023 9396 0313 Get a written quote
Weathered stone roof slabs hung on battens with timber pegs, a village behind

Roofers in Cowplain

Ridge, hip and eaves work for Cowplain homes, 5.9 road miles north-west of Havant, with the leak traced first and one total price in writing.

10-year workmanship guarantee, in writing

  • PlanningHavant Borough Council
  • Building controlyour building control body
  • Scaffold licenceHampshire County Council

Where rain gets into roofs in Cowplain

A ridge along a tiled roof

Hips

Where two slopes meet at an outward corner and capping tiles in a row cover the join.

A capping tile that has shifted leaves the join open to the next downpour.

A gutter full of leaves, moss and a broken tile after a storm

Soffits

Where the underside board shuts the space from wall to fascia.

A soft or open board shows that the eaves behind it have been taking in water.

New EPDM membrane and drip trim on a garage roof edge

Lean-tos

Where a roof with one slope rests against the back wall of a house.

The wall edge is where a lean-to takes in rain, more than the middle of the slope.

Grey dry verge units along the gable of a concrete tile roof
Ridge tiles capping the join of two slopes.

A ridge cap can loosen if the bedding or fixing under it fails.

RidgesCowplain ridges, hips and the tiles that cap them

The top of a pitched roof is the ridge, where two slopes meet, while a hip runs down the roof where two slopes turn an outward corner. Both are finished with ridge tiles, and a cap relies on whatever holds it down. On a Cowplain survey we look along the cap for tiles that have shifted, for mortar bedding that has cracked or fallen away beneath them, and for open ends where the cap stops short of a gable. Marley, the tile maker, says BS 5534 is a code of practice, not law, and says mortar alone "could no longer be relied upon", so a ridge held by mortar and nothing else gets a closer look. Our pitched roofing page covers the coverings we work with and how a ridge is fixed when mortar is not enough.

Inside the loft, we read the underside of the ridge for daylight, for dark staining and for damp on the timber below it. A mark on a bedroom ceiling can sit well away from the ridge, because a drip can travel along a rafter before it falls, so we follow the stain upslope until the entry point is clear. Where a ridge is dry-fixed, we check the clips and screws as well as the tiles. Then you hear whether a few tiles need refixing or the whole run needs bedding again, and why.

Cowplain is in Havant Borough Council's area, and the conservation areas closest to it are Horndean, Catherington, Blendworth and Sir George Staunton, the first three under East Hampshire District Council and the last under both councils. Check any specific address with Havant Borough Council. Its Article 4 page names no direction for Cowplain, yet only the council can say what covers your street. Our planning guide for roof work sets out the rules.

Along the ridge

Cap
tiles seated and in line
Bedding
mortar sound or fixings present
Ends
gable and hip finishes
Loft
daylight and dark timber

Reading a stain from below

A ceiling stain tells you where the rain ended up, and the loft tells you where it travelled. We lay the two side by side before touching a tile: the position of the mark, the timber above it and the nearest joint on the slope. That order keeps the repair at the cause, so a wet corner is not patched while the open joint above it stays open and drips again.

Where it shows

A brown stain spreading across a bedroom ceiling, or a dark line on the loft timber just below the top of the roof.

Where it gets in

A cracked bed under a ridge tile, or an end tile that has shifted and left a gap at the gable.

Moss and weeds growing in a gutter under tiled eaves
A gutter run on its fascia beneath the eaves tiles.

Does a flat lean-to roof need its own survey?

Yes, because its route for water differs from the pitched roof beside it. We follow the covering to the upstand at the wall, then to the joints and the outlet, and report on each before we price.

EavesGutters and soffits along a Cowplain roof edge

The last stretch of the route is the roof edge. The lowest tiles overhang the fascia board, which carries the gutter, while the soffit is the board under the overhang that shuts the gap back to the wall. We check that the bottom course of tiles reaches far enough to throw water into the gutter, that the brackets hold the run firmly and that the fascia is sound enough to carry a gutter full of rain. Brett Martin, a gutter maker, advises a fall of 1 mm for every 600 mm towards the outlet, which means a run that sags between brackets holds water where it should be moving. Joints that drip, a loose downpipe and a hopper packed with moss all show from a ladder, and we photograph each one for you. Our gutters, soffits and fascias page lists the work.

A lean-to or an extension with a flat roof behind the house has its own route for water. At the house wall the covering rises as an upstand, and rain gets in at that edge, at the joints and at the outlet. BS 6229:2025 sets a minimum finished fall of 1:80 for membrane flat roofs, and a roof is therefore designed to a steeper fall to allow for tolerances. We look for standing water, splits and blisters in the covering, and an outlet that is clear to the pipe. Our flat roofing page covers the coverings we fit.

