
Skylights
Where a window is set into the slope and metal pieces overlap the covering around it.
A lifted corner or a short flashing lets rain slide past the frame.

Roof window and chimney work, slope repairs and whole re-roofs in Clanfield, 9.9 road miles north of Havant, with each leak traced to the point where it enters.
10-year workmanship guarantee, in writing

Where a window is set into the slope and metal pieces overlap the covering around it.
A lifted corner or a short flashing lets rain slide past the frame.

Where a brick stack stands clear of the roof with pots, a mortar cap and its own joints.
A broken cap or open pointing lets rain into the brick and down the breast.

Where the lowest courses of the covering hang over the gutter and fascia.
A gap at the edge sends water behind the gutter and into the board.

It is a set of shaped metal pieces that overlap the covering on every side of the frame, from the sill piece at the base to the apron across the top. Each overlaps the next so that water runs over the joints and never into them.
A roof window sits in a gap cut into the slope, and a flashing kit, the set of metal pieces that overlap the covering around the frame, is what keeps that opening dry. A Clanfield survey checks the kit on all four sides: the sill piece at the bottom, the side gutters, the apron across the top and the corners where those pieces meet. We look for gaps where the covering has been cut short, for a flashing that has lifted, for old sealant smeared over a joint, for screws that have backed out, and for moss gathering on the upslope side of the frame, where it holds water against the metal.
Not every damp mark under a window is a leak, and that matters because the repairs differ. Condensation on cold glass runs down the pane and soaks the lining, and it can look very like rain coming in. Our method is to read the inside before climbing: where the damp sits, whether the lining is wet at the top or the bottom, whether the pane has misted between its layers. Then we go up and test the details one by one, pressing each flashing edge and looking along every joint. A misted unit has failed as a piece of glazing, which is a different repair from a flashing, and the findings say which of the two you have. Our roof windows and skylights page explains what a replacement involves.
Grade II on the National Heritage List covers the Church of St James, Arnside Cottage and Mill House. Catherington has the conservation area nearest to Clanfield, and East Hampshire District Council keeps the list for the whole district, so put your own address to the council well ahead of planning any work. Our planning guide for roof work explains how the rules treat roof changes.
Damp under a window can mean rain at the frame, or only moisture on cold glass.
Moisture trapped between the panes of a roof window is a sign that the glazed unit has failed, and it has no bearing on the flashing. Water on the inside of a single pane is condensation, and only wet plaster or a wet timber points to rain. Telling these apart before work begins avoids paying for a flashing when the glass is at fault, or the reverse, and saves a second visit.
Wet plaster in the lining, a stain that grows after rain, or a brown mark on the plaster beneath the sill.
A flashing corner that has lifted, a covering cut too short at the frame, or sealant that has cracked.

