
Hips
Where two slopes meet at a corner and the hip tiles are bedded along the join.
A loose hip tile leaves that join open to rain driven across the slope.

Roof repairs and re-roofs for Fratton homes and buildings, with the cause of the leak found first and one written total price after the survey.
10-year workmanship guarantee, in writing

Where two slopes meet at a corner and the hip tiles are bedded along the join.
A loose hip tile leaves that join open to rain driven across the slope.

At the point where two slopes drain into one sunken channel above the eaves.
A worn lining in the valley lets the flow slip under the tiles on both sides.

Where the roof ends at a gable and the final tiles meet the wall.
Crumbled pointing there gives the wind a way in under the edge tiles.

Follow the water uphill from the stain, because the break sits higher than the mark.
Our Fratton survey starts at the highest point and follows the rain downhill. On the ladder we sight along the ridge, where the two main slopes meet, and along each hip, the angled line at the corner of a hipped roof, looking for slipped, cracked or lifted tiles and for bedding or dry fixings that have given way. The verge, the exposed edge at a gable, comes next. After that, from the loft hatch and wherever we can get to them, the underlay and the timbers are inspected. Any tile that sounds hollow when tapped is noted, since loose bedding can look sound from the ground. A roof repair belongs at the point of entry, which can lie some distance from the stain.
Three conservation areas lie close to the middle of Fratton: Essex Road; St Mary's Churchyard, Fratton; and St David's Road, Southsea. Portsmouth City Council handles planning for each. Re-covering a house normally stays inside permitted development, conservation area or not, yet an Article 4 direction may strip additional permitted development rights from a street. The council has made them for numbered addresses in Essex Road, and in St David's Road, St Andrew's Road and Margate Road, so ask Portsmouth City Council about your own address before a covering is ordered. Our planning guide for roof work sets out the detail, and this page defers to it.
Listing works separately. Historic England's list carries Church of St Mary, Kingston at Grade II*, and both The Guardsman Former Public House and Carnegie Library at Grade II. Under section 7 of the 1990 Listed Buildings Act, work that changes a listed building's character needs listed building consent, and permitted development rights for roof work stay in place beside that. If your house has an entry, mention it when you book and we will plan the survey around it.
Two of the Grade II entries in Fratton are a former public house and a library, which shows that listing follows the building, not the use it was put to. The same section 7 test applies to any of them, and the entry on Historic England's National Heritage List is the first thing to read. Search by address and look at what the entry describes. If your roof is on the list, tell us when you book the survey.
A brown ring spreading across a landing ceiling, or paint lifting on the wall just below the eaves.
A hip tile bedded loose, or a gap at the verge, where rain blown across the slope slips under the edge.

