
Steps
Where a stepped line of lead climbs a gable wall beside a sloping Elson roof.
A corner lifted from the brick joint lets rain run in behind the metal.

Elson is a district of Gosport; where its roofs meet walls and gable ends, each fault is traced back to its cause and one written total price follows.
10-year workmanship guarantee, in writing

Where a stepped line of lead climbs a gable wall beside a sloping Elson roof.
A corner lifted from the brick joint lets rain run in behind the metal.

Where a timber board runs up the gable edge and shelters the end of the roof.
A board gone soft behind its paint gives the edge tiles nothing to sit on.

Where the gable wall rises under the last row of tiles at the open end.
Open pointing there is a second way in, separate from the tiles above it.

Where a roof ends against a wall, the lead has to hold the join shut.
The gap where a roof runs up against a wall or a chimney is closed by a flashing, which is lead or another metal bent to the shape of the join. Along a gable wall the strip climbs in steps with the brick courses, each step tucked into a raked mortar joint. We check every step for lifting, the pointing above it for gaps, the fixings along its lower edge and the point where it slides under the tiles. Correctly installed lead flashing can last for over 80 years, according to MyJobQuote, so a step that has lifted raises a question about its fixing and the mortar as much as about its age. Inside, a stain beside a chimney breast or high on a party wall helps place the fault outside. Our leadwork page shows how a flashing is dressed.
The Church of St Thomas in Elson is listed at Grade II, and as a Church of England church still used for worship it comes under the Church of England's faculty system rather than listed building consent for works. The Boundary Wall of St Thomas' Churchyard is listed at Grade II as well. A private house that has its own list entry is a different case: listed building consent, under section 7 of the 1990 Act, applies to any work that changes its character. The Hardway conservation area, in Gosport Borough Council's area, lies close to Elson, and the council can say whether your address is inside it. Anything about Article 4 directions in Elson is a question for Gosport Borough Council too.
Dormers and permitted development rights are set out in our planning guide for roof work. Where a flashing is the only fault, our roof repairs page shows how a repair is chosen, and the survey notes say whether yours needs renewing or refixing.
Where a roof ends against a gable wall the flashing climbs in steps, one for each course of brick it passes. We look at every step, because a single lifted corner can let rain behind the metal while the rest lies flat. A mortar joint that has crumbled above the lead admits water just as a gap in the lead does, so both are read together, and the photographs show the joint and the step side by side.
A stain beside the chimney breast, or a tide mark that climbs the party wall in the loft.
A lifted corner on one step of the flashing, or crumbled pointing above it that lets rain run behind the lead.

