Slate headlap

What is headlap on a slate roof, and why does it matter here?

The short answer

Headlap is the overlap each slate gives over the slate two courses beneath it. Slates are laid with no sealant, so that overlap is what keeps rain out of the joints. Cupa says the grade rises for coastal areas, so the lap and the fixings are worked out for the site, not assumed.

Headlap is the overlap that keeps rain out of a slate roof, because nothing else seals the joints. What sets it and why exposure changes it.

Period houses with slate roofs, dormers and tall chimney stacks above a balcony

Why overlap does the sealing

A slate roof has no seal between its slates. Each is laid with its lower edge over the slates below, and rain running down a face crosses a joint and carries on, because the slate beneath is covered by the one above.

Headlap is the measure of that cover. It is not the overlap with the course directly below, but with the one two courses down, and that extra course is what stops rain being driven up and over a single joint.

Each slate shows only part of its length, which is the exposure of its course, and the rest is hidden under the course above. A longer headlap means a shorter visible portion, which is why a roof laid with a generous lap shows less of each slate than one laid with a minimal lap.

The arrangement is simple, and everything else about a slate roof depends on it. A cracked slate, a shortened one or one that has slid down all reduce the lap, and the reduction can sit unnoticed until water reaches the underlay beneath. A line of damage that looks small from the garden can mean a good deal of lost cover.

What Cupa says about exposure on a coastal roof

Cupa, a slate maker, ties the amount of headlap to the environment. Its guidance on minimum headlap says "Most significant is the environment, with the two main factors being exposure to wind and rain." It then says "Buildings positioned on slopes, hills or coastal areas as well as tall buildings will be graded with higher exposure."

For a roof around Havant, Hayling Island or the Solent shore, that means the grading is not assumed to be average. Coastal homes are graded for higher exposure, so the fixing specification is calculated for the site under BS 5534, and the headlap is part of that calculation.

A map or a guess is not a substitute. The site's own details are taken when the roof is surveyed, and the lap and fixings that follow come from the specification built on them.

Inland houses are graded too, and a house on a hill or a tall building is graded higher wherever it stands. Exposure is a property of the site, not of the postcode. That is also why two houses a few streets apart can end up with different specifications, each correct for its own position.

The 115mm overlap inside the pitch figure

Headlap appears in the pitch rule as well. Cupa says BS 5534 "also indicates that the minimum roof pitch for natural slate is 20 degrees in the case of a project situated in an area with moderate exposure and with a slate 500mm long and a 115mm overlap".

That sentence ties three things together: the angle of the roof, the length of the slate and the overlap. Alter one and the others have to be worked out again, which is why the figure carries conditions and why the maker's data sheet settles the question. It also explains why a steeper roof can use a different lap from a shallower one, and why a lap that copes on a sheltered slope can fall short on one that takes the weather. A lap is therefore never copied from the roof next door, because that roof may stand at another angle or in another position.

For the full conditions, see our answer on the minimum pitch for a slate roof. Hook fixings have a limit of their own, covered under slate hooks or nails.

Neither figure is a number to memorise. Each is a condition that the maker's data sheet states for a particular slate, and the survey is where they are matched to your roof.

Headlap when a slate roof is repaired

On a repair, headlap is what a surveyor checks at every course. A slate that has dropped, been shortened or been replaced with one of the wrong length gives less cover than the roof was laid with.

  • slates sitting lower than their neighbours, which have lost overlap
  • broken tails, which leave less length below the joint
  • replacement slates cut short or the wrong size
  • reused slates with the top edge worn away at the nail hole

Matching size and thickness on a repair is done for that reason. Our answer on reusing old slates explains how reused slates are checked for the length they still have.

A repair put in at the wrong lap can look finished and still leave a path for water, so the check is made on the slope as well as on the slate in the hand. The lap is looked at as well as whether the slate is in place, and the maker's figure for the slate in question is the reference. A written price follows the survey. Our slate roofing page describes the wider work.

Related questions

Is headlap the same as the exposure of a slate?

No, though the two are linked. Headlap is the overlap with the slate two courses below, and the exposure of a course is the part of each slate left showing. Cupa also uses exposure for the weather a building takes, graded higher on slopes, hills and coasts, so the word carries two meanings.

Does a bigger headlap make a roof safer in the wind?

More lap gives more cover against rain, but how a slate is held against the wind comes from the fixing specification, which BS 5534 covers through wind uplift formulas. Both come out of one calculation for the site, so neither is chosen on its own or copied from another roof.