023 9396 0313 Get a written quote
A street of hipped bungalows below a green hill

Roofers in Westbourne

Westbourne is a little over 4 road miles east of Havant. At each place its roofs meet walls, chimneys and gutters, we survey the roof first and send one written total price afterwards.

10-year workmanship guarantee, in writing

  • PlanningChichester District Council
  • Building controlyour building control body
  • Scaffold licenceWest Sussex County Council

Where rain gets into roofs in Westbourne

A small lead-covered bay window roof with wood-cored rolls on a Victorian house

Abutments

Every spot where the tiling butts up to a taller wall, sealed with a stepped strip of lead.

One lifted step can send rain behind the metal and out as a stain inside the wall.

Stepped lead flashings dressed down the side of a stone chimney stack on a slate roof

Chimneys

A stack passes up through the roof, so lead is dressed round it on every side.

The uphill edge, where rain gathers against the brickwork, gets the closest look.

New EPDM membrane and drip trim on a garage roof edge

Outlets

The opening in a flat roof or a gutter where water leaves for the pipe.

A blocked outlet leaves a puddle, and a puddle leaves its mark on the ceiling below.

Split old lead flashing pulling away from a brick abutment
Stepped lead flashing where a roof meets a wall.

Is stepped lead the same thing as a flashing?

Stepped lead is a flashing cut in steps so that it follows the courses of brickwork up a wall. Other flashings, such as the ones wrapped around a chimney stack, are shaped to their own corners instead.

AbutmentsFlashings, chimneys and the wall joins of Westbourne roofs

A roof does not stand alone. A pitch climbs to a taller wall, a chimney stack rises through the covering, a porch roof leans on the house, and each of those meetings relies on a flashing, meaning lead or another metal dressed from the roof up onto the wall. Along a sloping wall junction the strip is cut in steps, so it gets called stepped flashing. We check each step for lift, the pointing above it for gaps, and all four sides of a stack for splits. Our lead roofing and leadwork page explains the metal, and roof repairs describes what a fix involves. Correctly installed lead flashing can last for over 80 years, according to MyJobQuote, so one that has failed early is worth reading for its cause.

The Parish Church of St John the Baptist is listed Grade I (list entry 1026167) and is a church where the Church of England still holds its services. Changes to the building go through the Church of England's faculty system, not through listed building consent. Houses follow another path. Westbourne House is listed Grade II* (entry 1354623) and The Good Intent Public House is Grade II (entry 1026140). Where a listed building is not an exempt church in use, Chichester District Council grants listed building consent for anything affecting its character.

The Westbourne conservation area is the other local layer. Chichester District Council is the body that confirms whether an address falls inside it. In the normal run a house re-roof stays permitted development there, and an Article 4 direction lets a council withdraw specified rights across a defined area. Ask Chichester District Council before assuming anything about your road. Our planning guide for roof work sets out the rules that this page leaves alone.

At every wall join the metal has the whole job.

Reading a lifted step

A stepped flashing fails one step at a time. A single lifted edge lets rain slip behind the metal and run down inside the wall, so a ceiling stain can appear some distance away from the real fault. We look along the whole line, tap the pointing for hollow sounds, and photograph any step that has moved, so the repair you are quoted matches the length that is actually affected and nothing more.

What we check

Steps
lead set into the wall
Stack
all four sides of lead
Pointing
mortar line above the metal
Brick semis with concrete tile roofs and flat-roofed garages
A flat roof outlet and the edge of the covering.

Every route ends in a drain, and the survey follows it there.

OutletsOutlets, gutters and flat roofs in the centre of Westbourne

Rain that has crossed the slopes and passed the joins still has to leave. From a pitched roof it drops into the gutter, runs to an outlet and goes down a pipe to a gully. A flat roof is meant to lean towards an outlet set into its surface. Both get a close look from above: whether a gutter still leans the right way, whether the joints weep, whether the brackets have let a length sag, and whether the fascia board behind has gone soft under a thumb. Soffits, the boards closing the underside of the eaves, are checked for stains and for any vent painted over, because a blocked vent hides a timber problem. Our flat roofing page covers the membrane side, including what a relaid covering involves.

Flood Zone 3 takes in the centre of Westbourne, as the Environment Agency's flood map has it. The flood zone describes the ground. It sets no rule for a roof, and we do not read it as one. It is a reminder of something every survey already records: rainwater from a roof has to go somewhere. The written findings say where each pipe ends, whether the gully at the bottom is running free, and whether a downpipe empties against the very wall it is meant to protect.

BS 6229:2025 sets a minimum finished fall of 1:80 for membrane flat roofs, so the roof is designed steeper than that minimum, which leaves room for tolerances on site. A surface that still holds a puddle the morning after rain is telling you something about the fall or the outlet. We work out which, tell you if the membrane can be patched or needs renewing, and put photographs beside the written findings so the reasoning can be checked by anyone reading it, including a neighbour, a surveyor or a buyer.

