023 9396 0313 Get a written quote
Weathered stone roof slabs hung on battens with timber pegs, a village behind

Roofers in Milland

Milland, 21.7 road miles north-east of Havant, sits inside the South Downs National Park. Rafters, battens and outbuilding roofs there are checked before a quote is put in writing, so the price follows the findings.

10-year workmanship guarantee, in writing

  • PlanningSouth Downs National Park Authority
  • Building controlyour building control body
  • Scaffold licenceWest Sussex County Council

Where rain gets into roofs in Milland

Moss growing on a tiled roof above a flint and brick wall

Barns

Outbuildings with a roof of their own, which a listing can protect as firmly as a house.

The consent route belongs to the planning authority, and it should be settled before tiles are priced.

An interwar bungalow with a clay tile roof, a small dormer and an arched porch

Rafters

The sloping timbers that carry the battens and the covering from the ridge to the wall.

Daylight, stains and soft patches on them are read from the loft before anything outside is priced.

Moss and weeds growing in a gutter under tiled eaves

Battens

Slim lengths of timber fixed across the rafters, which the covering hangs from.

A dark stain along a batten marks the course water has travelled.

Cracked mortar under a ridge tile on a slate roof
The ridge and slope of an outbuilding roof.

Does a listed farmhouse listing cover my barn too?

It can. A structure within the curtilage of a listed building that has been part of the land since before 1 July 1948 is treated as part of it. Look up the barn as well as the house, and ask Chichester District Council about any roof work affecting either.

BarnsRoof work beside Waldergrave Farmhouse and its Grade II barn

An outbuilding's roof is judged by the same questions as a house's: where does rain land, where does it run, and where could it get in? On a farm building we walk the ridge, the eaves and the gable edges, then step inside for the view from beneath, because a fault at one end can hide from the yard. Loose pieces, gaps at the verge and a sagging line along the ridge are noted with photographs, and each fault is marked on a drawing of the roof, so a repair can be matched to it. Gutters and downpipes on the outbuilding are checked too, because a barn without sound gutters sends its rain straight down its own walls. Our pitched roofing page describes how a covering is laid, and the survey says whether a repair would hold.

Waldergrave Farmhouse (list entry 1275702) and the Barn at Waldergrave Farm to the North East of the Farmhouse (list entry 1275703) are each listed Grade II. A listing does not stop roof work. It does mean that listed building consent is required where the work would change what the listing exists to protect, and a new covering or a changed roofline should be raised with Chichester District Council first. If your own building holds an entry, read it in full before a roofer prices anything.

Because Milland falls within the Park, Chichester District Council deals with planning applications on behalf of the South Downs National Park Authority. Applications from Milland pass through Chichester District Council's planning team, which handles them for the Authority, and only called-in cases go straight to it. The Wardley conservation area lies close to Milland; ask Chichester District Council about it, and about any Article 4 direction, since either could affect the choice of covering. Our planning guide for roof work covers the general rules.

A barn is a roof with walls under it, and the roof is the part that matters.

Barn roof, house rules

A barn can be listed in its own right, separate from the farmhouse beside it, as at Waldergrave Farm. An older outbuilding with no entry can still count as part of a listed house if it stands within its curtilage, so each building has to be looked up and asked about. We ask which buildings on your plot carry an entry, then plan the survey building by building, so that the consent question is answered once and answered correctly.

Outbuilding checks

Ridge
line, capping and ends
Verges
edges at each gable
Eaves
boards, gutters and pipes
Openings
vents and rooflights
A chalet bungalow with a wide front dormer and a concrete tile roof
Rafters, battens and underlay seen from the loft.

The loft keeps the evidence that the roof surface hides.

RaftersMilland rafters, battens and underlay, read from the loft

Some faults show better from beneath than from the ladder. With a torch and a hard hat, we look first for daylight, which marks a gap in the covering, then for staining on the rafters and battens, which marks where water has travelled, and last for insulation that is dark or soaked. HSE says all roofs should be treated as fragile until a competent person has confirmed they are not. Nobody walks on a surface before its strength is known. For a closer look at a leak, our roof inspections page explains what a survey covers.

The membrane under the battens is the second line of defence. We check it for tears, for sagging between rafters where water could pool, and for lapped joints that have opened. Where the membrane is sound, a few tiles can be replaced and the roof left alone, which is the cheaper outcome and the one we look for first. Where it has failed across a wide area, the covering is better lifted and relaid, and the battens checked as it comes off. Small repairs are described on our roof repairs page.

Some practical points. The Planning Portal draws two lines: a re-roof touching under 25 per cent of the building envelope and under 50 per cent of the roof stays under the first, and a covering 15 per cent or more heavier crosses the second, and needs approval whatever the size of the job. West Sussex County Council licenses scaffolding on the road at £266 for one month and expects at least 10 working days' notice. Our practice is to arrange the licence with our scaffolder and fit the dates to yours. Environment Agency mapping places land near Milland in Flood Zone 3, which is about the ground, not the roof, and so the survey does not depend on it.

