023 9396 0313 Get a written quote
A street of hipped bungalows below a green hill

Roofers in Rowner

Rowner is a district of Gosport; its chimney stacks and lofts are read from the pots to the joists, and one written total price follows.

10-year workmanship guarantee, in writing

  • PlanningGosport Borough Council
  • Building controlBuilding Control Partnership
  • Scaffold licenceHampshire County Council

Where rain gets into roofs in Rowner

Period houses with slate roofs, dormers and tall chimney stacks above a balcony

Breasts

Where a chimney breast rises through the rooms of a Rowner house to the stack above.

A damp patch on that breast marks the point where rain has travelled down.

A slim black conservation rooflight sitting flush in a Georgian slate roof

Joists

Where the timbers of the loft floor carry the ceiling below and the insulation above.

Wet insulation lying on those timbers records a leak somewhere overhead.

Spray foam under the roof slope in a loft

Vents

Where a gap at the eaves lets air into the roof space above the insulation.

A gap choked by loose insulation leaves the loft without that supply.

Stepped lead flashings dressed down the side of a stone chimney stack on a slate roof
A brick chimney stack where it leaves a tiled slope

Does a disused chimney stack still need attention?

Yes, because it takes rain whether or not a fire lies beneath it. The pots are capped, the pointing is read and the flashing is checked, so that damp does not travel down the breast into the rooms, and the flue is left as it was found.

StacksRowner stacks read from cap to breast, joint by joint

A chimney stack stands in the weather on all four sides, so a survey reads it from the top down. The pots and the mortar around them come first, then the brickwork and its pointing, then the flashing at the point where the stack comes through the slope, and last the chimney breast in the loft and the rooms below. Even a disused stack takes rain, so it is capped and looked at as a live one would be. Removing a breast is a different matter: the Planning Portal says building regulations approval will always apply when a chimney breast is removed, because a breast belongs to the structure of the building, and a breast on a party wall brings a party wall notice as well. Our chimney repairs page lists the work, and our leadwork page explains the flashing.

Rowner has a conservation area of its own in Gosport Borough Council's area, and only the council can confirm whether your road falls within its boundary. The Church of St Mary in Rowner is listed at Grade I, and as a Church of England church in use it takes works through the Church of England's faculty system, not listed building consent. A house that carries a list entry of its own must have listed building consent, under section 7 of the 1990 Act, before anything alters its character. Whether an Article 4 direction touches your street is one more question for Gosport Borough Council, so ask it early and in writing.

What the rules say about dormers and permitted development for roofs is kept in our planning guide for roof work, so this page leaves it there. If a stack is the only fault, the repair stays on the stack and the slope below is not disturbed, and the findings say which case yours is.

A chimney meets the rain on four sides, and each side is looked at.

Stack or flashing

A damp chimney breast can have two separate causes. Rain may be entering through open joints in the brickwork higher up, or running behind a flashing that has come away where the stack meets the slope. Both are examined before anything is suggested, and each gets its own photograph. Where the flashing alone is at fault, the lead is replaced and the brickwork left; where the joints have opened, the repair goes into the stack itself.

Up the Rowner stack

Pots
caps and mortar beneath
Brickwork
pointing and loose courses
Flashing
lead edge and fixings
Breast
staining below the slope
An interwar bungalow with a clay tile roof, a small dormer and an arched porch
Rafters and underlay seen from inside a loft

What a loft shows from beneath, the slope hides from above.

LoftsInside Rowner lofts: underlay, ventilation and the timber above

The loft shows a roof from beneath, which is the view rain never has. We look for daylight at the ridge and along the hips, for tide marks on rafters and around the timbers beside the stack, for insulation that has darkened or gone wet, and for underlay that has split or dropped between the rafters. HSE advises that all roofs be treated as fragile pending a competent person's confirmation that they are not, so the first look comes from inside the loft and from a ladder, and the slope is walked only when it is known to carry weight.

Marley sets eaves ventilation at 25 mm for pitches up to 15° and 10 mm above it, in a cold roof whose underlay is high-resistance. That is why the width of the eaves gap is taken with a rule, at the point where the insulation meets the slope. Insulation that has been pushed into that gap is pulled back, and the findings record the width found. A roof that is being re-covered can have its underlay changed at the same visit, which is the moment to confirm that the ventilation matches the pitch.

A written survey of the loft and the roof is the job of our roof inspections service, and it can stand alone without any repair. Where the findings point to a re-roof, the Planning Portal's two numbers decide whether building regulations paperwork is needed: 25 per cent of the building envelope and 50 per cent of the roof, both to be stayed under. Weight is judged separately: a new covering that raises the roof load by 15 per cent or more needs approval in its own right. At Rowner the Building Control Partnership (01329 824823) takes the question, and we raise it with them while the findings are still being written up.

