Pots
Where a clay or metal pot stands on top of a stack and takes the first of the rain.
A cracked pot or a missing cap lets water run straight down the flue.

Swanwick roofs, 15 road miles west of Havant, get a top-to-bottom reading, chimney pots to the battens beneath the tiles, and a total in writing follows the survey.
10-year workmanship guarantee, in writing

Where a clay or metal pot stands on top of a stack and takes the first of the rain.
A cracked pot or a missing cap lets water run straight down the flue.

Where a stack climbs out of a slope and a band of lead seals the gap around it.
Once that band lifts from the brick, rain slides behind it and reaches the breast.

Where thin strips of timber run across the rafters and carry every tile on the slope.
A batten that has rotted lets its tiles drop, and the underlay below is exposed.

A stack stands in the weather on every one of its faces.
A stack is wet on every side at once, so it gets a survey of its own. Brickwork comes first: we sight along the courses for joints that have opened or bricks that have shifted. Next is the flaunching, the sloping mortar collar that holds the pots, then the pots themselves and any cap on them. Lower down, the band of lead sealing the stack to the slope is the flashing. Up in the loft, staining round the breast, or damp on the timber where the stack comes through the roof, shows which of those four parts has let water in. Our chimney repairs page lists the work that follows.
Birds like a stack too. Section 1 of the Wildlife and Countryside Act 1981 forbids anyone to take, damage or destroy a wild bird's nest while it is in use or being built, when that is done intentionally, so a pot holding an active nest is left alone and the repair is planned around it. That affects timing more than method: the brickwork and flashing are still surveyed and recorded. Once the nest is no longer in use, the pot can be cleared and capped, and a cap that keeps birds out also keeps rain out.
A stack with no flue in use sheds water like any other, and is checked just as closely. If a pot has cracked, it is replaced; if the flaunching has crumbled, it is renewed with fresh mortar; if the flashing has lifted, it is refixed or relaid in lead. Staining low on the breast indoors leads back to one of these, and we trace it upward from the room to the roof before proposing anything at all. Each finding goes in the notes with a photograph, and a price in writing comes after the survey, never before it.
Dampness at the breast can start in three places up the stack, each with its own cure. A cracked pot admits rain from above, a crumbled collar lets it round the pot's base, and a lifted flashing opens the slope joint lower down. We look at all three, photograph the one that has failed, and show you the picture before anything is priced. Where only the collar has gone, the rest of the stack is left as it stands.
A ring of staining on the breast in a bedroom, or wallpaper lifting low on the chimney wall.
A pot with a crack, a collar of mortar crumbling at its edge, or a lead band standing off the brick.