Light, stain and soak

Three signs tell most of the story from the loft. Light means an opening, a brown or black stain means water has been along that timber, and soaked insulation means it has been arriving for some time. We note where each sign sits on a plan of the roof, then climb outside and look at the matching spot, taking a photograph of each pairing. The two views meet, and what caused the mark can be shown.

Where it shows

A pale patch of daylight in the loft ceiling on a bright morning, or a dark stain running down a rafter.

Where it gets in

A broken tile, a torn membrane or a slipped lap above, which lets water onto the timber and along it to a lower point.

Map of Milland and the places around it, with the dashed line of our 30-mile service area from Havant. The same places are listed below the map.

Milland roofs, barns and the Park rules

What does a loft survey reveal about a Milland roof?

A good deal that the ladder misses. In the loft we check for daylight through the covering and for any smell of damp, staining along rafters and battens, sagging or torn membrane, and insulation that is dark or wet. Each sign is placed on a sketch of the roof, then matched to the outside surface, so the cause is traced and not guessed. What we find reaches you in writing, with photographs, and a roof that is sound is left alone, with the survey as the record of its condition on the day and a baseline for any later comparison.

Is a barn roof near Waldergrave Farm handled like a house roof?

In practice, yes, with one addition. Waldergrave Farmhouse and the Barn at Waldergrave Farm to the North East of the Farmhouse are each listed Grade II, so roof work that would change what either listing protects needs listed building consent. An outbuilding with no entry of its own can still count as part of a listed farmhouse if it stands within the curtilage and has done since before 1 July 1948, so ask Chichester District Council before assuming otherwise. Check the entry for every building on your plot, and tell us what you find so the survey is planned round it, building by building, with the consent question answered before a price is written.

Who deals with a roof application for a Milland property?

Milland lies inside the South Downs National Park, so decisions on planning rest with the South Downs National Park Authority. Chichester District Council's planning team handles applications from Milland for the Authority, and only called-in cases go straight to it. A plain re-roof stays under the normal rules, so the question is usually about extras. Because your own address decides the route, ask Chichester District Council in writing before any materials are ordered, since a refusal after delivery is a waste, and keep the reply with your property papers, along with the survey findings and any photographs of the work.

How does the Wardley conservation area matter to a Milland roof job?

It lies close to Milland, and Chichester District Council, which processes planning here for the Park's Authority, can say if your address lies within it. Whether an Article 4 direction removes further rights at your property is the same enquiry, so check with that council before a covering is chosen. We raise it at the start of the survey, because an answer that arrives late can force a roof to be re-planned from scratch, and that costs the owner time as well as money. Our planning guide gives the national position.

Does re-roofing at Milland go through building control?

Building control is outside the National Park Authority's remit, so that question goes to Chichester District Council's building control team. On the Planning Portal's reading, a re-roof touching under 25 per cent of the building envelope and under 50 per cent of the roof usually needs no building regulations application, while a heavier covering, by 15 per cent or more, does need approval. We measure your roof against that test and write to that team ahead of work, and we pass you the reply as soon as it arrives.

Who arranges scaffolding for a Milland roof, and what does it cost?

Scaffolding that blocks the road or pavement comes under section 169 of the Highways Act 1980. For Milland, scaffolding licences come from West Sussex County Council, which lists £266 for one month and asks for at least 10 working days' notice. You do not apply yourself: we arrange the licence with our scaffolder and choose dates with you first, which keeps the lane or verge clear of poles for only as long as the work requires. The licence cost is part of the one written price and is not added afterwards, once the poles have gone up and the neighbours have noticed.

Does Flood Zone 3 land near Milland change how the roof is mended?

It does not. Environment Agency mapping shows Flood Zone 3 land near Milland, and that label describes the land near the village, not any roof. Tiles, flashings and gutters are repaired the same way whichever zone a property sits in, and with the same checks afterwards. Where flooding is a worry, your insurer or solicitor is the person to ask what the mapping means for your plot and your policy, because the answer turns on the wording of that policy. We confine ourselves to the roof and to recording what we find, with photographs you can keep, so the file is complete whatever question comes next.

What should I expect from a written roof quote in Milland?

A single total, set out in a document that follows a survey, with the findings printed alongside. Check that it describes the job, the covering and if VAT and scaffold sit within the total, and that a surveyor has actually been on the roof. If a repair would hold, it comes before any suggestion of replacement, and any case for replacement is explained in plain words. Each price is good and fair. If you hold several quotes, put the same questions to each firm, and ask what each total excludes, so that the comparison is like with like and nothing important is hidden in a footnote.

Where's the water showing?

You'll get one written total price.

Get a quote Call WhatsApp