
Gutters
Where the rain of a whole Park Gate slope arrives in one run along the eaves.
A joint that weeps or a run that has lost its fall leaves water against the wall.

Gutters, fascia boards and wall junctions on Park Gate roofs, 14.2 road miles west of Havant, are checked from the loft outwards, and the written total arrives when the survey is finished.
10-year workmanship guarantee, in writing

Where the rain of a whole Park Gate slope arrives in one run along the eaves.
A joint that weeps or a run that has lost its fall leaves water against the wall.

Where a long board under the bottom tiles carries the gutter and closes the rafter ends.
Once that timber softens, new brackets only move the fault a little way along.

Where a slope stops against a side wall, as beside an extension or a porch.
A lifted strip of lead there sends rain behind it and onto the inside wall.

The lowest foot of a roof carries the water of the whole slope.
Everything a slope collects arrives at the eaves together, so the bottom foot of a Park Gate roof is surveyed as a separate task. From the ladder we look at the lowest tiles, the underlay that should lap down into the gutter, the fascia timber under the gutter, and the soffit below the overhang. Brackets that have pulled forward, joints that weep and a fall that no longer reaches the downpipe each leave water where it was never meant to be. Brett Martin advises a fall of 1 mm for every 600 mm towards the outlet, so any run still holding water after a shower has lost that slope, or its brackets have given way, and we level it again. Our gutters, soffits and fascias page sets out the work.
Staining high on a bedroom wall can look like a tile fault when the source is the eaves. From the loft we read the rafter feet and the wall plate, since damp timber turns dark, and then go outside to see whether the gutter or the board is feeding it. Where the timber behind a gutter has softened, the gutter comes down, the board is dealt with, and the gutter goes back on solid wood. Should the covering above also be tired, you hear about it and choose how much to take on at once. Our roof repairs page covers work on the slope.
A soffit is also where a cold roof draws air. With a high-resistance underlay in a cold roof, Marley gives 25 mm of eaves ventilation at 15° or less and 10 mm above 15°, so vent slots painted shut, or buried by insulation, are worth finding. Underside boards are pressed for sag, because a stained one points to water running behind the gutter. Each fault goes into the survey notes with a photograph.
A gutter is only as steady as the board behind it. When a fascia has gone soft, new brackets just move the problem along. We press the timber at several points, look for daylight or damp from the loft side, and photograph what we find before any gutter comes down. Where the board is sound, the gutter is refixed and levelled to its outlet; where it is not, the board is renewed first and the gutter follows.
A damp stain along the top of an outside wall indoors, or a green streak down the brickwork beneath the gutter.
A bracket pulled forward, a seam that weeps, or a run that stays full of water after the shower has passed.