Either leaves and silt have narrowed the outlet at its base, or the downpipe below is blocked or cracked and cannot take the flow. We clear it and check the joints, because a hopper that keeps overflowing is pointing at a fault further down.
After the slopes comes the gutter line. We run along it checking for open joints, brackets that no longer hold the fall, and any length that stands full instead of draining. Each downpipe is traced from its hopper, the small box that catches the gutter's flow at the top, to the shoe at ground level, joint by joint and through every kink. The fascia, the board the gutter hangs from, and the soffit, the panel under the overhang, get a prod for softness, because a gutter that has overflowed for a long time marks them. Sometimes the answer for gutters, soffits and fascias is a clean-out and nothing more, and the report states that outright.
At the back, an extension or garage with a flat roof has its own route for the rain. At the back, the covering rises up the wall as an upstand, the short vertical turn-up where roof meets masonry, so we study that edge, the seams and the outlet. We test the surface for standing water and look for splits where covering meets wall. A small outlet on a garage roof gets the same attention as a large one on an extension. Whether the roof wants patching or a new covering is then explained, alongside the flat roofing options open to you.
The report follows the order of the water, ridge to drain, with a photograph at each fault, so you can read the roof the way we did. Nothing is left as a vague note about general wear. When a slope has reached the end of its life, we explain why before any price is mentioned. Your gutters and pipes are looked at again once the main work is complete, and the job ends with the scaffold gone and the ground swept clean.
At the foot of the downpipe the roof hands the rain on.
A downpipe that leaks at a joint wets the brickwork behind it, and a damp patch indoors on that wall can look like a roof fault when it is a pipe fault. We run a hand down the pipe, watch the joints in a heavy flow where we can, and check the shoe, so that you pay to close the right thing. The same care applies to a rear gutter that you cannot see from the street.
A ceiling stain only shows where the water ended up, so we start there and then climb. In the loft, where it can be reached, the underlay and the timbers above the mark are inspected for damp. Outdoors we trace the slope above it from the ridge, since water slides along a batten or rafter before dripping, which puts the break uphill. When the entry point is clear, you are told whether a repair closes it or the roof has gone beyond that, and the reasons come in writing. A sound roof is reported as sound, and you pay only for the work the survey called for.
Planning Portal guidance is that no building regulations application is normally needed for a re-roof provided it affects less than 25 per cent of the building envelope and less than 50 per cent of the roof. A new covering 15 per cent or more heavier does need approval. Portsmouth's service sits with the Building Control Partnership, whose Business Support team is on 01329 824823. Before work begins on a Fratton address we confirm which side of those thresholds the job falls, and a structural check comes first wherever the new covering is heavier.
Scaffolding over a Fratton pavement or road has to have a licence or permit. We arrange the licence with our scaffolder, so you never fill in a form or make a call yourself. For Portsmouth, the hoarding and scaffolding permit is handled through Colas, and its form shows £100.00 + VAT per month, which is part of what we plan with you. Raising it at the survey matters, because a frame over a pavement outside a Fratton house must be agreed before a start date can be promised. That keeps the date realistic, and the neighbours know to expect the frame.
Listed status concerns the whole building, not just the roof, so the first step is to find the entry. Historic England's list shows whether an address is on it, and Fratton has Church of St Mary, Kingston at Grade II*, with The Guardsman Former Public House and Carnegie Library at Grade II. Work that touches a listed building's character needs listed building consent under section 7 of the 1990 Act, while permitted development rights for roof work remain. If your house is listed, tell us when you book and the survey is planned with that in mind, tile by tile where needed.
Essex Road; St Mary's Churchyard, Fratton; and St David's Road, Southsea are the conservation areas close to the centre, and Portsmouth City Council is who to ask. A new covering on a house inside one normally stays within permitted development, but Article 4 directions can strip further rights from particular streets. Portsmouth City Council has made them for numbered addresses in Essex Road, St David's Road, St Andrew's Road and Margate Road, so phone it with your address before booking anything. Dormers and other changes are dealt with in our planning guide, which we go through with you when it applies to your house.
Rainwater leaves the roof edge into the gutter, drops through the hopper into the downpipe, and should end at a gully or drain clear of the wall. We follow all three stages at the survey and show you where each pipe finishes, with a photograph of the foot of the pipe where that helps. A pipe that discharges against brickwork, or into a gully that is blocked, is reported separately from the roof, so whoever looks after the drain can act on it. Any gutter repair we recommend sits inside the same single written total as the rest of the work.
One written total price reaches you after the survey, with the work described and the covering named. Check on every quote, ours included, if the figure takes in VAT and the scaffold. The figure is good and fair, and being single it leaves you no sums to do. Photographs of what we found come with it, so you can judge the job yourself, or put the paper in front of another roofer and ask for a second opinion. We would sooner you compared like with like than guessed, and the paper is written to make that easy to do.
When the fault sits in one defined place, for example a slipped hip tile, a worn valley lining or a split in a flat covering, and the rest is sound, repair comes first. Replacement is the answer when damage runs across a whole slope, when the battens or underlay beneath are failing, or when one repair would only be followed by another. You get the verdict in writing, with the evidence for it laid out beside the photographs, and the site is tidied away when the work is finished, with nothing left on the path or the drive for you to deal with.
You'll get one written total price.
Fill in what you like. It opens WhatsApp with your message ready to send.