lean-to roofs and conservatory roofs there are read edge by edge, with one written total price to follow.

10-year workmanship guarantee, in writing

  • PlanningEast Hampshire District Council
  • Building controlEast Hampshire District Council's building control service
  • Scaffold licenceHampshire County Council

Where rain gets into roofs in Medstead

Grey dry verge units along the gable of a concrete tile roof

Gables

The triangular end wall under a pitched roof, finished by an edge that overhangs it.

Failing mortar or a loose board along that edge lets rain onto the wall top.

Moss and weeds growing in a gutter under tiled eaves

Lean-tos

The single-slope roof of a porch, outhouse or conservatory that leans on the main wall.

The line where it meets the house wall is the seam to check for staining.

A blocked uPVC gutter overflowing with rainwater after a storm

Eaves

The bottom of each slope, where tiles or slates project past the wall face.

A gutter that overflows there soaks the boards behind it and the brick under them.

New dry verge caps along the gable of a concrete tile roof
Verge tiles and boards at a gable end.

A gable edge faces the weather first, so the wall below it keeps the record.

GablesMedstead gable ends: the verge edge against the wall

Where a pitched roof runs out, the covering projects past the gable wall, and that projecting edge is the verge. Rain driven along the slope reaches it first, so on a Medstead survey we study the last row of tiles or slates for movement, the bedding beneath them for cracks and gaps, and the board that follows the edge for open joints and soft timber. A dark streak down the brickwork below the verge is a strong hint, and the loft completes the picture: the end rafter and the top of the wall carry tide marks if water has been getting in. Where mortar bedding has run its course, a dry-fixed system is one answer, and our dry ridge and verge page describes how it works.

With the village centre outside the South Downs National Park, planning here falls to East Hampshire District Council, and the National Heritage List has several entries in Medstead. Services still take place in the Grade II Church of St Andrew, a Church of England church, so its roof works are a faculty matter under the Church of England's own system, not one for listed building consent. The War Memorial South East of the Church of St Andrew is Grade II too, and Medstead Camp in Grounds of Manor House is a scheduled monument, where unauthorised works are an offence under section 2 of the 1979 Act.

Upper Wield is the conservation area we can place nearest to Medstead, and East Hampshire District Council settles the position for your own address. For your own road only the council can say whether an Article 4 direction applies, so ask it before booking, and keep the written answer with your job papers for later. The planning guide for roof work covers the rules.

At the gable

Edge tiles
movement and gaps
Bedding
cracks and voids
End board
open joints, soft timber
Wall top
damp below the verge

Edge first, wall second

The verge is the first thing driven rain meets, so it can show wear before the middle of the slope does, which is why we start there. A hairline crack in the bedding looks the same whether it opened last week or years ago, and the wall below tells the true story. We read the brick and the loft side of the end wall, and photograph both.

Where it shows

A dark streak below the roof edge on the gable wall, flaking paint on the end board, or a damp corner upstairs.

Where it gets in

Bedding that has dropped away under the last tiles, one edge tile that has shifted, or an open joint in the board.

A conservatory with a mossy glass roof
A lean-to conservatory roof meeting a house wall.

Does a new solid conservatory roof need approval?

The Planning Portal says a new solid roof must comply with building regulations. Ask East Hampshire District Council's building control service before the work is planned, since the answer can depend on how the room is separated from the house and heated.

Lean-tosMedstead lean-to and conservatory roofs, wall joint to gutter

A porch, an outhouse or a conservatory can be roofed with a single slope that leans on the main wall, and the seam where the two meet is the part to check. We look at the flashing there for gaps and lifted edges, at the wall above for crumbling joints, and at the surface for the leaves and grit that gather against the wall. Rain slipping behind a lifted flashing can appear indoors well below the join, which is why a stain on a ceiling is traced back to the wall line before anyone names the cause. Our conservatory roofs page covers glazed and solid options, and what a replacement involves.

The Planning Portal says a new solid roof "must comply with building regulations", so we ask building control before a glazed conservatory roof is swapped for a solid one. A ground-level conservatory up to 30 m² with Part K glazing is exempt from the energy rules only while a wall, door or window still separates it from the house and the home's heating system is not extended into it. For a Medstead address the contact is East Hampshire District Council's building control service, on 01730 234207 for application process queries and inspections.

At the lower edge, the gutter takes whatever the roof sheds. We check each joint, the brackets and the fall, then follow the downpipe to its outlet at ground level, since a stain on the wall beneath can pass for a fault in the roof itself. Gutters, soffits and fascias explains renewal, though a clean and a refix are sometimes all a run needs. Anything we take off a roof goes with us, and the lawn and the path are left clear when the visit ends.