A damp chimney breast has three likely starting points, and each one gets its own check.
A chimney stack is a small brick tower that stands clear of the roof, and each of its parts has a different way of letting rain in. At the top, the pots are held by a mortar bed called flaunching, with a cap or crown beneath it that is meant to throw water outward. Below that come the brick faces and their pointing, then the flashing at the foot where the stack meets the slope. On a Clanfield survey we look at the cap for cracks and for missing mortar around the pots, at the pointing for joints that have eroded back, and at the bricks for flaking faces that have taken in water. Where a stack leans or a course has shifted, we state that plainly, because it calls for a rebuild and not a repoint, and the quote is written on that basis.
Stack work needs a safe platform on the roof edge or a tower beside it, and the survey visit settles which. Our chimney repairs page describes the repairs we carry out, from repointing and new flaunching to rebuilding the top courses, and says what each one involves for access. If the stack is no longer used, a cap over the pot can keep rain out of the flue, and we note the condition of any cap already fitted, since a loose one is a fall risk as well as a leak.
Inside, the loft shows what the stack has been doing. We look at the timbers round the breast for tide marks and soft spots, at the brickwork where it passes through the roof space, and at the bedroom ceiling beside it. A damp chimney breast on an upstairs wall can start at the cap, the pointing or the foot flashing, and the three need different repairs, so the findings name which one the evidence supports.
A wet chimney breast can trace back to the top of the stack, to its brick faces, or to the metal at its foot, and from indoors the three look identical. Rather than treating the nearest suspect, we work down the stack in order and stop where the evidence turns up. The photographs show you the point of entry, so you can see why the repair is aimed where it is.
We read the inside first. Condensation leaves a film on the glass and dampness at the lower part of the lining, and it appears on cold mornings without any rain. A leak leaves wet plaster or timber, and the mark grows after a downpour, spreading outward from one spot. Then we go outside and test the flashing on each side of the frame. If the pane has misted between its layers, the sealed glazing unit has failed, and that is a different repair. The findings state which cause the evidence supports, with photographs of the lining and of each flashing.
Start with the extent of the work. Under the Planning Portal's guide, re-roofing does not normally need a building regulations application if it affects less than 25 per cent of the building envelope and less than 50 per cent of the roof; a new covering 15 per cent or more heavier does need approval. East Hampshire District Council's building control service handles application queries and inspections on 01730 234207, and we put the proposed route to it ahead of any start, then pass its reply on to you in plain words. If the covering will be heavier, the rafters should be checked first, and we can arrange that.
A licence under the Highways Act from Hampshire County Council, which is the highway authority here. Hampshire County Council licenses scaffolding on the highway at £211.90 on application for the first 2 weeks and £72 for each additional 2-week period, needs ten clear working days' notice, and says scaffolding companies must apply on behalf of their customers; we arrange it with our scaffolder. The programme you receive builds that notice period in, and you are told the earliest start once the application is made. Poles set wholly on private land raise a different question, which is dealt with at the survey visit.
No. The Church of St James, Grade II on the list, is a working Church of England church, and any works to it are routed through the Church of England's faculty system, which takes the place of listed building consent. The faculty route concerns the church building and nothing else, so it has no bearing on a private roof. A house nearby is judged on its own list entry, if it has one, and on nothing else. Search Historic England's National Heritage List for your address and tell us what you find, because an entry changes what the written findings need to record.
Nothing automatically, because a list entry covers its own building and no other. Arnside Cottage and Mill House are both Grade II. If your own house is listed, its roof work keeps permitted development rights, though listed building consent is still needed where the work would affect the house's character, and East Hampshire District Council is the one to ask. If no entry shows for your address, ask the council before ruling out listed building consent, and you can search the list yourself on the Historic England site.
Catherington has the conservation area nearest to Clanfield. East Hampshire District Council keeps the full list, so check with East Hampshire District Council for your own address, and ask about Article 4 at the same time: its Article 4 list names none for Clanfield, but that is not the same as a reply for your street, and the council can give one. Ordinary re-roofing is normally permitted development even in a conservation area, and our planning guide goes through the wider rules and where each one comes from, so you can read the source for yourself.
Yes. The breast can take in water at the cap, through eroded pointing or from a failed flashing at the foot, and from inside the three look alike, which is why guessing is a poor way to spend money. We work down the stack from the pots, with photographs at each stage, and check the roof timbers around the breast from the loft. Once the entry point is clear, we say whether it needs a repoint, new lead, a fresh cap or a partial rebuild, and the reason for that choice, before any written figure is given and well before anyone starts work.
It should show a single written total for the whole job, naming the job, the covering chosen and the finish, and a plain note on whether VAT and the scaffold fall inside that figure. A quote that arrives without findings is hard to judge, so ours comes with the photographs and notes from the survey, set out in the order we found things. Pricing stays good and fair, and we leave the site tidy once the work is done. If any item is unclear, ask before you agree, and we are happy to explain it.
You'll get one written total price.
Fill in what you like. It opens WhatsApp with your message ready to send.