Marks in the loft

Each mark in a loft is a clue to a place on the roof. A tide line on a rafter leads to the slope above it, a darkened patch of insulation to a leak beneath a tile, and a shaft of light to a gap in the covering. We follow each mark outward and note where it ends, then photograph both ends, so the written findings tie what you can see indoors to the exact spot outside.

Where it shows

A ceiling stain a metre from any wall, or insulation that has darkened and stayed damp for weeks.

Where it gets in

A torn stretch of underlay between two rafters, or a slipped tile above it that lets rain through to the felt.

Roof space

Underlay
tears and sagging
Rafters
tide marks and softness
Eaves gap
width for ventilation

Map of Rowner and the places around it, with the dashed line of our 30-mile service area from Havant. The same places are listed below the map.

Rowner stacks, lofts and what Gosport holds

What does a Rowner chimney stack survey cover, from pots to breast?

Top to bottom, in order. The pots and the mortar around them are looked at from a ladder, then the pointing and any loose courses of brick, then the flashing at the point where the stack comes through the slope. From inside the roof space the stack is traced downwards, and the breast is checked for staining, damp timber and light at its edges. MyJobQuote says correctly installed lead flashing can last for over 80 years, which makes a failed flashing a question about how it was fixed and what its edges have been through. The findings name the failed stage, with a photograph of it.

Which marks in a Rowner loft point to a fault in the slope?

A tide line on a rafter, a dark patch in the insulation, daylight at the ridge or hips, and underlay that has split or dropped between the rafters each lead outward to a place on the roof. Water can run along timber before it drips, so the mark is not always directly below the fault. We follow it uphill, photograph both ends and record them together. A ceiling stain with a dry loft above it is a different case, and points to a pipe or a gutter instead, which is why both are looked at before a slope is blamed.

Who answers the building regulations question on a Rowner re-roof?

The Building Control Partnership, on 01329 824823, answers it for Gosport addresses. Under the Planning Portal's thresholds, no building regulations application is normally called for when a re-roof touches under 25 per cent of the building envelope and under 50 per cent of the roof. A second test concerns weight: a covering 15 per cent or more heavier than the roof carries now needs approval, however small the area. We take your Rowner address to the Partnership while the findings are being written up, and you receive its reply as it came to us, with the reasoning, so nothing is lost in translation.

Who obtains the scaffold licence for a Rowner roof job?

Scaffolding at Rowner needs a licence from Hampshire County Council under section 169 of the Highways Act 1980, and its page says "Scaffolding companies must apply on behalf of their customers." The licence costs £211.90 on application and covers the first 2 weeks; each additional 2-week period is £72, and the licence period cannot begin until ten clear working days have elapsed. We arrange it with our scaffolder, and no application goes in until you have agreed the dates. A longer stay than first applied for means a new application with new fees, since extensions are not offered.

Does the Rowner conservation area limit what can be done to a roof?

The Rowner conservation area is a Gosport Borough Council one, and only the council can confirm if your address falls within it and what that means for your plans. Permitted development rights still cover an ordinary house re-roof there; for the exceptions, read our planning guide. An Article 4 direction may remove more rights on a given street, so ask while the plans are still open to change: check with Gosport Borough Council before ordering anything, and send us its reply so the findings can take it into account.

What happens with a listed church such as St Mary's in Rowner?

The Church of St Mary is listed at Grade I. As a Church of England church in use, it comes under the Church of England's faculty system, not the council's listed building consent. A house that carries a list entry of its own is a different case: it must have listed building consent before work changes its character, and Gosport Borough Council deals with that application. The entry gets read before a survey starts, so the findings can follow what it protects, and photographs of the present roof can go with that application.

Does Flood Zone 2 land near Rowner affect roof work?

The Environment Agency has mapped land near Rowner as Flood Zone 2. The zone describes the ground and says nothing about a roof slope, so it is not a rule for roof work, and a survey runs the same way, from the loft down to the gutters. It also does not mean that a particular house lies in the zone: the map for your own address is the one to read. We read nothing into the zone when we survey a roof, and you hear exactly what was found, with photographs of each place.

How does a Rowner roofing quote need to read?

It needs a single total at the foot, a plain note saying what the figure includes, scaffold and VAT among it, and the survey notes behind it. Ours is written after a survey from the ladder and in the loft; where a repair will serve, it goes before a re-cover. A second quote that never mentions scaffold or VAT deserves a question in writing before the two are laid side by side, because a smaller figure can leave costs out. Good and fair pricing is the intention, and the number written down is the one you pay.

Where's the water showing?

You'll get one written total price.

Get a quote Call WhatsApp