023 9396 0313 Get a written quote
Weathered stone roof slabs hung on battens with timber pegs, a village behind

Roofers in Hill Head

Hill Head, a district of Fareham, has its ridge tiles, hips and flat roof outlets read in that order, and the price in writing arrives only once the survey has been done.

10-year workmanship guarantee, in writing

  • PlanningFareham Borough Council
  • Building controlBuilding Control Partnership
  • Scaffold licenceHampshire County Council

Where rain gets into roofs in Hill Head

Cracked mortar under a ridge tile on a slate roof

Ridges

Where the tops of two slopes meet and a course of capping tiles covers the seam.

A tile that has shifted, or bedding gone brittle, lets weather into the loft.

A run of freshly re-bedded clay ridge tiles

Hips

Where slopes turn an outward corner and capping tiles step down towards the eaves.

A hip is held by its lowest tile, so one slipped end loosens the run above it.

Crumbling mortar beneath old half-round clay ridge tiles

Outlets

Where the water on a flat roof leaves through a gully or a short spout.

A choked outlet leaves a pool waiting on the deck, looking for a way in.

Edwardian brick villas with clay tile roofs and decorative ridges
Ridge and hip tiles on top of a tiled roof.

A ridge has to shed water and hold on, both at once.

RidgesHill Head ridges and hips, and what fixes them

At the crest of a pitched roof, ridge tiles close the join between two slopes, and hip tiles do the same down each outward corner. Their task is to shed water over the join and to stay exactly where they were put. Mortar bedding can crack and let go, while dry-fixed systems hold the tiles with clips and screws instead. Marley says BS 5534 requires mechanically fixed ridge and hip tiles, and BS 8612:2018 is the specification for dry-fixed ridge, hip and verge systems. From the ladder we look for cracked bedding, a tile that has crept along the line, and gaps where a hip meets the eaves. Our dry ridge and verge page explains how a mechanical fixing differs from mortar.

Hill Head is a coastal district, and Cupa, the slate maker, writes that "Buildings positioned on slopes, hills or coastal areas as well as tall buildings will be graded with higher exposure." For a roof here, each fixing is specified from a BS 5534 calculation for this particular site, instead of being copied from a stock detail drawn for some other house. Marley says installing to BS 5534 "isn't required by law", yet the standard sets out batten selection, methods of fixing and a means of calculating fixing specifications. So when we survey a ridge, we note what is holding each tile in place, and any re-fix is specified on that footing.

Hips get a second look at the bottom, where the last tile carries the pull of every tile above it. If an end tile has slipped, the line above can be loose without showing it. We press along the run, photograph each loose point, and say whether re-bedding, re-fixing or a new ridge system is the sensible repair. A full report from a roof inspection is another route if you want the whole roof read before you decide.

Across the apex

Ridge
bedding, clips and screws
Hips
lowest tile and run above
Joints
gaps between capping tiles

Top line, bottom end

A ridge can look straight from the road while the bedding under its tiles has crumbled. We check at the ridge itself, run a hand along the line to feel whether any tile moves, and look into the loft for daylight or powdery mortar on the timbers below. Each loose point is photographed for the notes, so you can see what the repair is for and choose between a re-bed and a dry-fixed replacement.

Where it shows

Light in the loft along the apex, or specks of mortar lying on the ceiling boards underneath.

Where it gets in

A capping tile that has shifted, or bedding that has cracked along the joint beneath it.

The worn felt roof and cheeks of a box dormer on a chalet bungalow
A flat roof with an outlet and turned-up edges.

Does a pool on my flat roof mean a leak?

Not by itself. A pool on a sound covering is not a leak, though it shows the fall has gone or the outlet is blocked. We clear the outlet, check the slope and look inside for staining, and a pool with a dry ceiling may only need the fall corrected.

OutletsHill Head flat roofs: outlets, upstands and the fall between

A flat roof is flat in name only. It is laid to a fall that carries water towards an outlet, and BS 6229:2025 sets a minimum finished fall of 1:80 for membrane flat roofs, so the roof is designed to a steeper fall to allow for tolerances. At survey we look for water still standing on a dry day, because ponding means a lost fall or a stopped outlet. Debris collects at the outlet before anywhere else: leaves, grit, a skin of moss. Our flat roofing page sets out the coverings we lay and how the fall is corrected.

The upstand is the turned-up edge of the covering where it meets a wall or a parapet, and it is the second place to look. A split, an edge that has lifted, or a break in the sealing strip lets water behind it and onto the timber below. Indoors, a brown ring on the ceiling under a flat roof may appear some distance from the fault, since water travels along the deck before it drops. We trace it back along the fall. The gutter or downpipe that receives the outflow is followed too, because a flat roof that drains well into a gutter that does not changes nothing for the ceiling underneath.