Yes, provided the board and the wall top underneath have not decayed. Each loose tile is lifted, the bed or clip under it renewed, and the tile set back on the line of its neighbours. Decayed timber is cut out first, after you have seen it.
At a gable the last row of tiles stops at the verge, and rain reaches that edge from the side as well as from above. We look along the line of verge tiles for chips and gaps, at the bedding or clips that hold them, and at the bargeboard beneath, which can soften out of sight behind a sound coat of paint. A board painted over many times may hide soft timber, so it is pressed with a screwdriver in several places. Below it, the top of the gable wall is read for open pointing. A verge fixed with dry clips is checked clip by clip, since one missing clip lets a tile lift. Our dry ridge and verge page explains the dry-fixed edge, and the findings tell you which kind of edge your house has.
Elson sits close to the water, so Cupa's exposure grading comes into it: the slate maker writes that a coastal building is graded with higher exposure. At a verge that grade bears on how the edge tiles are fixed, so the specification is worked out for the house under BS 5534 instead of being copied from the last job. The grade belongs to the site and is written into the survey notes, together with the method that suits it.
Whether a re-roof reaches building control comes down to the Planning Portal's two thresholds: under 25 per cent of the building envelope and under 50 per cent of the roof, within which no building regulations application is normally needed. A new covering that adds 15 per cent or more to the weight sits outside that and needs approval. In Elson the Building Control Partnership (01329 824823) receives the question, and we put it to them while the job is still being priced.
An edge tile has no neighbour on its open side, only the sky.
A verge tile has no neighbour on its open side, so each one is tested by hand along the gable, and any that rock are noted with the bedding or clip beneath. The wall top under them is looked at for open pointing, because a gap there is a second way in. The findings list each loose tile and mark it on a sketch of the gable, so the repair has a map to work from.
Map of Elson and the places around it, with the dashed line of our 30-mile service area from Havant. The same places are listed below the map.
Each step is fixed on its own, so each can fail on its own. A corner may lift from the brick joint while the steps either side lie flat, and the gap it leaves is enough to let rain run in behind the metal. The pointing above every step is read, as is the fixing below it, and from the loft we check for a tide mark on the wall or the chimney breast, which tells us which side of the roof to open first. The findings photograph the weakest steps and say whether the flashing is refixed in places or renewed along its length.
It is lifted, and what lies under it is read before it is replaced. The bedding or clip may have failed, the board beneath may have softened, or the wall top may have open pointing, and each of those needs a different repair. Setting the tile back on old bedding would only hide the cause. Where a few tiles are loose and the board is sound, the repair stays at the edge and the rest of the slope is left alone, with photographs showing every tile that was touched.
The Building Control Partnership, on 01329 824823, which provides the service for Gosport Borough Council in partnership with Fareham Borough Council. Its answer matters when the work goes beyond the Planning Portal's thresholds: under 25 per cent of the building envelope and under 50 per cent of the roof are the limits for a re-roof that needs no building regulations application as a rule, and a new covering 15 per cent or more heavier brings its own requirement for approval. We approach the Partnership before the booking is made and pass its reply on to you, and the survey notes then hold it beside the quote, for later reference.
A scaffold that blocks any part of the highway at Elson must be licensed under section 169 of the Highways Act 1980, and the licensing body is Hampshire County Council. Hampshire County Council's page says "Scaffolding companies must apply on behalf of their customers." The charge is £211.90 on application for the first 2 weeks and £72 for each additional 2-week period, and Hampshire County Council expects the application at least ten clear working days ahead of the start, and tacit consent does not apply. We arrange it with our scaffolder; you hear the date before anything is sent in.
The Hardway conservation area, which Gosport Borough Council lists, lies close to Elson. Only the council can say whether your address is inside its boundary, so put the question to it before work is planned. Whether an Article 4 direction touches your road is a second question, so check with Gosport Borough Council, because such a direction can withdraw further rights from the houses it covers. Re-covering a house stays within permitted development as a rule; the detail sits in the planning guide for roof work.
Not for listed building consent on the church itself. The Church of St Thomas is listed at Grade II, and because it is a Church of England church still used for worship, its works run through the faculty system of the Church of England, not through the council's listed building consent. The Boundary Wall of St Thomas' Churchyard has its own Grade II entry. A private house with a list entry is a different case: listed building consent from Gosport Borough Council applies once a job alters what the building is protected for, so the entry is read before the survey begins.
It changes the exposure grade and nothing else that can be stated. Cupa says a building in a coastal area gets a higher exposure grade, and Marley says BS 5534 includes wind uplift formulas and a means of calculating fixing specifications. For an Elson roof that means the fixings are worked out for the house and recorded in the survey notes. If the roof already stands, we sample its fixings across the slope and along the gable, and the findings record what is there and where each sample was taken, with a photograph of every place opened.
Everything the job involves, and a line saying if scaffold and VAT are included. Ours is written once the survey is over, one total with the findings behind it, and where a repair will serve it comes before any suggestion of a re-cover. If a second quote is silent about scaffold or VAT, ask for the gap to be filled in writing before you compare the numbers, because a smaller total can hide costs that surface later. We want the pricing to read as good and fair.
You'll get one written total price.
Fill in what you like. It opens WhatsApp with your message ready to send.