Fitting time

How long does it take to fit a roof window?

The short answer

The time depends on the job, and the survey sets it, so no single number would be right for every roof. A swap into an opening that is already cut has less to do than a new opening, which means stripping back the covering, framing the hole and lining it from inside. Scaffold licence notice, the weather and the condition of the timbers can shift the start or the finish, and the quote should say what has been allowed.

How long a roof window job takes depends on what the opening needs and on what has to be arranged first. The survey sets it and the quote states it.

An interwar bungalow with a clay tile roof, a small dormer and an arched porch

What sets the length of a roof window job

The job is one of three kinds, and each has a different amount of work behind the glass.

Three kinds of roof window job and what each involves
JobWhat it involves
Swap, same openingOld frame out, new frame in, flashing and covering relaid, lining made good
New opening in a slopeCovering stripped back, rafters trimmed, frame fitted, flashing and covering relaid, room lined
Rooflight on a flat roofKerb built or checked, rooflight fitted, flat roof covering dressed up to it

What is found adds to that. Timber round an old frame that has gone soft has to be repaired before the new frame goes in, and the view from the loft tells us beforehand whether that is likely.

For a swap, our guide to replacing a Velux window sets out the sequence. A new opening follows the same sequence with extra stages in front of it: marking out, cutting the covering and underlay, and framing the hole.

A rooflight on a flat roof is a trade of its own, since the kerb and the roof covering round it set the pace.

What can move the start date

The first day depends on arrangements made beforehand.

  • The window is ordered to the measured size, so its arrival sets the earliest date.
  • Scaffolding put up on the highway needs a licence, and we arrange the licence with our scaffolder. Hampshire County Council needs ten clear working days' notice, and West Sussex County Council asks for at least 10 working days' notice.
  • The building regulations route is settled with building control before the order goes in. For a listed home, listed building consent comes first, and the council sets its own pace.
  • If you sign at home after our survey you have 14 days to cancel, and work starts sooner only if you ask in writing.

Portsmouth and Southampton addresses have licence processes of their own, and the quote names the start date it has been planned around. Whether scaffold is needed at all depends on the access, and it sits inside the written total.

A date that hangs on a licence is a date for the licence, so it helps to know that when you accept the quote.

How the work is run on the day

The opening is uncovered only while the work needs it, and the sequence is planned so that it is closed in again before we leave each day. We pick the day with the forecast in view.

  1. Floors and furniture below are protected, and the loft beside the opening is cleared.
  2. The covering and the old flashing round the frame are lifted, and sound tiles or slates are set aside.
  3. The old frame comes out, and the timbers and underlay round the opening are inspected.
  4. The new frame is fixed square, the flashing goes on and the covering is relaid.
  5. The opening is lined inside and the site is cleared.

What turns up at stage three can alter the plan. Damp timber or tired underlay is dealt with at that moment, since closing the roof over it would bury it, and the new frame goes in after you have seen a photograph.

Someone has to give access to the loft and to the room below. A new opening may also need plastering and decorating by another trade once we have gone, and the quote should say whether that is included.

What to ask the written quote to say

A quote that names its own timetable is easier to hold to than a promise made in conversation. Ask it to state these.

  • Whether the job is a swap or a new opening, and what that means for the number of working days.
  • The start the quote has been planned around, and what that depends on, such as a licence or the arrival of the window.
  • Whether VAT and scaffold are part of the sum.
  • Who makes good the ceiling lining and the decoration indoors.
  • What happens if rain stops the work on the day.

The quote is a single written figure for the whole job, set after the survey, and the timetable sits alongside it. Our guide to how much a Velux window costs goes further into what moves the total, and our roof windows and skylights page describes the service.

If the survey turns up something that changes the plan, such as soft timber, the new job is described to you in writing before the work goes ahead, with the effect on the timetable.

Related questions

Will my room be open to the weather while the window is fitted?

The opening is uncovered only while the old frame is out and the new one is being set, and the work is planned so that it is closed in again before we leave each day. The day is chosen with the forecast in view, and the quote should say what happens if rain stops work.

Does anyone need to be in while the window is fitted?

Someone needs to give access to the room below and to the loft beside the opening, because part of the work is done from indoors. Floors and furniture are protected first. Tell us before the date if the loft cannot be reached, so that the survey can plan for it.