A new flat roof on an extension or a porch raises questions of its own, apart from the fall, and our planning guide for roof work is where the rules are set out. What we add from the roof is whether the existing deck is sound enough to keep, whether the fall can be corrected without lifting it, and what the new covering has to be fixed to. A written total price follows once those answers are in, and a repair to the existing covering goes first where the deck beneath it can take one.

A flat roof drains by its fall, and everything depends on that slope.

Pool or outlet

Standing water is a clue, not a verdict. A shallow pool after a dry day can mean a lost fall, a blocked gully or a sagging deck, and each calls for a different repair. We clear the outlet first, then watch where the water goes. Only then do we say whether the covering needs patching or relaying, or whether the fall is wrong and the deck must be reshaped before anything is laid on it.

At the roof edge

Outlet
gully, grate and spout
Upstand
turned edge and sealing strip
Fall
pooling after a dry day

Map of Hill Head and the places around it, with the dashed line of our 30-mile service area from Havant. The same places are listed below the map.

Hill Head ridges, flat roofs and the questions around them

Which parts of a Hill Head ridge or hip does a survey look at?

The capping tiles along the ridge and down each hip, whatever is holding them, and the lowest tile of each hip. We note whether the fixing is mortar bedding or a dry-fixed system, feel along the line for movement, and look into the loft for daylight or powdery mortar on the timbers underneath. Because Hill Head is coastal, new work gets a fixing specification calculated for its own site under BS 5534. You receive photographs of each loose point and an opinion on re-bedding, re-fixing or replacing the ridge system.

Does re-covering a Hill Head roof need Building Regulations approval?

Two measures and one weight decide it, all from the Planning Portal. The measures are less than 25 per cent of the building envelope and less than 50 per cent of the roof. Inside both, a building regulations application is not normally required, and separately, in the Planning Portal's words, a new covering that "increases the weight of the roof covering by 15 per cent or more" needs approval. Fareham addresses go to the Building Control Partnership (01329 824823), and we put your roof to it before work starts. You get its answer in everyday language, and the choice about how much to do stays with you.

Which council licenses a scaffold outside a Hill Head house?

Section 169 of the Highways Act 1980 requires a licence for scaffolding on a public highway, and in Hill Head the licensing body is Hampshire County Council. Hampshire County Council charges £211.90 on application for the first 2 weeks, then £72 for each additional 2-week period, and its page asks for "a minimum of ten clear working days" before the licence begins. Hampshire County Council's page states "Scaffolding companies must apply on behalf of their customers." No extensions are offered, so a single application has to span the whole job. We arrange it with our scaffolder, and you see the proposed dates before the form goes in.

Which conservation areas lie close to Hill Head?

Daedalus and Lee-on-the-Solent, both conservation areas of Gosport Borough Council, lie close to Hill Head. Fareham Borough Council can say whether your own Hill Head house falls inside any of its areas. Fareham Borough Council's Article 4 entries include one titled Alteration of the Coastguard Cottages (1-15 Crofton Lane), and since an Article 4 direction can remove further rights, the people to ask, before any roof work is booked, are at Fareham Borough Council. The rules themselves are set out in the planning guide we keep for roof work, and your address goes to the council before a price is set.

How does listing affect roof work on a Hill Head house?

Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 makes listed building consent necessary for works that would affect a building's special architectural or historic character. Historic England lists Smugglers Cottage (list entry 1351283) and Great Crabthorn (list entry 1338892), both Grade II, near Hill Head. Any other address can be searched on the list before you decide on a contractor. Listed homes keep permitted development for roof work, although anything reaching their character also needs consent, so ask Fareham Borough Council early.

Does Flood Zone 3 land near Hill Head change how a roof is surveyed?

Not at all. The Environment Agency flood map places Flood Zone 3 land near Hill Head. That is a statement about ground and water levels, with no bearing on how a slope, ridge or gutter is read, so the survey runs the same way whichever zone lies beneath the house. For a flood question about your own address, go to the Environment Agency's map, since a roofer cannot answer it from the slope. What we can say from the roof is where water gets in, and what closes it off.

How is a Hill Head flat roof outlet cleared and tested?

Debris is lifted out by hand first, which means leaves, grit and any moss that has built up round the grating, and it is bagged. The outlet is then checked for a cracked collar or a loose joint with the covering. Next we pour water onto the deck and watch it travel, noting where it stalls and where it reaches the outlet, since that shows whether the fall is true. The gutter or downpipe below is run through as well, so that water leaving the roof has somewhere to go, and any joint that weeps is marked for repair in the notes.

What does one written price take in for Hill Head roof work?

The work itself, the covering or materials it needs and a statement saying where VAT and the scaffold stand, all in a single figure that is written down after the roof has been looked at. A sound repair is offered first, and the notes from the survey go with it. Should a different quote be vague about scaffold or VAT, request that it be spelled out before you compare. Prices are good and fair, and what is written is what is paid, with no extras appearing once the work has begun.

Where's the water showing?

You'll get one written total price.

Get a quote Call WhatsApp