When the 14 days apply
The Consumer Contracts Regulations 2013 treat a contract made away from the roofer's business premises as an off-premises contract. Regulation 5 covers one "concluded in the simultaneous physical presence of the trader and the consumer, in a place which is not the business premises of the trader". A roofing contract agreed at your kitchen table once the survey is done fits that description.
Under regulation 29 you may cancel "at any time in the cancellation period without giving any reason". Under regulation 30 the cancellation period ends at the end of 14 days after the day on which the contract is entered into. Start counting from the day after you sign: a contract made on a Monday runs to the end of the Monday two weeks later.
If you sign at home after our survey you have 14 days to cancel, and the written quote you sign is one total price, so you know exactly what you are cancelling. Nothing in the regulations asks you to explain yourself, or to give the roofer a chance to change your mind first.
Diary the last day when you sign, so that the date does not slip past while you are thinking it over.
Starting work inside the 14 days
A roofer cannot simply start on day two. Regulation 36 says work begins inside the cancellation period only on the consumer's request, and for an off-premises contract the request has to be made on a durable medium. A durable medium is anything you can keep and read again, such as an email, a text message or a signed letter, so a spoken "yes, start Monday" does not count.
Asking for an early start can be sensible. A leak with a stripped slope above a bedroom, or a booked scaffold slot, may make waiting a fortnight a poor choice. A request to start early can change what you owe if you cancel after work has begun, so read the wording of the request before you send it, and keep the reply.
If you are unsure what a request commits you to, ask Citizens Advice before you agree. A roofer who wants to start early should be happy for you to take a day to check, because a written request protects both sides and a clear record helps if the job later goes wrong. A text that says only "ok" may not show what you agreed to, so say exactly what you are asking for.
When there is no right to cancel
Regulation 28(1)(e) removes the right where "the consumer has specifically requested a visit from the trader for the purpose of carrying out urgent repairs or maintenance". Citizens Advice puts it plainly: you don't automatically get a cooling-off period if you invite the business into your home for urgent repairs or maintenance.
- A planned re-roof, priced after a survey and agreed at your address, carries the 14 days.
- A visit you asked for to deal with an urgent repair does not carry them.
Where the line falls between the two is a question for Citizens Advice, not a matter of what either side calls the job. A roofer called out to a leak that needs making safe is in a different position from one asked to quote for a new roof that will take several weeks, and the paperwork should make clear which it is. Keep any note of how the visit was arranged, because it shows what you asked for.
If a roofer tells you a planned job is urgent so that the right does not apply, ask for that in writing, and call the helpline named below before you sign anything.
How to cancel and who to call
The regulations ask only for a clear statement of your decision, but in a dispute it is for you to show that you cancelled in time. So cancel in writing, by email or letter, giving your name, the address of the job, the date you signed and a plain statement that you cancel the contract. Keep a copy and proof that you sent it, using a route that gives you a record of delivery, such as an email you can show was sent or a letter you can trace, and note the date and time. Do it inside the 14 days, and do not leave it to the last moment.
For advice, call the Citizens Advice consumer helpline on 0808 223 1133. Citizens Advice can take details of a complaint and pass them to Trading Standards, which you cannot do yourself, and GOV.UK sends you to Citizens Advice for advice about your consumer rights. The Citizens Advice page on cancelling building work sets out the steps.
After the 14 days have gone, what you can do depends on the terms of the contract, so read them before you sign. Deposits matter here: see paying a roofer upfront, and check what a written quote should include. Our other roofing answers are collected on the homepage.

