Replacement time

How long does it take to replace a conservatory roof?

The short answer

A roofer can give a reliable time only once the roof has been inspected, because the duration turns on what is coming off, what the frame needs, and how the weather behaves while the roof is open. Swapping polycarbonate sheets and building a tiled solid roof are different jobs, so the time is agreed with the written price and is never guessed from a photograph.

The time a conservatory roof takes depends on what is on it now and what goes back. What decides how long it takes.

A brick house with a conservatory and a grey tiled roof

What decides the number of days

Several things decide how many days a conservatory roof takes, and the inspection is where each one is looked at:

  • The roof coming off: polycarbonate sheets, glass units or an older solid roof, and how each is fixed down.
  • The new covering: another polycarbonate or glass roof, or a tiled or lightweight solid build.
  • The frame and the walls, which are checked before anything new is laid on them.
  • The abutment against the house and the gutter, which are re-formed along with the roof.
  • The weather on the days the frame stands open.

A solid roof has more layers to build than a sheet roof, so it asks for more time in the plan. The frame can change the picture again, because timber or aluminium that needs work has to be sorted before any covering goes on top.

Access matters too. The route for materials, the space for a scaffold tower and the distance to the skip all change the day's work. Those points are seen at the visit, and they are part of why two roofs of the same size can take different lengths of time.

Weight, the frame and the order of work

Before a solid roof is priced, the frame has to be shown to carry it. The Planning Portal's re-roofing guidance covers the weight question, and on it the Portal says: "you are advised to check with a structural engineer or surveyor before commencing with works". That check comes first, so it sits ahead of the start date and not inside it.

Should that check show the frame needs strengthening, the plan changes before a single sheet comes off, and the date and the price are settled afterwards, on the true picture. A start date agreed before the check is a date that may have to move, which is why the check is asked for first.

Once the frame is confirmed, the work is staged so that the roof is not left open for longer than it has to be. Each stage is planned around the forecast for the days the frame stands exposed, and the plan is written down with the price.

The tiled or lightweight roof guide compares what each build involves, and the replacement cost guide shows how those choices reach the written figure.

Building control and the calendar

The Planning Portal states the duty in these words: "A new roof must comply with building regulations to ensure it is structurally safe, energy efficient and properly ventilated." For a solid roof that means a conversation with building control, and it is better started before the job than after the tiles are on. Leaving that conversation until the old roof is off can stretch a job.

We confirm the building regulations route with your building control body before work starts. Ask also when building control expects to see the work. An inspection is a visit that sits inside the timeline, and the roofer cannot carry it out alone.

Planning is a separate question and also belongs at the start. The planning permission guide explains the permitted development test for roof work, and the conservatory roof building regulations guide sets out the Portal's wording and the energy exemption in full. If either raises a doubt, resolve it before a start date is fixed.

A date that depends on a council reply is only as firm as that reply. Ask your roofer to say in writing which dates assume the answers are already in, and which of them move if building control or the council asks for more information.

What to ask for in writing

A time given by word of mouth is hard to hold anyone to. Ask for these to be written down beside the price:

  1. The expected start, and how many working days the job is planned to take.
  2. What happens to the schedule if the frame needs repair once the old roof is off.
  3. How the open roof is protected on any day the weather is in doubt.
  4. When building control will inspect, and who arranges the visit.

The price that follows an inspection is one written total, and the time is set out with it. Our conservatory roofs survey measures the roof and records its supporting structure and the abutment, so the plan rests on what is there rather than on an estimate made from the ground.

If the schedule slips for a reason nobody could have seen, ask to be told at once what has changed and what it does to the date and the price. A plan that was written down makes that conversation short.

Finally, ask what the room will be like while the work goes on. With the roof open or half-built the conservatory is not somewhere to leave furniture, electrics or anything that dislikes damp, and clearing it beforehand is a small job that saves a delay.

Related questions

Does the weather change how long the work takes?

It can, because an open roof has to be kept covered and some work waits for dry spells. The written plan after the survey says how the job is staged. Nobody can promise a dry week, so a straight answer allows for that and says what happens if rain interrupts the roof.

Should I ask about building control before I book?

Yes. According to the Planning Portal, a new roof must comply with building regulations, so a solid roof involves building control from the start. Ask your roofer how that is handled and when the inspection falls, so it is planned into the days of the job and does not surprise anyone.

Where's the water showing?

You'll get one written total price.

10-year workmanship guarantee, in writing

Get a quote Call WhatsApp