The seam against the house wall carries the whole risk of a lean-to.

Glass, panel or tile

A lean-to can be glazed, panelled or tiled, and each covering fails in its own way. Glass gives up at its seals and bars, a panel at its joints and edges, and a tiled slope at the tiles and the wall flashing. We name the covering we found, say where it lets water in, and put the finding in writing, so a repair is not mistaken for a replacement, and a small fault is not sold as a large one.

Along the wall

Flashing
gaps and lifted edges
Seals
bars, panels and joints
Gutter
fall, joints and brackets

Map of Medstead and the places around it, with the dashed line of our 30-mile service area from Havant. The same places are listed below the map.

Medstead gables, lean-tos and listed neighbours

How does a Medstead gable end show where water is getting in?

Three things carry the evidence: the verge tiles, the board running along them and the wall top beneath. A dark streak under the edge points one way, a soft board another and crumbled bedding a third. Up in the loft we check the last rafter and the timber along the wall top for tide marks, then say whether the edge should be rebedded, refixed with a dry system or left alone, and which of those the evidence supports. A loose edge tile and a failed bedding line are different faults. Photographs from outside and inside go with the finding, so you can match the reasoning to what you see on the roof.

Must a Medstead re-roof be reported to building control?

Medstead re-roofs fall under the Planning Portal's two measures: work affecting less than 25 per cent of the building envelope and less than 50 per cent of the roof means no building regulations application in the normal run. You do need approval whenever the new covering increases the roof covering's weight by 15 per cent or more. East Hampshire District Council's building control service answers application process queries and takes inspection bookings on 01730 234207. The job goes to that service before a start is booked, and a structural check is advised for any heavier covering, with its advice relayed to you in plain words.

Is a licence needed for scaffold on a Medstead lane, and who applies?

Scaffolding that overhangs the verge or footway does need one. Hampshire County Council runs the highways here, and its page states "Scaffolding companies must apply on behalf of their customers." Hampshire County Council charges £211.90 on application for the first 2 weeks and £72 for each additional 2-week period, and the licence must be applied for ten clear working days prior to the first pole. We arrange it with our scaffolder. A narrow lane may need more thought about where the poles stand, so that is raised at the survey and the plan agreed with you, and the first day on site is fixed only when the licence dates are known.

Is the council's consent needed for the roof of the Church of St Andrew?

Not in the ordinary way. Church of England churches in use for worship come under the faculty system, and the Church of St Andrew, Grade II, is one of them, so the council's listed building consent does not apply to works to the church itself. That arrangement belongs to the building while services continue. A listed private house is different, because its owner goes to the council, so search Historic England's list for your own address before a roofer is booked, and mention any entry you find when you ask us to visit, so the consent route is written into the findings from the start.

What do the listed war memorial and the scheduled camp mean for my roof?

Nothing, because a listing covers one address and your house is a different one, unless it carries a listing in its own right. The War Memorial South East of the Church of St Andrew is Grade II. Medstead Camp in Grounds of Manor House is a scheduled monument, and works to it need scheduled monument consent. Neither reaches the houses around them, so neither is a reason to delay a re-roof next door. Your own address is still worth a search on Historic England's list, since a quick look beats discovering an entry after the scaffold has gone up.

Upper Wield is the nearest conservation area: does it reach my Medstead house?

Treat Upper Wield as a pointer and no more. Only East Hampshire District Council can place your address inside a conservation area or outside one, and its own list is the one to trust. A plain re-cover is normally permitted development even in a conservation area, but an Article 4 direction can remove more rights, and the first call we make is to the council, which is who to ask for the truth about your road, in writing if you can, and before any date is set.

What should I check before swapping a Medstead conservatory roof for a solid one?

Ask building control first. On the Planning Portal's wording, a new solid conservatory roof "must comply with building regulations". A ground-level conservatory of up to 30 m² with Part K glazing is exempt from the energy rules only while a wall, door or window still separates it from the house and the home's heating system is not extended into it. East Hampshire District Council's building control service is the body to ask, and we put the question during the survey, which settles the route before a price is written and puts its reply in your copy of the findings.

What goes into a complete roofing quote for a Medstead house?

Look for three lines: the covering and the work to it, a statement on VAT and scaffold, and the findings behind the figure. Ours reaches you as one written total price once we have looked at the roof and walked the gutters. If the roof only needs a repair, that is what we price, and prices follow the work, and they are good and fair. Another firm's quote that is silent on scaffold or VAT is worth sending back with a request that both be written in, so the totals can be compared on the same footing.

Where's the water showing?

You'll get one written total price.

Get a quote Call WhatsApp