A timber board that has gone soft tells us a leak has run for some time, and it is cheaper to say so at the survey than to find out at the end of a repair. Where only a blocked run is at fault, the answer is a clean-out, and the quote reflects that. Where fascia or soffit timber has rotted, we show you the board at the survey.

A run that sags between brackets holds the rain it should carry away.

Where the drip lands

A gutter that overflows onto a wall is the same fault whether it shows as green staining outside or as damp plaster inside. We follow each downpipe to the point where it discharges and note whether it ends at a drain or against the brickwork. That last metre is part of the survey, because water left to collect at a wall footing is a problem the roof did not start.

Along the roof edge

Overhang
tile edge into the gutter
Brackets
spacing and firm fixing
Soffit
board soundness underneath

Map of Cowplain and the places around it, with the dashed line of our 30-mile service area from Havant. The same places are listed below the map.

From ridge to gutter, Cowplain answers

What does a Cowplain survey look for along the ridge and hips?

We start at the top. Along the ridge and the hips we look for tiles that have moved, bedding that has cracked or fallen out, and ends where the cap stops short of a gable. From the loft we then read the underside for daylight, staining and damp timber, because a mark on a ceiling can sit far from where the rain came in. We also note how each ridge is fixed, since Marley says installing to BS 5534 "isn't required by law". You receive the findings in writing, together with one written total price for the work, so you can see what was found before you decide anything.

How much of a Cowplain roof can be renewed before the building regulations route changes?

The Planning Portal's guide draws the line in two parts. Two measures decide it: less than 25 per cent of the building envelope touched, and less than 50 per cent of the roof. When both hold, no application is normally needed, while approval is needed for a covering 15 per cent or more heavier. With a Cowplain address, we ask your building control body which route applies before work starts, and we tell you the answer in plain words. A heavier covering brings a structural check of the rafters first, and that comes before any agreement is signed. Havant Borough Council's own customer services line is 023 9244 6019.

Who applies for the highway licence when scaffold goes up in Cowplain?

Scaffold that stands on a pavement or road needs a licence under section 169 of the Highways Act 1980. Hampshire County Council licenses scaffolding on the highway at £211.90 on application for the first 2 weeks and £72 for each additional 2-week period, needs ten clear working days' notice, and says scaffolding companies must apply on behalf of their customers; we arrange it with our scaffolder. Hampshire County Council does not offer extensions, so the licence is requested for the full period of the job, with the notice period built into the start date.

Which conservation areas sit nearest to Cowplain?

Horndean, Catherington, Blendworth and Sir George Staunton sit closest, with East Hampshire District Council listing the first three and both councils listing the last. Havant Borough Council is the planning authority for Cowplain, so you ask it whether your own address sits in one. Replacing the covering of a house is normally permitted development, but an Article 4 direction can remove further rights, so we check with the council before work starts. If a conservation area does apply, we write the survey findings in a form you can send to the council with any application, and the cause is set out clearly.

How can I tell whether an Article 4 direction touches my Cowplain street?

Havant Borough Council's Article 4 page names no direction for Cowplain, but the answer for your street still has to come from the council. An Article 4 direction is how a planning authority withdraws specified permitted development rights across a defined area. Ask the council which direction, if any, covers your address before you book work, and let us know its answer, so the job can be planned around it. If one does apply, the survey is written so that you can attach it to an application without rewriting it.

Can a Cowplain roof be repaired without stripping a slope?

Yes, where the battens and tiles around the fault are sound. A cracked run of ridge bedding, a lifted flashing or a slipped tile can each be put right without stripping a slope, and we say which it is after the survey. Where a whole slope has failed, patching only moves the leak, and the answer is to re-cover it, with the reason given in writing. We put right what is sound enough to put right and recommend more only when it is not, and the written total price reflects whichever job it turns out to be, with the cause named beside it.

Why is the loft part of a Cowplain survey?

The slope shows what the weather has done to the covering, and the loft shows what has come through. Daylight at a joint, a dark ring on a rafter, damp insulation or a wet patch on the underside of the felt each point to the entry and how far the rain travelled. On a cold roof with high-resistance underlay, Marley's figure for eaves ventilation is 25 mm at 15° or less and 10 mm above 15°, so we check that the eaves are clear, because damp in a loft has more than one possible cause.

What should a Cowplain roofing quote show me?

It is one written total price, and it follows the survey. It names the work and the covering, and it should say whether VAT and the scaffold are included, which is worth checking on any quote you compare. A fault that a repair can cure gets a repair-sized quote, never a re-roof one. You can ask for the survey findings in writing beside the price, so each part of the work matches something found on the roof, and we sweep up the site before we leave. Nothing in it is a surprise on the day, because every part of the work was described before you agreed to it.

Where's the water showing?

You'll get one written total price.

Get a quote Call WhatsApp