Only where they have rotted, split or lost their nail grip. Sound battens at the right gauge can stay, and we test them one by one. A re-roof that reuses weak timber puts new tiles on old problems, so the notes list which battens were kept.
A re-roof is more than new tiles. The old covering comes off, the rafters are checked, a new underlay is laid, new battens are fixed across the slope at a set gauge, and the covering goes on last. The battens matter more than they look, since each tile hangs from one. Marley lists the contents of BS 5534 as "batten selection, methods of fixing, wind uplift formulas and a means of calculating fixing specifications", so the timber size and the nails are chosen to suit this particular roof, not by habit. Our new roofs page describes the full sequence from strip to ridge.
Weight is the other test. Approved Document A treats a roof load increased by more than 15% as a significant change, so a covering that much heavier needs Building Regulations approval and a structural check. That is why we ask what the new tiles weigh before we agree to them, and why a lighter or equal covering keeps things simpler. Where the existing roof is sound apart from one slope, you hear that and the repair is priced first, with the larger job set out alongside it for comparison. Our pitched roofing page explains the repair-or-replace judgement we make at survey.
Underlay is the second line behind the tiles. A torn or perished sheet may never be seen from outside, yet it can carry water onto the timbers below, and the loft shows it long before the ceiling does. If a re-roof is on the table, our planning guide for roof work sets out where permission and approval enter, so this page leaves them there. Each layer is explained in turn, with a photograph where the loft allows one, and you decide how far to go once you have seen the condition of the roof for yourself.
Every tile on a slope hangs from a batten, so the battens come first.
The underside of a roof tells a story the top cannot. Daylight through the covering marks a missing or broken tile, a dark patch on a rafter shows water arriving over some time, and a damp, sagging underlay marks where it has been running. Up in the loft with a torch, we photograph what we see and match each mark to a point on the slope before a re-roof is even mentioned.
Map of Swanwick and the places around it, with the dashed line of our 30-mile service area from Havant. The same places are listed below the map.
A stack is taken apart in the mind, piece by piece: pots first, then the mortar collar round them, the brickwork below, and finally the lead band at its foot. The loft is part of it, because a ring of staining on the breast, or damp timber where the stack comes through, shows which part let water in. Photographs go in the notes. If only the collar has crumbled, that is the repair, and the rest of the stack is left standing, since a sound stack does not need rebuilding to cure a collar.
The Planning Portal names two limits, and inside both a building regulations application is not normally needed: less than 25 per cent of the building envelope, and less than 50 per cent of the roof. Weight brings its own test: a covering that adds 15 per cent or more to it needs approval. For a Swanwick address, ask the Building Control Partnership (01329 824823); we raise your job with it ahead of the first strip, and the reply reaches you in everyday words, leaving you to judge the next step without jargon.
Highway scaffolding is licensed under section 169 of the Highways Act 1980, and for Swanwick the licence is Hampshire County Council's to give. Hampshire County Council's fee is £211.90 on application for the first 2 weeks and £72 for each additional 2-week period, and it says its licences need "a minimum of ten clear working days" notice. Hampshire County Council's page also says "Scaffolding companies must apply on behalf of their customers." We arrange it with our scaffolder, and the proposed dates come to you ahead of the form, so nothing is lodged without your say.
Near Swanwick lie Fareham Borough Council's Sarisbury Green and Swanwick Shore conservation areas, and Eastleigh Borough Council's Old Bursledon and Botley. Fareham Borough Council lists the Swanwick Shore Conservation Area Article 4 Direction, in force 4 May 2011. Because an Article 4 direction can remove further rights, your own house is a question for Fareham Borough Council, ideally before any roof work is arranged, and the reply is worth keeping in writing, together with the date it was given. General re-roofing rules are in the planning guide we publish, and your address goes to the council ahead of any figure from us, so a local restriction is known before it can surprise you.
Listed building consent is the extra step to allow for, set by section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 for works that would change what makes a listed building special. Historic England's list carries Friends Farmhouse (entry 1233225) and Morgan's Farmhouse (entry 1233227), both Grade II. For an address of your own, look it up on the list, then ask Fareham Borough Council before booking anything. Permitted development for roof work survives the listing, and consent sits on top of that.
Yes, but it is a structural job with paperwork. The Planning Portal says that "Building regulations approval will always apply when removing chimney breasts as they are part of the building's structure." A shared breast also brings a party wall notice, served by the building owner at least two months before any work to the party wall begins, cutting away the breast being one example; a surveyor is needed only if the neighbour dissents or does not reply within 14 days. We would survey the stack first, then explain the sequence, the notices and the order in which the work would be done.
Every tile hangs from a batten, so one with rot, a split or a loose nail lets its tile slip. We test each by hand and by eye as the old covering comes off, working from the eaves up, keep those that are sound and at the right gauge, and replace those that are not. The underlay beneath is judged at the same time, since tears there are invisible from outside. The notes record which timbers stayed and which went, and a repair comes first wherever the roof allows it, with the cost of the larger job set beside it.
In a single written total, after the roof has been examined at close hand. VAT and scaffold either sit inside it or they do not, and the paper says which. A repair that would do the job comes ahead of any re-roof, and the notes explain why it will serve. When another quote stays silent on those two items, make it put them in writing first, then compare the two. We hold prices good and fair, and nothing gets added once the total is written, so the paper you sign is the whole of it.
You'll get one written total price.
Fill in what you like. It opens WhatsApp with your message ready to send.