What is law and what is a standard
A statute or a regulation is law, and you must comply with it. A British Standard is a published document that binds nobody until a contract, a specification or a regulation says it does. BS 5534 is the standard covering how slate and tile roofs are put on, and Marley, the tile maker, says that installing to it "isn't required by law".
Marley adds that BS 5534 "requires mechanically fixed ridge and hip tiles", and that "mortar could no longer be relied upon as the only means of securing the roof covering." A dry ridge is one route to that kind of fixing. Its own specification is BS 8612:2018, the document written for dry-fixed systems, and following it is a choice as well.
So a standard is not, in itself, something an owner is obliged to meet. Even so, a quote that cites BS 5534 names a document you can ask to see applied to your roof, with the fixings in front of you. Our guide to mechanical fixing of ridge tiles shows what that looks like in practice, and why the question is worth asking.
The status of each document in one table
Four documents come up whenever ridge fixing is discussed. The table sets out what each one is and where it stands, so that a standard is never mistaken for a statute and a statute is never dismissed as advice. The right-hand column is the one that matters.
| Document | What it is | Standing |
|---|---|---|
| BS 5534 | Code of practice covering slate and tile roofs | Not required by law, according to Marley; BSI lists it as current |
| BS 8612:2018 | Specification for dry fixing at the ridge, hips and verges | A standard; BSI lists it as current |
| Building Regulations | Rules on how building work is carried out | Law; they reach some re-roofing |
| Planning rules | Permitted development and listed building consent | Law; they reach some homes |
A standard moves into the last two rows only when a regulation points to it. None of the rules named in the table makes a dry ridge compulsory for a house in England, and a mortar ridge is not made unlawful by any of them.
When Building Regulations and planning still apply
A dry ridge is not required, but ridge work can sit inside a larger job that the law does reach. The Planning Portal sets the tests. No application is normally needed if "Less than 25 per cent of the total 'building envelope' (walls, floor, roof, windows, door, roof windows and roof-lights) is affected" and "Less than 50 per cent of the roof is affected." Approval is needed if you use "a new covering material which increases the weight of the roof covering by 15 per cent or more." Those tests concern the share of the roof and the weight of the covering. They say nothing about how the ridge is fixed.
Your building control body, meaning the council's building control team or a registered building control approver, confirms how the tests apply. At a Havant address, we agree the building regulations route with that body before work starts.
On planning, an English house normally has permitted development rights for roof alterations under Class C, but an Article 4 direction can withdraw them. A listed home needs listed building consent for works "in any manner which would affect its character as a building of special architectural or historic interest". Where either applies, put the ridge question to the council before anything is booked, and let its reply settle it.
Points to have written into the quote
Because the standard is not law, the quote is where you decide what will be done on your roof, and the points below turn a general promise into something checkable. Ask for these points to be written down:
- how the ridge and hip tiles will be fixed, and whether mortar is the only fixing;
- which standard the fixing follows, and whether the specification takes account of the site's exposure;
- who confirms the Building Regulations route, where the job is part of a re-roof;
- whether the roof is listed or in a conservation area, and whether the council has been asked.
Cupa's guidance on slate says positions on slopes, hills or the coast "will be graded with higher exposure", which is a reason to have the fixings worked out for the site and not assumed. The question of how long the work lasts is covered in our answer on how long a dry ridge lasts, and everything we do at the ridge and the verge is on the dry ridge and verge page.