Yes, if the lead itself is intact and just its fixing has let go. We rake out and re-point the joint, then press the existing strip back into it. A split or thin strip gets replaced whole, not patched, and you see the old lead first.
An abutment forms wherever a slope runs up to a taller wall and stops: the flank of an extension, a wall shared with a neighbour, or the side of a porch. A strip of lead, stepped along the slope and tucked into a raked-out mortar joint, closes that join, and the strip is the part that gives way. We look at whether the lead has lifted along its top edge, whether the pointing holding it has crumbled, and whether the cover flashing still laps the tiles below. MyJobQuote says correctly installed lead flashing can last for over 80 years, so a strip failing early points at its fixing or at the wall behind. Our lead roofing and leadwork page shows how a strip is dressed into brick.
The stain from an abutment lands on an inside wall rather than the ceiling, which leads owners to blame the wall. We trace the mark up to the roof edge, then study the lead from the slope and from the loft. Where the lead is whole, the joint is re-pointed and the strip pressed home again; where it has split along a fold, a fresh run goes in. A flat extension roof ending against an older wall has the same kind of join, called an upstand, with the same causes: a lifted edge, a loose fixing, or mortar crumbling behind the metal.
Whether an extension roof or a new roof edge needs consent is set out in our planning guide for roof work, so this page leaves the rules there. What the roof itself can tell us is whether the junction is sound, what a repair would involve, and whether the brickwork wants pointing first. A short run of lead along one wall is a smaller job than a whole extension edge, and the survey sorts out which you have before a price is set.
Where a roof leans on a wall, the join does the work of both.
Lead at a wall can fail through its own fault, or because the joint holding it has crumbled. Fixing a new strip into soft brickwork only repeats the fault. So we rake out the joint, look at the mortar behind it and decide which part is at fault. You see a photograph of the joint before it is closed, and the notes record what was done to the wall and what was done to the metal.
Map of Park Gate and the places around it, with the dashed line of our 30-mile service area from Havant. The same places are listed below the map.
The bottom edge of the roof is read twice, once outside and once from the loft. Outside we look at the lowest tiles, the gutter's joints and fall, its brackets, and the board behind it. Inside, the rafter feet and wall plate are checked for dark staining, and the soffit for sag. A mark on a bedroom wall can begin at a gutter that overflows, with no tile at fault, so the gutter is followed down to the drain. The notes you receive carry photographs, and repair comes first where the timber behind is sound enough to take it.
The Planning Portal gives two limits, below which no building regulations application is normally required: less than 25 per cent of the building envelope, and less than 50 per cent of the roof. Approval is also needed where, in the Planning Portal's words, a new covering "increases the weight of the roof covering by 15 per cent or more". For a Park Gate address the route is the Building Control Partnership (01329 824823). We ask the Partnership before the first tile is lifted, then translate the reply for you, and how far to go remains yours to decide.
Park Gate scaffolding that reaches the highway falls under section 169 of the Highways Act 1980, and the licence comes from Hampshire County Council. Hampshire County Council charges £211.90 on application for the first 2 weeks and £72 for each additional 2-week period, while the same page also asks for "a minimum of ten clear working days" before the licence can begin. Hampshire County Council's page says "Scaffolding companies must apply on behalf of their customers." Extensions are not offered, so the single application must cover the full job. We arrange it with our scaffolder; before anything is lodged you are told the start and finish dates.
Fareham Borough Council holds the Sarisbury Green and Swanwick Shore conservation areas near Park Gate, and Eastleigh Borough Council holds Old Bursledon, also close by. Ask Fareham Borough Council if your own house falls inside one of its areas. A direction listed as Rookery Farm Botley Road appears in Fareham Borough Council's Article 4 entries for this part of the borough, and an Article 4 direction can remove further rights, which is why a check with Fareham Borough Council comes before any work is planned. The detail of roof rules sits in our planning guide, and your address goes to the council before we give a price, so nothing is left to chance.
Yes, in one respect: section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 means listed building consent for works that alter the special architectural or historic character of the building. Little Park Cottages is on Historic England's list at Grade II (list entry 1233206), and your own address can be searched there. Ask Fareham Borough Council before anything is booked. A listed home also keeps permitted development for roof work, but once the job touches what makes the building special, consent is required, so the question is raised at survey.
It can come off with little disturbance, as the strip sits in a mortar joint and laps over the tiles beside it. The tiles along that edge are checked first, because a cracked or slipped one beside the strip may need replacing whatever becomes of the lead. A new strip is dressed into a re-pointed joint and lapped over the tiles. Where the whole edge has lost its fixing, you hear that and see the photographs, so a larger job is chosen with the evidence in hand.
A gutter that has only slipped on its brackets can be refixed and levelled to the outlet, provided the board behind it is sound and the joints still hold. One that has split, cracked or lost its shape is replaced along the affected run. The fascia is checked first, because fresh brackets screwed into soft timber will not last. Afterwards water is run through to test the fall and the joints, and the downpipe is cleared so that it reaches the drain without a blockage along the way.
The work to the roof, the covering or materials it calls for, and a statement of what the total leaves out, VAT and scaffold above all. Our quote is a single written figure, set down after a close inspection, and the survey notes travel with it. A sound repair goes first on the page. Where a different quote says nothing about the scaffold or VAT, get that added first, then compare. We keep prices good and fair; the figure written down is what you pay, with nothing added afterwards.
You'll get one written total price.
Fill in what you like. It opens WhatsApp with your message ready to send.