What a vent in the soffit is doing
The soffit is the board fixed under the overhang of the roof, between the wall and the back of the fascia. On some roofs it does more than tidy the eaves. A cold roof is one where the insulation lies along the loft floor, so the roof space above it stays cold. Moist air from the house can rise into that space, and unless it is carried away it can settle on the underside of the roof covering.
Marley's guidance on cold roofs, which follows BS 5250, handles this by letting air in along the eaves. Outside air enters at the bottom of the slope and leaves the roof space higher up. If the soffit is a solid board with no opening anywhere along it, that air has nowhere to enter on a roof that relies on it.
So the question is never only about the board. It is about whether the roof above was built to take its air from the eaves.
If the answer is yes, the vent is part of the roof's design and not a decoration, and replacing the board without it changes how the roof behaves.
The figures Marley gives
Marley's cold roof ventilation page sets out different answers for different underlays. The underlay is the sheet that lies beneath the tiles or slates to catch any water that gets past them.
| Underlay and roof | Eaves ventilation |
|---|---|
| HR underlay, pitch 15° or less | 25 mm, full eaves length |
| HR underlay, pitch more than 15° | 10 mm, full eaves length |
| Air-permeable underlay, sealed ceiling | normal eaves construction (3mm), on Marley's condition |
Marley treats an HR underlay as one that is not vapour-permeable, which is why it needs the eaves opening. Its condition for the third row reads: "fortuitous ventilation at the eaves via normal eaves construction (3mm) is all that is required, provided the requirements of UKAS Third Party certification are fully met."
Pitch means the angle at which the slope rises, and the roofer measures it at the survey. Because the requirement changes at 15°, a shallow roof and a steeper one on the same house can need different amounts of opening, so the table is the starting point for the specification, not a substitute for it. Ask for the underlay and the pitch to be named in writing.
What to check when soffits are replaced
New boards should leave the roof working exactly as well as before. Before the old soffits come off, a survey looks at:
- Which underlay the roof has, which can be seen from inside the loft with a torch.
- Whether the existing soffit has vents or slots, and how long a stretch of eaves they cover.
- Whether loft insulation has been pushed into the eaves and now blocks the air path.
- The pitch of the roof, since the 25 mm and 10 mm figures change at 15°.
If the roof relies on eaves air, the replacement soffit has to keep the opening, so a plain solid board is the wrong choice. If the roof is of the air-permeable kind, a solid board may be acceptable, but the roofer should say why. Either way, the answer belongs in the written quote rather than in a verbal assurance, because it decides which boards are ordered.
A roofer who has looked at the underlay and the pitch can answer in one line. One who has not may simply order the board that matches the old one, which repeats any mistake already in the roof.
Before the old boards come off
Two other checks come ahead of the vent question. The first is asbestos. HSE's advice is: "If the building was built or refurbished before 2000, assume that there is asbestos in it." Its list of materials includes asbestos insulating board, or AIB, in white soffit panels at the eaves. For work on AIB, licensing applies if the risk assessment indicates that the job "will not be of short duration". An older soffit should therefore not be broken up as a first step. Our guide to asbestos in soffits explains what happens next.
The second is wildlife. The gap behind a soffit can shelter a nest or a bat roost, and our answer on birds nesting in the eaves sets out what the law protects.
The overall job of renewing the roof edge is covered under gutters, soffits and fascias.
Both checks come ahead of the vent question because they can stop work altogether. Agreeing the order of events at the survey avoids a halt halfway along a roof edge, and the written quote can say what happens if asbestos or wildlife turns up.