After the downpipe

A gutter is worth only what it delivers to the drain. The survey tracks every pipe down to the ground, looks for one that finishes above the gully or a gully packed with silt and leaves, and records where the water lands. Roof faults and drain faults are written up under their own headings, so a roof is never blamed for a drain, and a drain is never excused for a roof fault it did not cause.

Where it shows

A ring-shaped stain on the ceiling beneath a flat roof, or damp on a wall alongside a downpipe.

Where it gets in

A split at the edge of the covering, a loose joint in a gutter, or an outlet silted shut.

Map of Westbourne and the places around it, with the dashed line of our 30-mile service area from Havant. The same places are listed below the map.

Westbourne flashings, church roofs and flat extensions

Why does a Westbourne survey spend so long where roofs meet walls?

Every join where a slope meets a wall depends on a strip of metal and the pointing above it, so a fault there lets water in behind the covering rather than on top of it. We look at every step of lead for lift, at the mortar line for gaps, and at a stack for splits on all four sides. From the loft we examine the timber beside the wall for staining. The survey then says whether a flashing can be re-dressed or must be replaced for its full length, and the photographs show you why, so the verdict never rests on our word alone.

Does the Parish Church of St John the Baptist need listed building consent?

The church is Grade I listed (National Heritage List entry 1026167), and the Church of England worships there still. A Church of England church in use goes through the faculty system rather than listed building consent, so work on the church building does not follow the council's listed building route. Nothing in that exemption extends to the houses nearby. Your own house, if it has an entry on the list, has no such shelter, and listed building consent from Chichester District Council is needed for anything affecting its character, so search the list for your address before planning anything, and tell us if there is an entry, since that changes the approach.

Who confirms whether a Westbourne address lies in the conservation area?

The Westbourne conservation area has its own boundary, and the body to settle whether your address sits inside it is Chichester District Council. A house re-roof is normally still permitted development there, though an Article 4 direction can strip further rights from an area. Ask Chichester District Council well ahead of the booking, and put its answer in with your papers, because the answer may change what we can propose or how we word the price. It can also tell you whether any Article 4 direction touches your own road.

Will stripping and recovering a Westbourne roof need permission?

Two tests apply, and they are not the same test. For building regulations, the Planning Portal says that where the work touches less than 25 per cent of the building envelope and less than 50 per cent of the roof, no application normally follows; approval comes in once a new covering is 15 per cent or more heavier. For Westbourne addresses we raise it with Chichester District Council's building control team well before the first tile goes on. Planning is dealt with in the guide linked on this page, so we do not restate it in this answer. Keep the reply with the survey, because a later owner may ask to see it.

What does a scaffold licence mean for a Westbourne house?

We arrange the licence with our scaffolder. Section 169 of the Highways Act 1980 is the law behind scaffold licences, and the fee at West Sussex County Council is £266 for one month, with at least 10 working days' notice before the scaffolding is erected. That notice is the reason we fix the start date with you beforehand and do not promise it over the phone. Nothing is erected before the licence arrives, so the dates you are given are dates that hold, and you are told straight away if the council's timing moves.

Does Flood Zone 3 at the centre of Westbourne affect a roof job?

The Environment Agency flood map shows the centre of Westbourne in Flood Zone 3. That statement concerns the ground, and it adds no requirement to how a roof is surveyed, repaired or covered. The roof matters to flooding only as a source of rainwater, which is why the written survey records where each downpipe ends and whether the drain at the bottom is taking the flow. If the foot of a pipe is blocked or aimed at a wall, it goes in the findings with a photograph beside it, together with what we would do about it and what it would add to the price.

How do you tell a failed flashing from a few slipped tiles?

By following the stain upward. A stain on the ceiling near a chimney breast or a party wall points to the join, so we start at the metal. A mark beneath a plain stretch of slope points to the covering, so we start with the tiles above it and the battens under them. A torch in the loft may decide it, because the timber shows where water has run. The survey writes down which of the two it is, so the repair goes to the place the water entered, and you can read the reasoning before agreeing to it.

What should I expect to see on a written quote for Westbourne work?

Expect a single figure that stands for the entire job, not a menu. Beneath it should sit a plain description of what we found, what we will do about it and the covering we will use, along with a line saying whether scaffolding and VAT are inside the figure. It follows a survey. A sound repair is priced first. Prices are good and fair, but compare like with like: a lower figure that omits scaffolding or VAT is shorter, not cheaper, and the gap returns later as an extra.

Where's the water showing?

You'll get one written total price.

Get a quote Call WhatsApp